Winston-Salem, North Carolina requires building permits for new construction and applicable alterations, additions and repairs.1 The joint Winston-Salem/Forsyth County Inspections Division issues building permits and enforces Winston-Salem zoning; the city has its own adopted land-use regulations.23 Septic approval for applicable lots inside the city stays with Forsyth County Environmental Health.4
At a glance
- Building permits
- Required for new construction and applicable alterations, additions and repairs1
- Zoning
- Winston-Salem UDO land-use regulations apply inside city limits3
- Septic
- Forsyth County Environmental Health; soil/site evaluation and construction authorization4
- Tiny homes
- State pathway for permanent dwellings requires building-code compliance and local zoning approval5
- Minimum dwelling size
- Housing-code room and occupancy standards; no single total-house minimum established here6
- Owner-builder
- Conditional state general-contractor licensure exemption; permit and affidavit requirements remain7
- Private wells
- Well construction permit from the local health department required8
Who to call
Building permits
Winston-Salem/Forsyth County Inspections Division
Winston-Salem/Forsyth County Inspections Division
Bryce A. Stuart Municipal Building 100 E First Street Winston-Salem, NC 27101
Building permits
Inspections Division — construction applications
Inspections Division — construction applications
Zoning
Planning Division — Land Use Administration
Planning Division — Land Use Administration
Bryce A. Stuart Municipal Building 100 E First Street Winston-Salem, NC 27102
Septic permits
Forsyth County Environmental Health — septic and existing-system releases
Forsyth County Environmental Health — septic and existing-system releases
799 North Highland Avenue Winston-Salem, NC 27101
Floodplain permits
Erosion Control Division — floodplain development review
Erosion Control Division — floodplain development review
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Winston-Salem means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Winston-Salem, NC?
Winston-Salem requires building permits for new construction and applicable alterations, additions and repairs, with Inspections enforcing North Carolina building codes and local development regulations.19 Winston-Salem publishes building and trade permit fees that vary with project type, valuation, size and inspection activity; ask Inspections for the fee applicable to your project.10 Winston-Salem’s cited ordinance requires a certificate of occupancy when construction costing $1,000 or more is completed and withholds permanent electrical connection approval until the requirement is satisfied.11
Who issues building permits in Winston-Salem, and where do you apply?
The Winston-Salem/Forsyth County Inspections Division is the joint agency that reviews plans and issues building, electrical, mechanical and plumbing permits for Winston-Salem.2 Call 336-727-2624 or use the office at Bryce A. Stuart Municipal Building, 100 E First Street, Winston-Salem, NC 27101.2 Single-family building applications go through GeoCivix, and paper permit applications are no longer accepted.1213 Licensed contractors can obtain mechanical, electrical and plumbing permits through BuildIT; property owners should contact the Permit Office for assistance.13
Does Winston-Salem have zoning, lot-size rules and setbacks?
Winston-Salem has zoning through the Unified Development Ordinances, which also include environmental and subdivision regulations.3 Winston-Salem district-specific uses and dimensional controls must be read together with the parcel’s zoning map; we could not confirm a single applicable lot-size, setback, height or lot-coverage figure for your parcel.14 Ask Land Use Administration to identify the district and applicable standards before choosing a house footprint or dividing land.1516 Recent UDO amendments may not appear in the online code, so ask Land Use Administration about amendments affecting your proposal.17
How do septic permits work inside Winston-Salem?
For a Winston-Salem lot not served by public or community sewer, Forsyth County Environmental Health evaluates soil and site conditions for an improvement permit and authorization for septic construction.4 Construction on a property with an existing septic system—including an outbuilding, pool or deck—requires a Health Department Release before a building permit; home additions and mobile-home replacement also require a release.18 Adding bedrooms may require another soil/site evaluation.18 Resolve wastewater approval before finalizing the building layout because the septic evaluation determines whether the lot is suitable for the proposed system.19
Can you live in an RV or tiny home in Winston-Salem?
We could not confirm Winston-Salem’s rules for residential RV occupancy or temporary camping on private land; ask Inspections about the proposed use and parcel before relying on an RV during construction.2 North Carolina accepts tiny homes as permanent single-family dwellings when the local building official permits them and building-code, foundation, sanitation and local zoning requirements are met.5 Winston-Salem’s housing code separately requires a principal room of at least 120 square feet and habitable-room floor space based on occupancy; those are room and occupancy standards, not a blanket total-house minimum.6 Ask Land Use Administration about accessory dwellings and manufactured-home placement on the specific lot.15
Building a home in Winston-Salem: what are the steps?
- Ask Land Use Administration to identify Winston-Salem zoning and any subdivision review needed for the parcel.1416
- For a septic-served lot, obtain the applicable county soil/site evaluation or existing-system Health Department Release before building-permit approval.19
- Submit the residential building application through GeoCivix with building plans, site plans and related documents in the electronic application.1213
- Arrange building and trade inspections through Inspections; contractor accounts can schedule inspections through BuildIT.12
- Obtain the required certificate of occupancy before the permanent electrical connection is approved for work covered by Winston-Salem’s completion requirement.11
What stays with Forsyth County, and what should Winston-Salem buyers check?
Forsyth County Environmental Health retains septic services for applicable Winston-Salem properties and requires a well construction permit for private water-supply wells.420 North Carolina requires local floodplain development approval for development in Special Flood Hazard Areas; Winston-Salem’s Erosion Control Division accepts floodplain review submittals electronically.2122 Ask Inspections to identify the driveway-access approval needed for your proposed entrance; we could not confirm the city’s complete driveway rule.2 For land outside Winston-Salem city limits, use the Forsyth County guide for the county’s zoning jurisdiction.23
Watch-outs
- The North Carolina owner-builder provision exempts qualifying owners from general-contractor licensure subject to ownership, intended occupancy, affidavit and supervision requirements; building-permit requirements still apply.7
- A chemical or portable toilet cannot substitute for a permanent wastewater connection where the North Carolina Building Code requires that connection; ask Environmental Health about the proposed sanitation system.24
- Recent Winston-Salem UDO amendments may not be reflected in the online code; ask Land Use Administration which adopted text applies.17
Sources
- Construction & Permits (Winston-Salem), quoted and re-checked
- Winston-Salem/Forsyth County Inspections Division (cityofws.org)
- Zoning & Subdivision (Winston-Salem), quoted and re-checked
- New Construction (Winston-Salem), quoted and re-checked
- Guidelines for Tiny Homes in North Carolina (North Carolina statewide rule), quoted and re-checked
- Sec. 10-197. Standards (Winston-Salem), quoted and re-checked
- G.S. 87-1. "General contractor" defined; exceptions. (North Carolina statewide rule), quoted and re-checked
- Rules Governing the Permitting and Inspection of Private Drinking Water Wells, 15A NCAC 02C .0300 (North Carolina statewide rule), quoted and re-checked
- Construction & Permits (Winston-Salem), quoted and re-checked
- Sec. 10-31. Fee schedule; determination of cost of work; connection to public sewer (Winston-Salem), quoted and re-checked
- Sec. 10-31. Fee schedule; determination of cost of work; connection to public sewer (Winston-Salem), quoted and re-checked
- cityofws.org (Winston-Salem), quoted and re-checked
- Inspections Division — construction applications (cityofws.org)
- Zoning & Subdivision (Winston-Salem), quoted and re-checked
- Planning Division — Land Use Administration (cityofws.org)
- Zoning & Subdivision (Winston-Salem), quoted and re-checked
- Land Use Administration — UDO assistance (cityofws.org)
- Forsyth County Environmental Health — septic and existing-system releases (co.forsyth.nc.us)
- General Information - Wastewater / Septic, quoted and re-checked
- Permitting & Inspecting, quoted and re-checked
- North Carolina Quick Guide: Applying for a Floodplain Development Permit (North Carolina statewide rule), quoted and re-checked
- Erosion Control Division — floodplain development review (cityofws.org)
- Inspections Division, quoted and re-checked
- G.S. 130A-335 PDF, subsection (h) (North Carolina statewide rule), quoted and re-checked
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.