Duplin County, North Carolina
Town of Beulaville is a town in Duplin County, North Carolina. Town of Beulaville adopts its own zoning, so inside its limits Town of Beulaville’s rules apply, not the county’s. 10 rules below are quoted from official sources and independently re-checked, most recently on November 6, 2026. Rules for unincorporated land are on the Duplin County page.
Land inside Beulaville town limits.
“Zoning/Planning Related Fees 25. Zoning Permit Application $25.00”
Town zoning and planning applications inside Beulaville town limits.
zoning permit application fee: 25 USD
“Effective 10/6/2025 Description Charge Zoning/Planning Related Fees 25. Zoning Permit Application $25.00”
Town of Beulaville does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Building work inside Beulaville town limits that is within G.S. 160D-1110(a).
“Except as provided in subsection (c) of this section, and subsection (h) of G.S. 160D-1110.1, no person shall commence or proceed with any of the following without first securing all permits required by the North Carolina State Building Code and any other State or local laws applicable to any of the following activities:”
Owner-built construction inside Beulaville town limits processed by Duplin County Building Inspections.
owner occupancy period: >= 1 year after completion (Owner may act as own general contractor only if intending to occupy and not sell or lease.)
“In NC an owner may act as their own General Contractor as long as the owner intends to occupy, not sell or lease the building being altered or constructed for a period of at least I year AFTER COMPLETION.”
Permitted construction inside Beulaville town limits administered by Duplin County Building Inspections.
“Inspections scheduled before 5 p.m. will normally be performed the following workday. The Duplin County Building Inspections will look over the work as often as necessary to ensure that it complies with state & local ordinances and terms of the permit.”
New buildings, additions, enlargements, and altered or moved buildings inside Beulaville town limits that are covered by G.S. 160D-1116.
“Except as provided by subsection (b) of this section, no new building or part thereof may be occupied, no addition or enlargement of an existing building may be occupied, and no existing building that has been altered or moved may be occupied, until the inspection department has issued a certificate of compliance.”
A residence, business, or public assembly inside Beulaville town limits in an area not served by an approved wastewater system.
“No person shall commence or assist in the installation, construction, or repair of a wastewater system unless an Improvement Permit and a Construction Authorization have been obtained from the Department or the local health department unless that person is acting in accordance with the conditions and criteria of an engineered option permit pursuant to G.S. 130A-336.1 or the Authorized On-Site Wastewater Evaluator permit option pursuant to G.S. 130A-336.2.”
New or repaired on-site wastewater systems inside Beulaville town limits.
“No system of wastewater collection, treatment and disposal shall be covered or placed into use by any person until an inspection by the local health department has determined that the system has been installed or repaired in accordance with any conditions of the Improvement Permit, the Construction Authorization, the rules, and this Article.”
On-site wastewater disposal for land inside Beulaville town limits not served by an approved wastewater system.
“No person shall commence or assist in the construction, location, or relocation of a residence, place of business, or place of public assembly in an area not served by an approved wastewater system unless an improvement permit and a construction authorization are obtained from the local health department unless that person is acting in accordance with the conditions and criteria of an engineered option permit pursuant to G.S. 130A-336.1 or the Authorized On-Site Wastewater Evaluator permit option pursuant to G.S. 130A-336.2.”
Private drinking water wells inside Beulaville town limits.
“No person shall construct a private drinking water well without first obtaining a well construction permit from the local health department.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Beulaville or Duplin County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Beulaville publishes no rule on the point, not that none exists. Duplin County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Beulaville means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.