The Town of Circle, Montana requires Town Council zoning approval before land use or building changes, with construction applications integrated into that process.1 Circle also requires electrical and plumbing permits for the dwelling work described in its building ordinance.2 McCone County handles on-site wastewater approval inside Circle, but no septic permit is required when sewage goes to an approved public system.3
At a glance
- Building permits
- Town construction application plus separate electrical and plumbing approvals2
- Zoning
- Town Council zoning permit before use or building changes1
- Septic permits
- McCone County approval for on-site systems; approved public sewer is excepted3
- RV living
- Motor homes, fifth wheels and camper trailers prohibited in Class A residence districts4
- Minimum lot size
- Class A: 7,000 square feet per dwelling5
- Town utilities
- Connect where Town water and sewer are available; accessory buildings excluded6
- Owner-installed septic
- Contractor-license exemption for your own residence, with wastewater approval still required7
Who to call
Building permits
Starting contact for Town Council zoning approval, construction applications and the Site Inspector
105 Main Circle, MT 59215
Septic permits
McCone County on-site wastewater questions and approvals
207 West Bell Glendive, MT 59330
Contact details are copied from each office’s official page and were checked against it on October 12, 2026.
Off-grid gear
Going off-grid in Town of Circle means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in the Town of Circle, MT?
Circle requires a Town Council zoning permit before land is occupied or used, or buildings are created, changed or converted; construction permits are integrated with zoning permits.1 Circle’s building chapter requires electrical and plumbing permits for the listed private-dwelling work and a written Town Council construction permit for demolition.2 Public and commercial buildings also require state building-code review and a Town Clerk construction application.2 Ask the Town Clerk to identify the approvals for your exact project rather than treating the rural county answer as permission to build in town.2
Who handles building applications in the Town of Circle?
Start with the Town Clerk for Circle construction applications and fee payment; the construction ordinance directs applicants to file a written application with the Site Inspector.28 Reach Town Hall at 406.485.2524 or [email protected].9 Circle construction applications call for a land description, proposed use or occupancy, duplicate plans and specifications, and a scaled lot plan identifying the responsible professional or person.1 Construction-permit fees are set by Town Council resolution and paid before issuance; starting work before obtaining the required permit doubles the fee under the code.8 Request the current fee schedule before submitting.
Does the Town of Circle have zoning and minimum lot sizes?
Circle requires Town Council approval that the proposed building, premises and use comply with town building, health and zoning provisions.1 In Circle’s Class A residence districts, lot area must be at least 7,000 square feet per dwelling.5 The Class A height limit is 25 feet or two stories, while Class B allows 40 feet or three stories.1011 Ask the Town Clerk to confirm your parcel’s district and applicable setbacks before selecting a floor plan. We could not confirm a minimum dwelling floor area or a lot-coverage formula for Circle; request a parcel-specific answer from the Town Clerk.
How do septic permits work inside the Town of Circle?
Circle buildings must connect to Town water and sewer where those services are available, excluding accessory buildings.6 For a project using piped water and intended for human occupancy, McCone County requires an on-site wastewater permit before construction unless sewage goes to an approved public system.3 Ask the McCone County Sanitarian about the on-site route at (406) 377-5772.12 On-site systems cannot be backfilled before inspection and approval unless self-inspection is authorized, and a new system cannot be used before final approval.13 A homeowner installing a system for their own residence on their own property can qualify for a contractor-license exemption, but wastewater permits and standards still apply.7
Can you live in an RV or tiny home in the Town of Circle?
Motor homes, fifth wheels and camper trailers are not allowed in Circle’s Class A residence districts.4 That district restriction is the starting point for an RV plan: establish the parcel’s district before buying or moving a vehicle onto it.4 We could not confirm a general temporary-camping allowance or a Circle rule specifically authorizing tiny-home occupancy; ask the Town Clerk about the proposed dwelling and duration of use. Circle’s zoning permit requirement covers proposed land use as well as building changes, so a small dwelling still needs a zoning answer.1 Town Council permission is required for temporary restroom facilities, and outside toilets are prohibited within town limits.6
Building a home in the Town of Circle: what are the steps?
- Ask the Town Clerk to confirm the zoning district and proposed use, then prepare the scaled plat showing lot size and dimensions for zoning approval.1
- Establish whether Town water and sewer are available; connect where required, or obtain the McCone County on-site wastewater approval for a qualifying septic project before construction.63
- Submit the construction application with the land description, use, plans and lot plan; arrange the electrical and plumbing approvals required for the work.2
- Pay the Town Clerk’s applicable construction fee before issuance and ask the Site Inspector for the inspection schedule.8
- Keep the septic installation exposed until inspection approval or authorized self-inspection, and obtain final approval before using a new system.13
What should you check before buying land in the Town of Circle?
For land outside town limits, use the McCone County guide for the rural building-permit answer; the county appears not to require residential building permits in unincorporated areas.14 Within Circle, ask the Town Clerk about utility availability and the flood-zone designation recorded during the construction-permit process.68 If a private well is part of your plan, Montana’s groundwater permit exception may cover uses at or below 35 gallons per minute and 10 acre-feet per year, subject to eligibility.15 Beginning in 2026, DNRC requires a Notice of Intent before using groundwater under that exception.15 We could not confirm Circle-specific private-well or curb-access standards; ask the Town Clerk before committing to either.
Watch-outs
- Circle’s Class A RV prohibition does not establish an RV allowance in another district; request the proposed use’s zoning approval from the Town Council.41
- A homeowner septic contractor-license exemption does not waive wastewater permits or inspections.7
- We could not confirm a separate Circle certificate-of-occupancy requirement or a building owner-builder exemption; ask the Town Clerk before relying on either.9
Sources
- § 155.13 Permits; Certificates of Occupancy (Town of Circle), quoted and re-checked
- § 151.02 Permit Required (Town of Circle), quoted and re-checked
- McCone County On-Site Wastewater Treatment Regulations (Town of Circle), quoted and re-checked
- § 155.26 Class A Residence Districts (Town of Circle), quoted and re-checked
- § 155.26 Class A Residence Districts (Town of Circle), quoted and re-checked
- § 155.08 Water, Sewer Connection Required; Outside Toilet Prohibited (Town of Circle), quoted and re-checked
- McCone County On-Site Wastewater Treatment Regulations, quoted and re-checked
- § 151.04 Construction Permit Fees (Town of Circle), quoted and re-checked
- Town of Circle Town Clerk (townofcircle.org)
- § 155.26 Class A Residence Districts (Town of Circle), quoted and re-checked
- § 155.27 Class B Residence Districts (Town of Circle), quoted and re-checked
- McCone County Sanitarian (mcconecountymt.gov)
- McCone County On-Site Wastewater Treatment Regulations, Section 6 (Town of Circle), quoted and re-checked
- McCone County (official site) (2026 county census)
- Exempt Well Updates and Information (Montana statewide rule), quoted and re-checked
Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.