Custer County, Montana
Miles City is a city in Custer County, Montana. Miles City adopts its own zoning, so inside its limits Miles City’s rules apply, not the county’s. 4 rules below are quoted from official sources and independently re-checked, most recently on October 18, 2026. Rules for unincorporated land are on the Custer County page.
Building work in Miles City city limits that is subject to the city building code and zoning code.
“Cross reference— Fire codes, § 11-76 et seq.; flood damage prevention, ch. 12; disposal of refuse and debris resulting from construction, § 19-12; construction standards for streets and sidewalks, § 20-39 et seq.; excavations, § 20-66 et seq.; subdivision design and improvement standards, § 21-36 et seq.; utilities, ch. 23; zoning, ch. 24; building permit required, § 24-12; building permit for mobile homes, § 24-17; footings, piers and caps for mobile homes, § 24-18.”
Buildings within the City of Miles City building-code enforcement area, including residential buildings containing fewer than five dwelling units and the structures specified in the city code.
“The current editions of the building codes and all accompanying appendices, amendments and modifications adopted by the building codes bureau, Montana Department of Labor and Industry (or its successor), as set out in the Administrative Rules of Montana, as amended from time to time by the building codes bureau, shall be adopted the city council by ordinance, as authorized by MCA 50-60-301(1)(b), except for any exceptions noted in this chapter or any regulations not applicable to local government jurisdictions.”
Land within Miles City city limits.
“Cross reference— Fire codes, § 11-76 et seq.; flood damage prevention, ch. 12; disposal of refuse and debris resulting from construction, § 19-12; construction standards for streets and sidewalks, § 20-39 et seq.; excavations, § 20-66 et seq.; subdivision design and improvement standards, § 21-36 et seq.; utilities, ch. 23; zoning, ch. 24; building permit required, § 24-12; building permit for mobile homes, § 24-17; footings, piers and caps for mobile homes, § 24-18.”
New construction, substantial improvements, alterations, manufactured homes, fill, excavation, and other artificial obstructions in Miles City regulated flood hazard areas.
“Except for prohibited artificial obstructions in section 12-27, all other artificial obstructions including new construction, substantial improvements, alterations to residential, and nonresidential structures including manufactured homes, and related suitable fill or excavation shall be allowed by permit and are subject to the requirements in this section and general requirements of section 12-36, with the exception of the encroachment limit of section 12-36(2).”
We looked and could not find an official answer yet. Silence is not permission; ask Miles City or Custer County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Miles City publishes no rule on the point, not that none exists. Custer County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Miles City means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.