Town of Coffeeville is a town in Yalobusha County, Mississippi. Septic permits inside Town of Coffeeville come from the state health agency. 5 rules below are quoted from official sources and independently re-checked, most recently on November 5, 2026. Rules for unincorporated land are on the Yalobusha County page.
Town of Coffeeville does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
On-site wastewater systems serving property inside Coffeeville town limits, where central sewer is not used.
“By law, sewer systems have first-right to provide sewer to everyone. As such, MSDH automatically refers applications within one (1) mile of a sewer line to connect. We must receive a Letter of Rejection from the sewer provider before we can proceed with the application.”
Installation of an on-site wastewater disposal system inside Coffeeville town limits.
“The Permit is required for a water meter and the installation of an on-site wastewater disposal system.”
An on-site wastewater system inside Coffeeville town limits using the Notice of Intent exemption.
minimum acreage for exemption application: > 2 acres (Notice of Intent - Exemption form)
“You will receive a recommendation for disposal systems appropriate for your site. The Department WILL NOT inspect your system during installation.”
Wastewater disposal at property inside Coffeeville town limits that is not served by central sewer.
“Mississippi does not recognize gray water. Anything that could be considered gray water in other states is classified as wastewater in Mississippi. All wastewater is required to pipe into a central sewer system or a septic system for proper disposal. No “gray water” can be discharged on the ground, ditches, or bodies of water.”
A permanent water-meter connection for property inside Coffeeville town limits.
sewer-line referral distance: <= 1 mile (MSDH automatically refers on-site wastewater applications within this distance to connect)
“State law requires you have permanent sewage disposal solution available to receive a permanent water meter. Permanent sewage disposal solutions can be a sewer line or septic system. You must have a sewer option before a water utility can make a connection to your property.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Coffeeville or Yalobusha County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Coffeeville publishes no rule on the point, not that none exists. Yalobusha County’s page lists the county offices to call.
Off-grid gear