Tishomingo County, Mississippi
Town of Burnsville is a town in Tishomingo County, Mississippi. Septic permits inside Town of Burnsville come from the state health agency. 8 rules below are quoted from official sources and independently re-checked, most recently on November 5, 2026. Rules for unincorporated land are on the Tishomingo County page.
Town of Burnsville does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Individual onsite wastewater systems serving property inside Burnsville town limits, where state onsite-wastewater jurisdiction applies.
“Submitting a Notice of Intent to the Department”
Installation of an onsite wastewater disposal system serving property inside Burnsville town limits.
“The Permit is required for a water meter and the installation of an on-site wastewater disposal system.”
Design-based individual onsite wastewater systems serving property inside Burnsville town limits.
“Inspect, approve/disapprove all Design-based Systems”
Disposal of human excreta and other liquid waste at places inside Burnsville town limits where people reside, are employed, or congregate.
“No “gray water” can be discharged on the ground, ditches, or bodies of water.”
Places inside Burnsville town limits where people reside, are employed, or congregate.
“Where a Centralized Wastewater Treatment System is available”
Developments of land inside Burnsville town limits that are subject to Mississippi Department of Health onsite-wastewater subdivision review.
standard subdivision threshold: >= 10 lots (County ordinances may lower the minimum number of lots.)
“Subdivision: Any land divided into ten (10) or more lots”
Mississippi Department of Health onsite-wastewater permits and related reviews serving property inside Burnsville town limits.
Notice of Intent plus Final Approval: 197.5 USD · Notice of Intent plus Exemption: 100 USD · Subdivision review: 325 USD (plus $6.50 per lot)
“Notice of Intent + Final Approval is currently $197.50 Notice of Intent + Exemption is currently $100 Existing Residential Inspection is currently $100 Private Water Well Sample is currently $10 Non-residential Water Meter is currently $0 Commercial Establishment + Final Approval is currently $412.50 Existing Commercial Establishment is currently $315 Commercial Development is currently $412.50 + $2.60/unit. A unit can be an apartment, house, trailer, RV or any other independent quarters for a single family. Subdivision is currently $325 + $6.50/lot Online payment will be subject to a processing fee. All fees are subject to change. Additional costs may be included if online application is not used.”
Mississippi Department of Health onsite-wastewater applications serving property inside Burnsville town limits.
“MSDH requires – at minimum – a description of the property in the form of your deed or survey and a plot plan that is drawn to show all current and future plans for the property. A tax map, house plans, architect plans (showing house location on property) and the like may also be included but are not required.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Burnsville or Tishomingo County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Burnsville publishes no rule on the point, not that none exists. Tishomingo County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Burnsville means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.