Town of Falkner is a town in Tippah County, Mississippi. Septic permits inside Town of Falkner come from the state health agency. 6 rules below are quoted from official sources and independently re-checked, most recently on November 5, 2026. Rules for unincorporated land are on the Tippah County page.
Town of Falkner does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
On-site wastewater matters inside Falkner town limits, administered under the Mississippi State Department of Health program; the program expressly addresses investigations within city limits.
“The On-site Wastewater program develops policy and regulations”
Installation of an on-site wastewater disposal system inside Falkner town limits.
Notice of Intent + Final Approval: 197.5 USD (Current fee; all fees are subject to change.) · Notice of Intent + Exemption: 100 USD (Current fee; all fees are subject to change.)
“The Permit is required for a water meter and the installation of an on-site wastewater disposal system.”
New single-family on-site wastewater systems inside Falkner town limits.
“The exemption application is exclusively for new, single-family residences installing a septic system for the first time. Any property that is commercial or replacing an existing system are not eligible. It may be applied for the first residence on a parcel of land of two (2) or more acres or second residence on a parcel of land of five (5) or more acres.”
Wastewater disposal inside Falkner town limits when not served by central sewer.
“Mississippi does not recognize gray water. Anything that could be considered gray water in other states is classified as wastewater in Mississippi. All wastewater is required to pipe into a central sewer system or a septic system for proper disposal. No “gray water” can be discharged on the ground, ditches, or bodies of water.”
Properties inside Falkner town limits seeking an MSDH on-site wastewater application where a sewer line is near the property.
sewer-line referral distance: <= 1 mile (Applies to MSDH applications within one mile of a sewer line.)
“By law, sewer systems have first-right to provide sewer to everyone. As such, MSDH automatically refers applications within one (1) mile of a sewer line to connect. We must receive a Letter of Rejection from the sewer provider before we can proceed with the application.”
Subdivision development inside Falkner town limits that is subject to the statewide MSDH on-site-wastewater review program.
MSDH subdivision threshold: >= 10 lots (County ordinances may lower the minimum number of lots.) · feasibility-study threshold: > 35 lots (Also required when applying for a new phase.)
“A subdivision is any development of land into ten (10) or more lots. County ordinances may lower the minimum number of lots. If the development will utilize public water, the Bureau of Public Water Supply may require a subdivision review, regardless of lot count.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Falkner or Tippah County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Falkner publishes no rule on the point, not that none exists. Tippah County’s page lists the county offices to call.