Drew is a city in Sunflower County, Mississippi. Septic permits inside Drew come from the state health agency. 8 rules below are quoted from official sources and independently re-checked, most recently on November 5, 2026. Rules for unincorporated land are on the Sunflower County page.
Drew does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Buildings inside Drew city limits only to the extent the statewide Mississippi Fire Prevention Code applies.
building height threshold: >= 75 feet (State Fire Marshal code applicability category)
“All buildings utilized for public assembly [...] not less than seventy-five (75) feet in height”
Individual on-site wastewater systems inside Drew city limits.
“Division – the Mississippi State Department of Health, Division of On-site Wastewater”
Installation of an on-site wastewater disposal system inside Drew city limits.
“The Permit is required for a water meter and the installation of an on-site wastewater disposal system.”
On-site wastewater disposal systems inside Drew city limits that require Final Approval.
“All IOWDS which requires a Final Approval must be evaluated”
Wastewater disposal inside Drew city limits.
“Mississippi does not recognize gray water. Anything that could be considered gray water in other states is classified as wastewater in Mississippi. All wastewater is required to pipe into a central sewer system or a septic system for proper disposal. No “gray water” can be discharged on the ground, ditches, or bodies of water.”
A permanent water-meter connection for property inside Drew city limits.
“State law requires you have permanent sewage disposal solution available to receive a permanent water meter. Permanent sewage disposal solutions can be a sewer line or septic system. You must have a sewer option before a water utility can make a connection to your property. If public sewer is not available in your area, you will have to apply to us for the proper paperwork.”
MSDH on-site wastewater applications for property inside Drew city limits.
Notice of Intent plus Final Approval: 197.5 USD · Notice of Intent plus Exemption: 100 USD · Existing Residential Inspection: 100 USD · Subdivision application: 325 USD (plus $6.50 per lot)
“Notice of Intent + Final Approval is currently $197.50”
MSDH on-site wastewater permitting for property inside Drew city limits.
“Submitting a Notice of Intent to the Department”
We looked and could not find an official answer yet. Silence is not permission; ask Drew or Sunflower County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Drew publishes no rule on the point, not that none exists. Sunflower County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Drew means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.