Smith County, Mississippi
Town of Taylorsville is a town in Smith County, Mississippi. Septic permits inside Town of Taylorsville come from the state health agency. 7 rules below are quoted from official sources and independently re-checked, most recently on November 6, 2026. Rules for unincorporated land are on the Smith County page.
Town of Taylorsville does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
On-site wastewater systems serving land inside Taylorsville town limits, subject to Mississippi Department of Health requirements.
“All regulations shall be applied uniformly in all areas of the state”
Installation of an on-site wastewater disposal system serving land inside Taylorsville town limits.
“The Permit is required for a water meter and the installation of an on-site wastewater disposal system.”
Installation of an on-site wastewater disposal system serving land inside Taylorsville town limits.
advance notice before construction: 24 hours
“contacting the Department 24 hours BEFORE beginning construction”
Off-grid sanitation serving homes inside Taylorsville town limits.
“Mississippi does not recognize gray water.”
A new home inside Taylorsville town limits seeking a permanent water meter and located within one mile of a sewer line.
distance from sewer line: <= 1 mile (A letter of rejection from the sewer provider is required before MSDH proceeds with the application.)
“By law, sewer systems have first-right to provide sewer to everyone. As such, MSDH automatically refers applications within one (1) mile of a sewer line to connect. We must receive a Letter of Rejection from the sewer provider before we can proceed with the application.”
Mississippi Department of Health on-site wastewater applications serving land inside Taylorsville town limits.
Notice of Intent plus Final Approval: 197.5 USD · Notice of Intent plus Exemption: 100 USD · Existing Residential Inspection: 100 USD · Subdivision application: 325 USD (plus $6.50 per lot)
“Notice of Intent + Final Approval is currently $197.50 Notice of Intent + Exemption is currently $100 Existing Residential Inspection is currently $100 Private Water Well Sample is currently $10 Non-residential Water Meter is currently $0 Commercial Establishment + Final Approval is currently $412.50 Existing Commercial Establishment is currently $315 Commercial Development is currently $412.50 + $2.60/unit. A unit can be an apartment, house, trailer, RV or any other independent quarters for a single family. Subdivision is currently $325 + $6.50/lot Online payment will be subject to a processing fee. All fees are subject to change. Additional costs may be included if online application is not used. See other FAQ questions for details about application types.”
Mississippi Department of Health on-site wastewater permits serving land inside Taylorsville town limits.
“Apply for the Notice of Intent first. We have to ensure that a) a standard septic tank would work and b) if your county requires an Approval or not. Installing your own septic tank is not as easy as it sounds, and you must comply with our regulations for the installation.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Taylorsville or Smith County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Taylorsville publishes no rule on the point, not that none exists. Smith County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Taylorsville means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.