Zoning, building permits and septic rules in Village of Puckett, Mississippi

Village of Puckett is a village in Rankin County, Mississippi. Septic permits inside Village of Puckett come from the state health agency. 7 rules below are quoted from official sources and independently re-checked, most recently on November 6, 2026. Rules for unincorporated land are on the Rankin County page.

Answers from the rulebook for Village of Puckett

Rules another office applies inside Village of Puckett

Village of Puckett does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Who permits septicState (with conditions)

    On-site wastewater systems for land inside Puckett village limits, subject to MSDH jurisdiction and sewer availability.

    • MSDH directs applicants with an available sewer line to sewer service rather than its on-site wastewater process.
    “If public sewer is not available in your area, you will have to apply to us for the proper paperwork.”
  • Septic permitRequired

    Installation of an on-site wastewater disposal system inside Puckett village limits.

    • The requirement applies to on-site systems; available sewer may instead be the applicable permanent disposal solution.
    “The Permit is required for a water meter and the installation of an on-site wastewater disposal system.”
  • Septic inspectionLimited

    New single-family on-site wastewater systems inside Puckett village limits that qualify for the MSDH exemption application.

    • The exemption is exclusively for a first septic system at a new single-family residence.
    • conditions for exemption include a first residence on a parcel of two or more acres, or a second residence on a parcel of five or more acres.

    first-residence parcel size: >= 2 acres (New single-family residence installing a septic system for the first time.) · second-residence parcel size: >= 5 acres (New single-family residence installing a septic system for the first time.)

    “do not go out to approve the installation”
  • Off-grid sanitationLimited

    Off-grid wastewater disposal inside Puckett village limits.

    • Wastewater must be routed to central sewer or a septic system for proper disposal.
    • Gray water cannot be discharged to ground, ditches, or bodies of water.
    “All wastewater is required to pipe into a central sewer system or a septic system for proper disposal. No “gray water” can be discharged on the ground, ditches, or bodies of water.”
  • Mandatory utility hookupConditional

    A permanent water-meter connection for property inside Puckett village limits.

    • A permanent sewage-disposal solution must be available.
    • If a public sewer is unavailable, the applicant must apply to MSDH for on-site wastewater paperwork.
    • MSDH automatically refers applications within one mile of a sewer line to connect and requires a sewer-provider rejection letter before proceeding with the application.

    sewer-line referral distance: <= 1 mile (MSDH automatically refers applications within this distance to connect.)

    “State law requires you have permanent sewage disposal solution available to receive a permanent water meter.”
  • Permit feesPublished (with conditions)

    MSDH on-site wastewater applications for property inside Puckett village limits.

    • Online payments are subject to a processing fee.
    • All fees are subject to change.
    • Additional costs may be included if the online application is not used.

    Notice of Intent plus Final Approval: 197.5 USD · Notice of Intent plus Exemption: 100 USD · Existing Residential Inspection: 100 USD · Subdivision application: 325 USD (Plus $6.50 per lot.)

    “Notice of Intent + Final Approval is currently $197.50 Notice of Intent + Exemption is currently $100 Existing Residential Inspection is currently $100”
  • Permit processPublished (with conditions)

    MSDH on-site wastewater application process for property inside Puckett village limits.

    • MSDH must receive application, payment, and necessary documents before scheduling a site visit.
    • MSDH states an average five-to-ten-business-day visit time after receipt of all required items.

    average site-visit turnaround: 5-10 business days (After MSDH has application, payment, and necessary documents.)

    “We must have the application, payment, and necessary documents before we schedule a visit. Once we have everything, we average 5-10 business days to visit the property based on weather and the volume of applications in your area.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Village of Puckett or Rankin County directly.

  • Building permit — Residential construction inside Puckett village limits.
  • Owner-builder exemption — Owner-builder construction inside Puckett village limits.
  • Building code adopted — Building-code adoption for construction inside Puckett village limits.
  • Inspections — Building inspections for construction inside Puckett village limits.
  • Certificate of occupancy — Occupancy of buildings inside Puckett village limits.
18 more unanswered
  • Local zoning
  • Zoning districts
  • Minimum dwelling size
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Well permit
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Village of Puckett publishes no rule on the point, not that none exists. Rankin County’s page lists the county offices to call.

← All of Rankin County: county rules, score and offices