Town of Lambert is a town in Quitman County, Mississippi. Septic permits inside Town of Lambert come from the state health agency. 7 rules below are quoted from official sources and independently re-checked, most recently on November 5, 2026. Rules for unincorporated land are on the Quitman County page.
Town of Lambert does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
On-site wastewater systems statewide, including inside Lambert town limits.
“The Permit is required for a water meter and the installation of an on-site wastewater disposal system.”
Installation of an on-site wastewater disposal system statewide, including inside Lambert town limits.
“The Permit is required for a water meter and the installation of an on-site wastewater disposal system.”
On-site wastewater systems statewide, including inside Lambert town limits.
first-residence parcel area for exemption: >= 2 acres (Single tract; new single-family residence installing septic for the first time.) · second-residence parcel area for exemption: >= 5 acres (Single tract; new single-family residence installing septic for the first time.)
“The exemption application is exclusively for new, single-family residences installing a septic system for the first time. Any property that is commercial or replacing an existing system are not eligible. It may be applied for the first residence on a parcel of land of two (2) or more acres or second residence on a parcel of land of five (5) or more acres. There are two differences between the exemption and the regular application.”
Wastewater disposal statewide, including inside Lambert town limits.
“Mississippi does not recognize gray water.”
Water wells statewide, including inside Lambert town limits.
surface casing diameter: >= 6 inches (Some exclusions apply.)
“groundwater withdrawal permit for water wells with surface casing diameters 6- inches or greater in diameter. Some exclusions apply to this requirement.”
Permanent water-meter connections statewide, including inside Lambert town limits.
“State law requires you have permanent sewage disposal solution available to receive a permanent water meter. Permanent sewage disposal solutions can be a sewer line or septic system. You must have a sewer option before a water utility can make a connection to your property. If public sewer is not available in your area, you will have to apply to us for the proper paperwork.”
Subdivision activity inside Lambert town limits.
“Quitman County has adopted subdivision regulations. The county ordinance also includes the Town of Lambert and City of Marks.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Lambert or Quitman County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Lambert publishes no rule on the point, not that none exists. Quitman County’s page lists the county offices to call.