Town of Crowder is a town in Quitman County, Mississippi. Septic permits inside Town of Crowder come from the state health agency. 7 rules below are quoted from official sources and independently re-checked, most recently on November 5, 2026. Rules for unincorporated land are on the Quitman County page.
Town of Crowder does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Individual on-site wastewater systems inside Crowder town limits.
“The Permit is required for a water meter and the installation of an on-site wastewater disposal system.”
Installation of an individual on-site wastewater disposal system inside Crowder town limits.
“installation of an on-site wastewater disposal system”
New individual on-site wastewater systems inside Crowder town limits when the applicant selects or must obtain final approval.
advance notice before construction: 24 hours (Certified Installer contacts the Department to schedule an inspection.)
“contacting the Department 24 hours BEFORE beginning construction to schedule an inspection.”
Off-grid wastewater disposal inside Crowder town limits.
“Mississippi does not recognize gray water. Anything that could be considered gray water in other states is classified as wastewater in Mississippi. All wastewater is required to pipe into a central sewer system or a septic system for proper disposal. No “gray water” can be discharged on the ground, ditches, or bodies of water.”
Groundwater withdrawal wells inside Crowder town limits.
surface casing diameter: >= 6 inches (Some exclusions apply to the groundwater-withdrawal permit requirement.)
“State law requires that you obtain a groundwater withdrawal permit for water wells with surface casing diameters 6-inches or greater in diameter.”
A property inside Crowder town limits seeking a permanent water-meter connection.
sewer-line referral distance: <= 1 mile (MSDH requires a Letter of Rejection from the sewer provider before it proceeds with the on-site application.)
“before a water utility can make a connection”
Mississippi Department of Health on-site wastewater applications for property inside Crowder town limits.
Notice of Intent plus Final Approval: 197.5 USD (Current listed fee; online processing fee may apply.) · Notice of Intent plus Exemption: 100 USD (Current listed fee; online processing fee may apply.) · Subdivision wastewater review: 325 USD (Plus $6.50 per lot; online processing fee may apply.)
“Notice of Intent + Final Approval is currently $197.50 Notice of Intent + Exemption is currently $100 Existing Residential Inspection is currently $100 Private Water Well Sample is currently $10 Non-residential Water Meter is currently $0 Commercial Establishment + Final Approval is currently $412.50 Existing Commercial Establishment is currently $315 Commercial Development is currently $412.50 + $2.60/unit. A unit can be an apartment, house, trailer, RV or any other independent quarters for a single family. Subdivision is currently $325 + $6.50/lot Online payment will be subject to a processing fee. All fees are subject to change. Additional costs may be included if online application is not used. See other FAQ questions for details about application types.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Crowder or Quitman County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Crowder publishes no rule on the point, not that none exists. Quitman County’s page lists the county offices to call.