Bolthole Index

Quitman County, Mississippi

Zoning, building permits and septic rules in Town of Crowder, Mississippi

Town of Crowder is a town in Quitman County, Mississippi. Septic permits inside Town of Crowder come from the state health agency. 7 rules below are quoted from official sources and independently re-checked, most recently on November 5, 2026. Rules for unincorporated land are on the Quitman County page.

Answers from the rulebook for Town of Crowder

Rules another office applies inside Town of Crowder

Town of Crowder does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Who permits septicState (with conditions)

    Individual on-site wastewater systems inside Crowder town limits.

    • This statewide Mississippi Department of Health rule applies when an individual on-site wastewater disposal system is installed.
    • Central sewer availability may affect whether an on-site system can proceed.
    “The Permit is required for a water meter and the installation of an on-site wastewater disposal system.”
  • Septic permitRequired

    Installation of an individual on-site wastewater disposal system inside Crowder town limits.

    • The permit is required for installation of an on-site wastewater disposal system.
    • A sewer provider has first right to provide service; MSDH automatically refers applications within one mile of a sewer line to connect and requires a provider rejection before proceeding with an on-site application.
    “installation of an on-site wastewater disposal system”
  • Septic inspectionLimited

    New individual on-site wastewater systems inside Crowder town limits when the applicant selects or must obtain final approval.

    • The certified installer must contact the Department 24 hours before construction to schedule the inspection.
    • A two-acre exemption may be selected only where the applicant owns at least two acres for one dwelling or five acres for two dwellings, final approval is not required by listed entities, and the applicant files an affidavit; MSDH reserves a right to inspect such systems after more than 30 days of use.

    advance notice before construction: 24 hours (Certified Installer contacts the Department to schedule an inspection.)

    “contacting the Department 24 hours BEFORE beginning construction to schedule an inspection.”
  • Off-grid sanitationLimited

    Off-grid wastewater disposal inside Crowder town limits.

    • Mississippi classifies gray water as wastewater.
    • Wastewater must be piped to a central sewer system or septic system; discharge on ground, ditches, or bodies of water is not allowed.
    • An on-site wastewater permit is required for installation.
    “Mississippi does not recognize gray water. Anything that could be considered gray water in other states is classified as wastewater in Mississippi. All wastewater is required to pipe into a central sewer system or a septic system for proper disposal. No “gray water” can be discharged on the ground, ditches, or bodies of water.”
  • Well permitLimited

    Groundwater withdrawal wells inside Crowder town limits.

    • A groundwater withdrawal permit is required for wells with surface-casing diameters of six inches or greater.
    • Some exclusions apply.
    • MDEQ licenses and regulates water-well contractors and drillers statewide.

    surface casing diameter: >= 6 inches (Some exclusions apply to the groundwater-withdrawal permit requirement.)

    “State law requires that you obtain a groundwater withdrawal permit for water wells with surface casing diameters 6-inches or greater in diameter.”
  • Mandatory utility hookupConditional

    A property inside Crowder town limits seeking a permanent water-meter connection.

    • State law requires a permanent sewage-disposal solution before a permanent water meter.
    • Solutions may be a sewer line or septic system.
    • If public sewer is unavailable, the applicant must apply to MSDH for the proper paperwork.
    • MSDH automatically refers applications within one mile of a sewer line to connect and requires a sewer-provider letter of rejection before proceeding with an on-site application.

    sewer-line referral distance: <= 1 mile (MSDH requires a Letter of Rejection from the sewer provider before it proceeds with the on-site application.)

    “before a water utility can make a connection”
  • Permit feesPublished (with conditions)

    Mississippi Department of Health on-site wastewater applications for property inside Crowder town limits.

    • The listed fees apply to the specified MSDH wastewater application types, not to an unverified Crowder building permit.
    • Online payment is subject to a processing fee.
    • All fees are subject to change, and additional costs may apply where an online application is not used.

    Notice of Intent plus Final Approval: 197.5 USD (Current listed fee; online processing fee may apply.) · Notice of Intent plus Exemption: 100 USD (Current listed fee; online processing fee may apply.) · Subdivision wastewater review: 325 USD (Plus $6.50 per lot; online processing fee may apply.)

    “Notice of Intent + Final Approval is currently $197.50 Notice of Intent + Exemption is currently $100 Existing Residential Inspection is currently $100 Private Water Well Sample is currently $10 Non-residential Water Meter is currently $0 Commercial Establishment + Final Approval is currently $412.50 Existing Commercial Establishment is currently $315 Commercial Development is currently $412.50 + $2.60/unit. A unit can be an apartment, house, trailer, RV or any other independent quarters for a single family. Subdivision is currently $325 + $6.50/lot Online payment will be subject to a processing fee. All fees are subject to change. Additional costs may be included if online application is not used. See other FAQ questions for details about application types.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Town of Crowder or Quitman County directly.

  • Building permit — Residential construction inside Crowder town limits.
  • Owner-builder exemption — Owner-built residential construction inside Crowder town limits.
  • Building code adopted — Building construction inside Crowder town limits.
  • Inspections — Building construction inside Crowder town limits.
  • Certificate of occupancy — Occupancy of buildings inside Crowder town limits.
17 more unanswered
  • Local zoning
  • Zoning districts
  • Minimum dwelling size
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Town of Crowder publishes no rule on the point, not that none exists. Quitman County’s page lists the county offices to call.

← All of Quitman County: county rules, score and offices