Newton County, Mississippi
Town of Union is a town in Newton County, Mississippi. Septic permits inside Town of Union come from the state health agency. 7 rules below are quoted from official sources and independently re-checked, most recently on November 6, 2026. Rules for unincorporated land are on the Newton County page.
Town of Union does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Individual on-site wastewater systems and permanent water-meter applications inside Union town limits.
“The On-site Wastewater program develops policy and regulations and provides technical assistance to regional environmentalists in designing and inspecting Individual On-site Wastewater Disposal Systems (IOWDS)”
Installation of an individual on-site wastewater disposal system inside Union town limits.
“first submitted a notice of intent to the department.”
A new individual on-site wastewater disposal system using MSDH's soil-and-site-evaluation plus final-approval process inside Union town limits.
advance notice: >= 24 hours (Certified Installer must contact the Department before beginning construction to schedule the inspection)
“The Certified Installer is responsible for contacting the Department 24 hours BEFORE beginning construction to schedule an inspection.”
Wastewater disposal for homes and other uses inside Union town limits.
“Mississippi does not recognize gray water.”
A property inside Union town limits seeking a permanent water-meter connection.
sewer-line referral distance: <= 1 mile (MSDH automatically refers applications within this distance of a sewer line to connect)
“No public utility supplying water shall make connection [...] without the prior written approval of the department”
MSDH onsite-wastewater applications for property inside Union town limits.
Notice of Intent + Final Approval: 197.5 USD (currently listed by MSDH) · Notice of Intent + Exemption: 100 USD (currently listed by MSDH)
“Notice of Intent + Final Approval is currently $197.50 Notice of Intent + Exemption is currently $100”
New individual on-site wastewater disposal systems inside Union town limits.
“STEP 1 – Fill out application, submit required documentation”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Union or Newton County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Union publishes no rule on the point, not that none exists. Newton County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Union means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.