Montgomery County, Mississippi
Town of Duck Hill is a town in Montgomery County, Mississippi. Septic permits inside Town of Duck Hill come from the state health agency. 6 rules below are quoted from official sources and independently re-checked, most recently on November 5, 2026. Rules for unincorporated land are on the Montgomery County page.
Town of Duck Hill does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Individual on-site wastewater systems, including systems serving property inside Duck Hill town limits.
“The On-site Wastewater program develops policy and regulations and provides technical assistance to regional environmentalists in designing and inspecting Individual On-site Wastewater Disposal Systems (IOWDS), recreational vehicle campgrounds/lodging parks, septage pumpers/haulers and individual water supplies.”
Installation of an on-site wastewater disposal system inside Duck Hill town limits.
“The Permit is required for a water meter and the installation of an on-site wastewater disposal system.”
Wastewater disposal from residences inside Duck Hill town limits.
“Mississippi does not recognize gray water. Anything that could be considered gray water in other states is classified as wastewater in Mississippi. All wastewater is required to pipe into a central sewer system or a septic system for proper disposal. No “gray water” can be discharged on the ground, ditches, or bodies of water.”
Sewer-service availability affecting water-meter service for property inside Duck Hill town limits.
distance from sewer line: <= 1 mile (MSDH automatically refers applications to connect)
“By law, sewer systems have first-right to provide sewer to everyone. As such, MSDH automatically refers applications within one (1) mile of a sewer line to connect. We must receive a Letter of Rejection from the sewer provider before we can proceed with the application.”
MSDH on-site wastewater applications for property inside Duck Hill town limits.
Notice of Intent plus Final Approval: 197.5 USD · Notice of Intent plus Exemption: 100 USD · Existing Residential Inspection: 100 USD · Subdivision application: 325 USD (plus $6.50 per lot)
“Notice of Intent + Final Approval is currently $197.50 Notice of Intent + Exemption is currently $100 Existing Residential Inspection is currently $100 [...] Subdivision is currently $325 + $6.50/lot Online payment will be subject to a processing fee. All fees are subject to change. Additional costs may be included if online application is not used.”
MSDH new on-site wastewater-system applications for property inside Duck Hill town limits.
“File a complete application. Our application forms for new onsite wastewater systems are now online. Apply online using the button below. [...] Pay fees. Once we receive a complete application, we will e-mail you a link to an online payment system (there is a small additional fee for online payment). Follow the link in the e-mail message to pay your fee; you should receive a receipt by e-mail. No cash payments or checks will be received in the county offices for environmental fees.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Duck Hill or Montgomery County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Duck Hill publishes no rule on the point, not that none exists. Montgomery County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Duck Hill means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.