Brookhaven, Mississippi has a city building-permit application process and its own zoning ordinance.12 For land inside Brookhaven city limits in Lincoln County, contact the city Building Inspector about construction and the city office about parcel zoning.34 Septic installation requires a Mississippi State Department of Health permit, and permanent water service depends on an available sewage-disposal solution.567
At a glance
- Building permits
- City application requires plans, deed copy and completed form1
- Zoning
- City zoning applies inside Brookhaven city limits2
- Septic permits
- Required for onsite systems; administered by MSDH65
- Mobile homes
- Moving permit required; siting limits differ for single-wide and double-wide homes8
- Residential setbacks
- R-1: front 35 feet, side 10 feet, rear 25 feet9
- Water connection
- Permanent sewage disposal must be available before permanent water-meter connection7
- Owner-builder
- State licensing exemption for work on your own residence does not waive local building requirements10
Who to call
Building permits
City of Brookhaven Public Works Department / Building Inspector
City building inspection and building-permit questions inside Brookhaven city limits
P.O. Box 560 Brookhaven, MS 39602
Planning & zoning
City of Brookhaven Building Permit and Zoning Office
Building-permit applications, fee questions and parcel zoning assistance
Septic permits
Mississippi State Department of Health, Division of On-Site Wastewater
On-site wastewater applications and private-well sampling for Brookhaven
570 East Woodrow Wilson Drive Jackson, MS 39216
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Brookhaven means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Brookhaven, MS?
Brookhaven publishes a city building-permit application process requiring 2 sets of plans, a copy of the deed and a completed application; depending on the job, review may take 2 weeks.1 Ask the city Building Inspector which building permit and inspections your particular project needs before ordering materials.3
Brookhaven also requires city-inspector involvement for electrical work when power has been off for 6 months or longer, or when work requires service disconnection.114 Gas work requires a permit when the meter has been removed or gas has been off for 6 months or longer; electrical work must be performed by a licensed electrician and gas work by a licensed plumber.114
Who handles Brookhaven building permits and zoning questions?
The Brookhaven Public Works Department lists the Building Inspector at 601-833-7766 and gives its mailing address as P.O. Box 560 Brookhaven, MS 39602.3 The city building-permit page directs questions about parcel zoning to the city office at 601-833-7766.4 Use that city contact to establish the parcel district before preparing a site plan.4
Brookhaven publishes a permit-fee schedule and directs questions about the fee formula to its office; the available information does not establish a flat building-permit price.12 Building and zoning questions go to the city, while on-site wastewater applications go to MSDH rather than the city Building Inspector.345
Does Brookhaven have zoning, lot-size rules and setbacks?
Brookhaven has an adopted city zoning ordinance, so the parcel district matters when choosing a home site.2 In Brookhaven’s R-1 district, buildings need a front setback of at least 35 feet, side setback of 10 feet and rear setback of 25 feet.9 Main and accessory structures together may cover no more than 35% of an R-1 lot, and buildings may not exceed 35 feet in height.1314
Brookhaven’s R-2 district sets a minimum lot area of 8,000 square feet, with 4,000 square feet per family and a 5,000-square-foot provision for single-family dwelling units.15 In A-1, a single-family dwelling generally needs at least 1 acre and access to a dedicated public street or highway; qualifying previously recorded smaller lots have an exception.16 Confirm the actual parcel district with the city zoning office rather than applying another district’s dimensions to your land.4
How do septic permits and water connections work in Brookhaven?
A septic system inside Brookhaven requires an MSDH permit, and permanent water-meter connection requires an available permanent sewage-disposal solution, which may be sewer or septic.67 MSDH automatically refers applications within 1 mile of a sewer line to the sewer provider and requires a Letter of Rejection before proceeding with a septic application.7 Establish sewer availability before treating septic as the default for a city parcel.7
For a new onsite system, submit a complete application to MSDH; the department emails a payment link after receiving the completed application, and online payment carries an additional fee.17 The published Notice of Intent plus Final Approval fee is $197.50, subject to change and processing charges.18 MSDH’s Wastewater Call Center is 1-855-220-0192.19 Off-grid sanitation still requires wastewater to go to sewer or septic; discharge onto the ground, into ditches or into bodies of water is prohibited.20
Can you live in an RV, tiny home or mobile home in Brookhaven?
We could not confirm whether Brookhaven allows private-lot RV living, tiny-home occupancy or a separate accessory dwelling; ask the city zoning office about the proposed use and parcel district before buying a unit.4 Brookhaven’s mobile-home rules do establish a moving-permit requirement before a mobile home is moved.8
A single-wide may move into a mobile-home park or replace a mobile home of the same size or smaller; the replaced home must have been occupied within the prior 90 days, verified by a water or electrical bill.8 A double-wide may move into R-2 or R-3 areas if setbacks are met, or into a mobile-home park.8 Mississippi also requires applicable factory-built homes to undergo state installation inspection before occupation.21
Building a home in Brookhaven: what steps should come first?
- Ask Brookhaven’s zoning office to identify the parcel district and discuss the proposed residential use before drawing the site layout.4
- Establish the sewage-disposal route: permanent water service depends on sewer or septic availability, and nearby sewer can trigger referral before MSDH processes septic.7
- Ask the city about floodplain standards before fixing the floor elevation: applicable new residential construction and substantial improvements in special flood hazard areas must place the lowest floor, including basement, at least 2 feet above base flood elevation.22
- Submit the city building application with 2 sets of plans and a deed copy, allowing for a possible 2-week review.1
- Confirm required inspections and occupancy paperwork with the city Building Inspector; we could not confirm when a residential certificate of occupancy is required.3
For land outside Brookhaven city limits, use the Lincoln County guide for the county answer; Brookhaven’s zoning rules concern land inside city limits.2
Watch-outs
- A Mississippi owner-builder licensing exemption does not itself waive Brookhaven building permits or inspections.10
- We could not confirm a Brookhaven minimum dwelling size or an agricultural building-permit exemption; ask the city zoning and building office before designing a small home or barn.4
- A permanent water connection cannot substitute for resolving sewage disposal, and proximity to sewer may prevent proceeding directly to a septic application.7
Sources
- Building Permits - Brookhaven Mississippi (Brookhaven), quoted and re-checked
- Appendix B - Zoning Ordinance, Sec. 501 R-1 Residential district (Brookhaven), quoted and re-checked
- City of Brookhaven Public Works Department / Building Inspector (brookhaven-ms.gov)
- City of Brookhaven Building Permit and Zoning Office (brookhaven-ms.gov)
- WasteWater (Brookhaven), quoted and re-checked
- WasteWater (Brookhaven), quoted and re-checked
- WasteWater (Brookhaven), quoted and re-checked
- Building Permits - Brookhaven Mississippi (Brookhaven), quoted and re-checked
- Appendix B - Zoning Ordinance, Sec. 501 R-1 Residential district (Brookhaven), quoted and re-checked
- Mississippi Senate Journal, March 9, 2022 (Mississippi statewide rule), quoted and re-checked
- Building Permits - Brookhaven Mississippi (Brookhaven), quoted and re-checked
- Building Permits - Brookhaven Mississippi (Brookhaven), quoted and re-checked
- Appendix B - Zoning Ordinance, Sec. 501 R-1 Residential district (Brookhaven), quoted and re-checked
- Appendix B - Zoning Ordinance, Sec. 501 R-1 Residential district (Brookhaven), quoted and re-checked
- Appendix B - Zoning Ordinance, Sec. 502 R-2 Residential district (Brookhaven), quoted and re-checked
- Appendix B - Zoning Ordinance, Sec. 500 A-1 General agricultural district (Brookhaven), quoted and re-checked
- On-Site Wastewater — Mississippi State Department of Health, quoted and re-checked
- WasteWater FAQ — Mississippi State Department of Health, quoted and re-checked
- Mississippi State Department of Health, Division of On-Site Wastewater (msdh.ms.gov)
- WasteWater (Brookhaven), quoted and re-checked
- MH-5 Uniform Standards Code for Factory-Built Homes Law (Mississippi statewide rule), quoted and re-checked
- Chapter 24 Flood Damage Prevention Ordinance, Sec. 24-70 (Brookhaven), quoted and re-checked
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.