Lee County, Mississippi
Town of Guntown is a town in Lee County, Mississippi. Town of Guntown adopts its own zoning, so inside its limits Town of Guntown’s rules apply, not the county’s. Septic permits inside Town of Guntown come from the state health agency. 9 rules below are quoted from official sources and independently re-checked, most recently on November 5, 2026. Rules for unincorporated land are on the Lee County page.
Land inside Guntown town limits.
“Zoning Ordinance Guntown Zoning Ordinance (PDF) Zoning Map Guntown Zoning Map (PDF) Appendix I - Site Standards by Zoning District Guntown Site Standards (PDF)”
Zoning districts inside Guntown town limits.
“Zoning Map Guntown Zoning Map (PDF) Appendix I - Site Standards by Zoning District Guntown Site Standards (PDF) Appendix II - Uses by Zoning District Guntown Uses by District (PDF)”
Lots inside Guntown town limits; applicable dimensions depend on the zoning district shown on the official zoning map.
“Based on your zone, the Official Zoning Ordinance describes what is allowable, from how you may use your property to lot size, placement, and density.”
Structures inside Guntown town limits; applicable setback depends on zoning district.
“Setbacks are the minimum distance a building must be set back from the property lines of a lot. This and other site standards can be found in Appendix I of the Official Zoning Ordinance (Site Standards by Zoning District).”
Guntown planning applications requiring public notice.
application lead time: >= 16 days (to allow for proper public notice)
“The Board of Alderman meets on the first Tuesday of each month at 5:30 p.m. All applications must be submitted no less than 16 days prior to allow for proper public notice, according to MS Code § 21-41-5.”
Town of Guntown does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
On-site wastewater systems inside Guntown town limits when a central sewer line is not available.
“If public sewer is not available in your area, you will have to apply to us for the proper paperwork.”
On-site septic systems inside Guntown town limits when central sewer is unavailable.
“No. By law, you must apply to us and install a septic system from the Permit we issue.”
Off-grid wastewater disposal inside Guntown town limits.
“All wastewater is required to pipe into a central sewer system or a septic system for proper disposal. No “gray water” can be discharged on the ground, ditches, or bodies of water.”
Permanent water-meter connection for property inside Guntown town limits.
“State law requires you have permanent sewage disposal solution available to receive a permanent water meter. Permanent sewage disposal solutions can be a sewer line or septic system.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Guntown or Lee County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Guntown publishes no rule on the point, not that none exists. Lee County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Guntown means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.