Kemper County, Mississippi
Town of Scooba is a town in Kemper County, Mississippi. Septic permits inside Town of Scooba come from the state health agency. 7 rules below are quoted from official sources and independently re-checked, most recently on November 7, 2026. Rules for unincorporated land are on the Kemper County page.
Town of Scooba does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
On-site wastewater service inside Scooba town limits when public sewer is unavailable.
“If public sewer is not available in your area, you will have to apply to us for the proper paperwork.”
Installation of an on-site wastewater disposal system inside Scooba town limits.
“The Permit is required for a water meter and the installation of an on-site wastewater disposal system.”
New single-family on-site wastewater systems inside Scooba town limits.
“The exemption application is exclusively for new, single-family residences installing a septic system for the first time. Any property that is commercial or replacing an existing system are not eligible. It may be applied for the first residence on a parcel of land of two (2) or more acres or second residence on a parcel of land of five (5) or more acres. There are two differences between the exemption and the regular application.”
Off-grid wastewater disposal inside Scooba town limits.
“Mississippi does not recognize gray water. Anything that could be considered gray water in other states is classified as wastewater in Mississippi. All wastewater is required to pipe into a central sewer system or a septic system for proper disposal. No “gray water” can be discharged on the ground, ditches, or bodies of water.”
A permanent water-meter connection for property inside Scooba town limits; Scooba Water Department is the town's water source.
sewer-line referral distance: 1 mile (MSDH automatically refers applications within this distance to connect)
“State law requires you have permanent sewage disposal solution available to receive a permanent water meter. Permanent sewage disposal solutions can be a sewer line or septic system. You must have a sewer option before a water utility can make a connection to your property.”
MSDH on-site wastewater applications, including qualifying property inside Scooba town limits.
Notice of Intent plus Final Approval: 197.5 USD · Notice of Intent plus Exemption: 100 USD · Subdivision application: 325 USD (plus $6.50 per lot)
“Notice of Intent + Final Approval is currently $197.50 Notice of Intent + Exemption is currently $100”
MSDH on-site wastewater applications, including qualifying property inside Scooba town limits.
average property-visit turnaround: 5-10 business days (after MSDH has the application, payment, and necessary documents)
“We must have the application, payment, and necessary documents before we schedule a visit. Once we have everything, we average 5-10 business days to visit the property based on weather and the volume of applications in your area.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Scooba or Kemper County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Scooba publishes no rule on the point, not that none exists. Kemper County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Scooba means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.