Jones County, Mississippi
Laurel is a city in Jones County, Mississippi. Laurel adopts its own zoning, so inside its limits Laurel’s rules apply, not the county’s. 13 rules below are quoted from official sources and independently re-checked, most recently on November 5, 2026. Rules for unincorporated land are on the Jones County page.
Construction, alteration, repair, moving, demolition, occupancy changes, and regulated building-system work inside Laurel city limits.
“shall first make application to the Inspection Department and obtain the required permit.”
Buildings inside Laurel city limits.
adopted code edition: International Building Code, 2018 edition
“The International Building Code, 2018 edition, with Appendices is hereby adopted by reference.”
Projects issued City building permits inside Laurel city limits.
additional inspection fee: 25 USD (Including reinspections based on inspections which failed to meet code.)
“As you perform construction, you will need to schedule inspections.”
Permitted work inside Laurel city limits that requires final inspection.
“After a final inspection has passed, a Certificate of Occupancy (C.O.) will be issued.”
Land inside Laurel city limits.
“the City of Laurel is hereby divided into districts”
Mobile or manufactured homes inside Laurel city limits.
minimum mobile/manufactured-home lot area: >= 5000 square feet
“Mobile home lots shall be a minimum of five thousand (5,000) square feet in area.”
Development activities in identified special-flood-hazard and community-flood areas inside Laurel city limits.
“A development permit shall be required in conformance with the provision of this ordinance prior to the commencement of any development activities”
Short-term rentals inside Laurel city limits.
maximum rental duration: <= 30 consecutive nights
“A short-term rental is only permitted by obtaining a special use permit.”
Building permits inside Laurel city limits.
base permit fee: 25 USD (Plus project-valuation charges.)
“Base permit fee will be Twenty-five Dollars ($25.00) plus a percentage of the project valuation charges as follows:”
Building-permit applications inside Laurel city limits.
stated review period: 24 hours (May be extended for City-required corrections or revisions.)
“There is a 24-hour review process for the City of Laurel.”
Laurel does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
R-1 Low Density Residential District inside Laurel city limits.
minimum lot area per family: >= 7500 square feet (A qualifying smaller lot of record in separate ownership on the ordinance effective date may be occupied by not more than one family.)
“a lot area of not less than seven thousand five hundred (7,500) square feet per family”
R-1 Low Density Residential District inside Laurel city limits.
front yard: >= 25 feet · rear yard: >= 25 feet (Existing structures may be added onto at the existing setback if not closer than five feet to the property line.)
“There shall be a front yard of not less than twenty-five (25) feet.”
R-1 Low Density Residential District inside Laurel city limits.
maximum building height: <= 45 feet
“No building hereafter erected reconstructed, altered or enlarged, shall exceed forty-five (45) feet.”
We looked and could not find an official answer yet. Silence is not permission; ask Laurel or Jones County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Laurel publishes no rule on the point, not that none exists. Jones County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Laurel means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.