Bolthole Index

Jefferson Davis County, Mississippi

Zoning, building permits and septic rules in Town of Bassfield, Mississippi

Town of Bassfield is a town in Jefferson Davis County, Mississippi. Septic permits inside Town of Bassfield come from the state health agency. 6 rules below are quoted from official sources and independently re-checked, most recently on November 5, 2026. Rules for unincorporated land are on the Jefferson Davis County page.

Answers from the rulebook for Town of Bassfield

Rules another office applies inside Town of Bassfield

Town of Bassfield does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Who permits septicState (with conditions)

    Individual on-site wastewater systems inside Bassfield town limits; Jefferson Davis County is listed in MSDH's South Region.

    • This claim concerns individual on-site wastewater systems, not the town's public sewer system.
    “The On-site Wastewater program develops policy and regulations”
  • Septic permitRequired

    Installation of an individual on-site wastewater disposal system inside Bassfield town limits.

    • The cited MSDH FAQ also states that the permit is required for a water meter.
    “The Permit is required for [...] the installation of an on-site wastewater disposal system.”
  • Septic inspectionRequired

    New individual on-site wastewater disposal systems inside Bassfield town limits using MSDH's Notice of Intent process.

    • A Certified Installer must contact MSDH 24 hours before construction to schedule the inspection.
    • The form provides a two-acre exemption option under which final approval is not required or desired; MSDH reserves the right to inspect systems after more than 30 days of use on properties that filed that exemption.
    “24 hours BEFORE beginning construction to schedule an inspection.”
  • Off-grid sanitationLimited

    Wastewater disposal associated with occupancy inside Bassfield town limits.

    • Mississippi does not recognize gray water.
    • Wastewater must pipe to a central sewer system or septic system; it may not be discharged on the ground, in ditches, or in bodies of water.
    “Mississippi does not recognize gray water.”
  • Mandatory utility hookupConditional

    A permanent water-meter connection for property inside Bassfield town limits.

    • State law requires a permanent sewage-disposal solution before a permanent water meter.
    • MSDH automatically refers applications within one mile of a sewer line to connect and requires a sewer-provider letter of rejection before proceeding with an on-site application.

    sewer-line referral distance: <= 1 mile (MSDH automatically refers applications within this distance to connect)

    “State law requires you have permanent sewage disposal solution available to receive a permanent water meter. Permanent sewage disposal solutions can be a sewer line or septic system. You must have a sewer option before a water utility can make a connection to your property.”
  • Permit processPublished (with conditions)

    MSDH individual on-site wastewater-system approval process for property inside Bassfield town limits.

    • The process requires application, required documentation, payment of the selected-option fee and a processing fee.
    • The applicant must select one stated process option.
    “STEP 1 – Fill out application, submit required documentation and pay fee of selected option (a processing fee will be included) STEP 2 - Soil and Site Evaluation Often referred as a “Perk Test”, this Evaluation will be performed by the local Environmentalist. STEP 3 - Permit/Recommendation This document is issued to you after the Soil and Site Evaluation.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Town of Bassfield or Jefferson Davis County directly.

  • Building permit — Residential construction inside Bassfield town limits.
  • Owner-builder exemption — Owner-built residences inside Bassfield town limits.
  • Building code adopted — Construction inside Bassfield town limits.
  • Inspections — Residential building work inside Bassfield town limits.
  • Certificate of occupancy — Residential occupancy inside Bassfield town limits.
18 more unanswered
  • Local zoning
  • Zoning districts
  • Minimum dwelling size
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Well permit
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Town of Bassfield publishes no rule on the point, not that none exists. Jefferson Davis County’s page lists the county offices to call.

← All of Jefferson Davis County: county rules, score and offices