Bay Springs is a city in Jasper County, Mississippi. Septic permits inside Bay Springs come from the state health agency. 8 rules below are quoted from official sources and independently re-checked, most recently on November 5, 2026. Rules for unincorporated land are on the Jasper County page.

Answers from the rulebook for Bay Springs

Bay Springs’s own rules

  • Building code adoptedAdopted (with conditions)

    Building construction inside Bay Springs city limits.

    • The February 15, 2022 Attorney General opinion reports that Bay Springs wished to return to the Southern Building Code; the current adopted edition and any subsequent amendment ordinance were not located.
    “Sometime in the past, the Town of Bay Springs (the “Town”) adopted the International Building Code to replace the Southern Building Code.”

Rules another office applies inside Bay Springs

Bay Springs does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Who permits septicState (with conditions)

    On-site wastewater systems for land inside Bay Springs city limits where public sewer is not available.

    • MSDH directs persons without an available public sewer line to apply to its Division of On-Site Wastewater.
    “You will not have a sewer line available. If you have a sewer bill, you do not come to us.”
  • Septic permitRequired

    Installation of an on-site wastewater disposal system inside Bay Springs city limits when public sewer is unavailable.

    • The permit is also required for a water meter.
    • The source applies to an on-site wastewater disposal system rather than a property served by sewer.
    “The Permit is required for a water meter and the installation of an on-site wastewater disposal system.”
  • Septic inspectionLimited

    A Bay Springs resident seeking the MSDH medical exemption to connect a parent’s trailer to an existing home septic system.

    • A doctor must provide a signed note that the parent can no longer live alone and that the resident will be responsible for care.
    • MSDH may deny the exemption if the septic system cannot handle the additional water usage.
    “This situation would be classified as a medical exemption. A doctor will need to provide a signed note stating your parent can no longer live alone and that you will be responsible for taking care of him/her. An Existing Residential Inspection will be required by us. MSDH may not allow this exemption if your septic system cannot handle the additional water usage.”
  • Off-grid sanitationLimited

    Disposal of household wastewater on land inside Bay Springs city limits.

    • Wastewater must be routed to central sewer or a septic system.
    • Gray water may not be discharged on ground, in ditches, or into bodies of water.
    “Mississippi does not recognize gray water. Anything that could be considered gray water in other states is classified as wastewater in Mississippi. All wastewater is required to pipe into a central sewer system or a septic system for proper disposal. No “gray water” can be discharged on the ground, ditches, or bodies of water.”
  • Mandatory utility hookupConditional

    A property inside Bay Springs city limits seeking a permanent water-meter connection.

    • A permanent sewage-disposal solution must be available.
    • If public sewer is unavailable, MSDH directs the applicant to apply for on-site-wastewater paperwork.
    • MSDH automatically refers applications within one mile of a sewer line to connect and requires a letter of rejection from the sewer provider before proceeding with the on-site application.

    sewer-line referral distance: <= 1 mile (MSDH automatically refers on-site wastewater applications within this distance to connect)

    “State law requires you have permanent sewage disposal solution available to receive a permanent water meter. Permanent sewage disposal solutions can be a sewer line or septic system. You must have a sewer option before a water utility can make a connection to your property. If public sewer is not available in your area, you will have to apply to us for the proper paperwork.”
  • Permit feesPublished (with conditions)

    MSDH on-site wastewater applications for Bay Springs properties not served by sewer.

    • Online payment is subject to a processing fee.
    • All fees are subject to change.
    • Additional costs may be included if the online application is not used.

    Notice of Intent plus Final Approval: 197.5 USD · Notice of Intent plus Exemption: 100 USD · Existing Residential Inspection: 100 USD

    “Notice of Intent + Final Approval is currently $197.50 Notice of Intent + Exemption is currently $100 Existing Residential Inspection is currently $100”
  • Permit processPublished (with conditions)

    MSDH on-site wastewater applications for Bay Springs properties not served by sewer.

    • MSDH reviews applications before invoicing.
    • The invoice is emailed within one business day of receipt.
    • Payment is required before MSDH visits the property.
    “We personally review all applications before invoicing. This prevents many mistakes, such as duplicate applications or applying for the wrong service to occur. The invoice is emailed to you from support@msegov.com within one (1) business day of receiving the application. Check your Spam folder if you do not see anything in your Inbox. We must receive your payment prior to visiting the property.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Bay Springs or Jasper County directly.

  • Building permit — Residential construction inside Bay Springs city limits.
  • Owner-builder exemption — Owner-built residences inside Bay Springs city limits.
  • Inspections — Residential building inspections inside Bay Springs city limits.
  • Certificate of occupancy — New residential occupancy inside Bay Springs city limits.
  • Local zoning — Land inside Bay Springs city limits in Jasper County, Mississippi.
17 more unanswered
  • Zoning districts
  • Minimum dwelling size
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Well permit
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Bay Springs publishes no rule on the point, not that none exists. Jasper County’s page lists the county offices to call.

← All of Jasper County: county rules, score and offices