Bolthole Index

Holmes County, Mississippi

Zoning, building permits and septic rules in Durant, Mississippi

Durant is a city in Holmes County, Mississippi. Septic permits inside Durant come from the state health agency. 8 rules below are quoted from official sources and independently re-checked, most recently on November 5, 2026. Rules for unincorporated land are on the Holmes County page.

Answers from the rulebook for Durant

Rules another office applies inside Durant

Durant does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Who permits septicState (with conditions)

    Individual on-site wastewater systems statewide, including property inside Durant city limits when an on-site system is used.

    • The state program concerns individual on-site wastewater systems and related individual water supplies.
    “The On-site Wastewater program develops policy and regulations and provides technical assistance to regional environmentalists in designing and inspecting Individual On-site Wastewater Disposal Systems (IOWDS), recreational vehicle campgrounds/lodging parks, septage pumpers/haulers and individual water supplies.”
  • Septic permitRequired

    Installation of an on-site wastewater disposal system inside Durant city limits where the statewide on-site wastewater program applies.

    • The permit is required for a water meter and installation of an on-site wastewater disposal system.
    “The Permit is required for a water meter and the installation of an on-site wastewater disposal system.”
  • Septic inspectionLimited

    New individual on-site wastewater systems inside Durant city limits under the Mississippi final-approval process.

    • For the final-approval process, the certified installer must contact the Department 24 hours before construction to schedule an inspection.
    • For the two-acre exemption process, MSDH states that it will not inspect installation.
    • The exemption page requires acreage greater than two acres.

    advance notice before construction: 24 hours (Certified Installer contacts the Department to schedule an inspection under the final-approval process.)

    “The Certified Installer is responsible for contacting the Department 24 hours BEFORE beginning construction to schedule an inspection.”
  • Off-grid sanitationProhibited

    Discharge of household gray water or other wastewater on land inside Durant city limits.

    • Wastewater must be directed to a central sewer system or septic system for proper disposal.
    “All wastewater is required to pipe into a central sewer system or a septic system for proper disposal. No “gray water” can be discharged on the ground, ditches, or bodies of water.”
  • Mandatory utility hookupConditional

    Permanent water-meter connection for property inside Durant city limits.

    • A permanent sewage-disposal solution must be available before a water utility can make a connection.
    • Permanent sewage disposal may be a sewer line or septic system.
    • If public sewer is unavailable, applicants must apply to the Division of On-site Wastewater for the proper paperwork.
    • MSDH automatically refers applications within one mile of a sewer line to connect and requires a Letter of Rejection from the sewer provider before proceeding with the on-site wastewater application.

    sewer-line referral distance: <= 1 mile (MSDH automatically refers applications within this distance to connect; a Letter of Rejection from the sewer provider is required before MSDH proceeds.)

    “State law requires you have permanent sewage disposal solution available to receive a permanent water meter. Permanent sewage disposal solutions can be a sewer line or septic system.”
  • Subdividing landRegulated (with conditions)

    On-site wastewater components of subdivisions inside Durant city limits.

    • This claim concerns MSDH review and authorization of on-site wastewater commercial developments, not a comprehensive municipal subdivision ordinance.
    “Staff engineers review and authorize Certified Professional Evaluator's designed On-site Wastewater Disposal Systems, Commercial Developments (Subdivisions, Manufactured, Multi-family, RV Campgrounds/Lodging Parks), Commercial Establishments (Restaurant, Child Care Facility/School. Church, Shopping Center, Office, etc.), review and approve manufactured designs of wastewater components, etc.”
  • Permit feesPublished (with conditions)

    MSDH on-site wastewater applications for property inside Durant city limits.

    • Fees are subject to change.
    • Online payment is subject to a processing fee.
    • Additional costs may be included if the online application is not used.

    Notice of Intent + Final Approval: 197.5 USD (Current fee stated by MSDH; online processing fee and other conditions may apply.) · Notice of Intent + Exemption: 100 USD (Current fee stated by MSDH; online processing fee and other conditions may apply.) · Subdivision application: 325 USD (Plus USD 6.50 per lot.) · Subdivision lot fee: per 6.5 USD (In addition to the stated subdivision application fee.)

    “Notice of Intent + Final Approval is currently $197.50 Notice of Intent + Exemption is currently $100 [...] Subdivision is currently $325 + $6.50/lot Online payment will be subject to a processing fee. All fees are subject to change.”
  • Permit processPublished (with conditions)

    MSDH new individual on-site wastewater-system process for property inside Durant city limits.

    • The process is for a new individual on-site wastewater disposal system.
    • The applicant must use the selected option and comply with its final-approval or exemption terms.
    “STEP 1 – Fill out application, submit required documentation and pay fee of selected option (a processing fee will be included) STEP 2 - Soil and Site Evaluation Often referred as a “Perk Test”, this Evaluation will be performed by the local Environmentalist. STEP 3 - Permit/Recommendation This document is issued to you after the Soil and Site Evaluation.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Durant or Holmes County directly.

  • Building permit — Residential construction inside Durant city limits.
  • Owner-builder exemption — Owner-built residential construction inside Durant city limits.
  • Building code adopted — Building construction inside Durant city limits.
  • Inspections — Building inspections for construction inside Durant city limits.
  • Certificate of occupancy — Occupancy of structures inside Durant city limits.
17 more unanswered
  • Local zoning
  • Zoning districts
  • Minimum dwelling size
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Well permit
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Durant publishes no rule on the point, not that none exists. Holmes County’s page lists the county offices to call.

← All of Holmes County: county rules, score and offices