Hinds County, Mississippi
Town of Edwards is a town in Hinds County, Mississippi. Septic permits inside Town of Edwards come from the state health agency. 7 rules below are quoted from official sources and independently re-checked, most recently on November 5, 2026. Rules for unincorporated land are on the Hinds County page.
Town of Edwards does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Individual on-site wastewater systems inside Edwards town limits when a central sewer connection is not used.
“All regulations shall be applied uniformly in all areas of the state”
Installation of an individual on-site wastewater disposal system inside Edwards town limits.
“required for [...] the installation of an on-site wastewater disposal system.”
New individual on-site wastewater disposal systems inside Edwards town limits using the MSDH Notice-of-Intent process.
preconstruction notification: >= 24 hours (Certified installer must contact the Department before beginning construction.)
“The Certified Installer is responsible for contacting the Department 24 hours BEFORE beginning construction to schedule an inspection.”
Wastewater disposal for residences inside Edwards town limits.
“Mississippi does not recognize gray water.”
A permanent water-meter connection for property inside Edwards town limits.
sewer-line referral distance: <= 1 mile (MSDH automatically refers applications within this distance to connect.)
“within one (1) mile of a sewer line to connect.”
MSDH on-site wastewater applications that may be needed for property inside Edwards town limits.
Notice of Intent plus Final Approval: 197.5 USD (Online payment processing fee may apply.) · Notice of Intent plus Exemption: 100 USD (Online payment processing fee may apply.) · Existing Residential Inspection: 100 USD (Online payment processing fee may apply.)
“An Invoice of $197.50 + a processing fee will be emailed within one(1) business day.”
MSDH process for a new individual on-site wastewater system serving property inside Edwards town limits.
“STEP 1 – Fill out application, submit required documentation and pay fee of selected option [...] STEP 4 - Inspection [...] STEP 5 - Final Approval”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Edwards or Hinds County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Edwards publishes no rule on the point, not that none exists. Hinds County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Edwards means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.