Franklin County, Mississippi
Town of Roxie is a town in Franklin County, Mississippi. Septic permits inside Town of Roxie come from the state health agency. 7 rules below are quoted from official sources and independently re-checked, most recently on November 6, 2026. Rules for unincorporated land are on the Franklin County page.
Town of Roxie does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
On-site wastewater systems inside Roxie town limits, where central sewer service is not used.
“You will not have a sewer line available. If you have a sewer bill, you do not come to us. [...] The Permit is required for a water meter and the installation of an on-site wastewater disposal system.”
Installation of an on-site wastewater disposal system inside Roxie town limits.
“The Permit is required for a water meter and the installation of an on-site wastewater disposal system.”
A medical exemption for an additional trailer connected to a home's septic system inside Roxie town limits.
“This situation would be classified as a medical exemption. A doctor will need to provide a signed note stating your parent can no longer live alone and that you will be responsible for taking care of him/her. An Existing Residential Inspection will be required by us. MSDH may not allow this exemption if your septic system cannot handle the additional water usage.”
A permanent water-meter connection inside Roxie town limits.
“State law requires you have permanent sewage disposal solution available to receive a permanent water meter. Permanent sewage disposal solutions can be a sewer line or septic system. You must have a sewer option before a water utility can make a connection to your property. If public sewer is not available in your area, you will have to apply to us for the proper paperwork.”
A subdivision inside Roxie town limits that requires Mississippi Department of Health on-site wastewater review.
minimum lots defining subdivision: >= 10 lots (County ordinances may lower the minimum number of lots.)
“A subdivision is any development of land into ten (10) or more lots. County ordinances may lower the minimum number of lots. If the development will utilize public water, the Bureau of Public Water Supply may require a subdivision review, regardless of lot count.”
MSDH on-site wastewater applications affecting property inside Roxie town limits.
Notice of Intent plus Final Approval: 197.5 USD · Notice of Intent plus Exemption: 100 USD · Existing Residential Inspection: 100 USD
“Notice of Intent + Final Approval is currently $197.50 Notice of Intent + Exemption is currently $100 Existing Residential Inspection is currently $100 [...] Online payment will be subject to a processing fee. All fees are subject to change. Additional costs may be included if online application is not used.”
MSDH on-site wastewater permit applications affecting property inside Roxie town limits.
“MSDH requires – at minimum – a description of the property in the form of your deed or survey and a plot plan that is drawn to show all current and future plans for the property. [...] We must have the application, payment, and necessary documents before we schedule a visit.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Roxie or Franklin County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Roxie publishes no rule on the point, not that none exists. Franklin County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Roxie means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.