Hattiesburg, Mississippi generally requires a building permit for a new home or residential repairs and alterations, with exceptions for certain routine repairs.1 Hattiesburg administers city zoning; Forrest County’s lack of county building-code administration applies outside city limits.23 Private sewage disposal inside Hattiesburg requires city approval as well as the Mississippi State Department of Health wastewater process.45
At a glance
- Building permits
- Generally required for new homes, repairs and alterations; some routine repairs excepted1
- Zoning
- City Land Development Code and district rules apply2
- New-home fees
- $50 plan review; $500 building permit and inspections6
- Septic
- City written private-sewage permit plus MSDH wastewater process45
- Owner-builder
- Allowed for most single-family owner-occupied homes, except electrical and gas piping work7
- Floodplain
- AE-zone residential lowest floor must be elevated 1 foot above base flood elevation8
Who to call
Building permits
Residential building permit applications and construction inspections inside Hattiesburg
200 Forrest Street
Planning & zoning
City zoning, site plan review, subdivision review and development questions
200 Forrest Street
Septic permits
Mississippi State Department of Health Division of On-Site Wastewater
State on-site wastewater applications, soil and site evaluations, and private well sampling
570 East Woodrow Wilson Drive
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Hattiesburg means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Hattiesburg, MS?
Hattiesburg generally requires a residential building permit to construct a new home or repair or alter an existing home; certain routine repairs may be exempt.1 The Hattiesburg Building Division is the office to ask whether your proposed repair needs a building permit.9 Hattiesburg has adopted the International Residential Code with local amendments, and the amendments control when requirements conflict.10
For a new single-family residence, Hattiesburg lists a $50 plan-review fee and $500 for the building permit and inspections; other projects have a separate fee schedule available from the Building Division.6
Who issues building permits in Hattiesburg?
Contact the Hattiesburg Building Division at 601-554-1003 for residential building permits and to schedule construction inspections.9 Most Hattiesburg building-permit applications require plans and construction documents prepared by a registered architect or design professional and drawn to scale.11 Required documents may include site, floor, elevation, foundation, wall-section, electrical, HVAC and plumbing plans.11
Hattiesburg allows online applications for minor routine repairs, while other building-permit applications should be made in person.11 Permitted residential work must be inspected at all stages before cover-up, so schedule inspections before concealing work.12
Does Hattiesburg have zoning, lot-size and setback rules?
Hattiesburg administers its Land Development Code and official zoning map, with development governed by district-specific provisions.2 Ask the Hattiesburg Planning Division which district covers the parcel and which lot dimensions, setbacks and uses apply to your proposal.213 We could not confirm a complete district-by-district lot-size or setback answer here; request the applicable standards from the Planning Division before committing to a house layout.13
Hattiesburg reviews subdivision of land through the city Planning Division and its site and design review process.14 Commercial or multi-family residential zoned properties require a pre-application meeting for new development, redevelopment or expansion; after site-plan approval, applicants may submit building-permit applications and construction plans to the Building Division.13
How do septic permits work inside Hattiesburg?
Hattiesburg requires a written private-sewage permit before constructing a private disposal system where public sewer is unavailable, using a city application form and any required plans or specifications.4 The Mississippi State Department of Health also administers the state on-site wastewater application and approval process.5 Contact MSDH for soil and site evaluation, and ask Hattiesburg which city approving authority must sign the private-sewage permit.154
Hattiesburg’s ordinance requires connection after official notice when an occupied property abuts a street, alley or right-of-way containing city public sewer within 100 feet of the property line; the connection deadline is 90 days after notice.16 For a private system, notify the city approving authority for final inspection before covering underground portions.17
Can you live in an RV or tiny home in Hattiesburg?
We could not confirm a complete Hattiesburg rule for living in an RV on private land or for temporary camping; ask the Hattiesburg Planning Division about the proposed use in the parcel’s zoning district.213 We also could not confirm a tiny-home-specific occupancy rule, an accessory-dwelling permission or a minimum dwelling floor area; ask Planning and the Building Division before buying a small dwelling or planning an additional residence.139
A proposed tiny home still needs its building-permit and zoning treatment resolved because Hattiesburg generally requires permits for new residences and applies district-specific development rules.12 For a manufactured home, Mississippi requires installation inspection before occupation, along with necessary local approvals before installation.18
Building a home in Hattiesburg: what are the steps?
- Confirm the Hattiesburg zoning district with Planning and ask how the proposed home fits the district’s development standards.213
- Resolve public sewer availability or the city private-sewage permit and MSDH wastewater process before designing an on-site system.1645
- Prepare the required scaled construction documents and submit the residential building-permit application to the Building Division.11
- Arrange construction inspections before work is covered.12
Hattiesburg permits owners to act as contractors for most single-family owner-occupied homes, except electrical and gas piping work; owners assume liability for their projects.7 We could not confirm the residential certificate-of-occupancy requirement inside Hattiesburg; ask the Building Division what final approvals are needed before moving in.9
What should you check before buying land in Hattiesburg?
For Hattiesburg residential construction and substantial improvements in AE flood zones, the lowest floor, including basement, must be elevated 1 foot above base flood elevation.8 Ask city Planning how the parcel’s flood-zone and zoning requirements affect the proposed building site.813 We could not confirm a complete city driveway-access approval rule; ask Planning which review applies to your proposed entrance.13
For land outside Hattiesburg city limits, use the Forrest County guide: the county does not administer building codes or issue certificates of occupancy, but county stormwater, floodplain-development and subdivision ordinances apply.3 Inside Hattiesburg, use the city’s building and zoning answers and the combined city/state private-sewage process.125
Watch-outs
- Hattiesburg’s private-sewage ordinance lists a $6 permit and inspection fee, but state fees may also apply; ask the city approving authority and MSDH for current charges.4
- Do not cover underground private-sewage work before notifying Hattiesburg’s approving authority for final inspection.17
- Hattiesburg owner-builder permission excludes electrical and gas piping work.7
Sources
- Residential - City of Hattiesburg (Hattiesburg), quoted and re-checked
- Land Development Code (Hattiesburg), quoted and re-checked
- Forrest County Planning Department, quoted and re-checked
- Chapter 21 - Sewer ordinance (Hattiesburg), quoted and re-checked
- Chapter 21 - Sewer ordinance (Hattiesburg), quoted and re-checked
- Residential - City of Hattiesburg (Hattiesburg), quoted and re-checked
- Residential - City of Hattiesburg (Hattiesburg), quoted and re-checked
- Code of Ordinances, Sec. 22-79 - Specific standards for riverine zones (AE zones) (Hattiesburg), quoted and re-checked
- Hattiesburg Building Division (hattiesburgms.com)
- Code of Ordinances, Sec. 10-44 - Adopted (Hattiesburg), quoted and re-checked
- Residential - City of Hattiesburg (Hattiesburg), quoted and re-checked
- Residential - City of Hattiesburg (Hattiesburg), quoted and re-checked
- Hattiesburg Planning Division (hattiesburgms.com)
- Planning Division - Development Information - City of Hattiesburg (Hattiesburg), quoted and re-checked
- Mississippi State Department of Health Division of On-Site Wastewater (msdh.ms.gov)
- Chapter 21 - Sewer ordinance (Hattiesburg), quoted and re-checked
- Chapter 21 - Sewer ordinance (Hattiesburg), quoted and re-checked
- MH-5 Uniform Standards Code for Factory-Built Homes Law (Mississippi statewide rule), quoted and re-checked
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.