Southaven, Mississippi requires building permits before renovations, alterations, additions and accessory-structure work.1 Inside Southaven city limits in DeSoto County, the city administers zoning and building permit applications; septic approval comes from the Mississippi State Department of Health (MSDH).234 A permanent water connection requires a permanent sewage-disposal solution, so settle sewer availability or septic approval early.5
At a glance
- Building permits
- Required before covered renovations, additions and accessory structures; apply online13
- Zoning
- City zoning applies; lot size and setbacks depend on the district267
- Septic permits
- MSDH approval required to install an onsite wastewater system48
- Owner-builder
- Homeowner may submit the building permit; Mississippi-licensed contractors must perform trade work9
- Estate residential lots
- ER district: minimum 1 acre, with 150-foot minimum width6
- Water connection
- Permanent sewage disposal must be available before a permanent water meter5
Who to call
Building permits
City building permit applications and inspections
8710 Northwest Drive Southaven, MS 38671
Planning & zoning
Southaven Planning & Development
City zoning and development review
8710 Northwest Dr. Southaven, MS 38671
Septic permits
Onsite wastewater service and inspection requests for Southaven and DeSoto County
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Southaven means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Does Southaven have zoning, and what lot sizes and setbacks apply?
Southaven administers its own zoning inside city limits, including residential and planned unit development districts.2 Ask Southaven Planning & Development to identify the parcel’s district before choosing a house footprint or dividing land.10
In Southaven’s ER estate residential district, the minimum lot area is 1 acre and minimum width is 150 feet; building setbacks are 50 feet in front, 20 feet on each side and 40 feet at the rear.67 For single-family detached development in Southaven’s R-30 district, the minimum lot area is 30,000 square feet, with setbacks of 40 feet in front, 25 feet at the sides and 30 feet at the rear.1112 These are district-specific standards, so do not use the ER dimensions for an R-30 parcel.612
Do you need a building permit in Southaven, and who issues it?
Southaven requires a building permit before renovations, alterations, additions, accessory structures and ready-to-install structures; work without a building permit may bring a summons and penalty fees.1 Southaven’s Building Department can be reached at (662)-393-4639 or [email protected].13
Southaven building permit applicants must use the online Energov portal; the city no longer accepts paper applications.3 Payment may be made online by credit card or by check after an invoice balance is received.3 Southaven’s new residential construction fees are due when the application is submitted.14 Allow for licensing, plan review and revisions: the city describes processing times ranging from a few days to several weeks.3 Southaven adopted the 2024 International Code Set effective January 1, 2026.15
How do septic permits work inside Southaven?
MSDH administers onsite wastewater approval inside Southaven where septic is applicable; installation of an onsite wastewater disposal system requires a wastewater permit.48 A Southaven building permit does not replace that wastewater approval.18
MSDH refers applications within 1 mile of a sewer line to the sewer provider, and a Letter of Rejection is needed before septic processing proceeds.5 MSDH offers soil and site evaluations that provide a Permit/Recommendation.16 For DeSoto County onsite wastewater service and inspection requests, call the MSDH Wastewater Call Center at 855-220-0192; the local MSDH office has closed.17 Southaven properties need a permanent sewage-disposal solution before receiving a permanent water meter.5 Off-grid plans still need sanitation: wastewater must enter a central sewer or septic system, rather than discharge onto the ground or into ditches or water bodies.18
Can you live in an RV or tiny home on land in Southaven?
We could not confirm a complete rule for living long-term in an RV, occupying a tiny home or adding an independent accessory dwelling in Southaven; ask Southaven Planning & Development about the proposed use and parcel.10 Ask the Building Department what building permit and inspection requirements would apply to the proposed structure.13
Southaven prohibits camping on streets, sidewalks, rights-of-way, areas under bridges and city parks, with an exception for permitted outdoor events unless the event permit prohibits camping.19 That public-place restriction does not establish permission to live in an RV on a private residential lot.19 Whatever dwelling is proposed, Southaven wastewater must be directed into a central sewer or septic system.18
Building a home in Southaven: what are the steps, in order?
- Contact Southaven Planning & Development about the parcel’s zoning district and development approval route; Southaven development proceeds through the appropriate Planning Commission and Board of Aldermen channels before construction.10220
- Resolve sewer availability or MSDH septic approval before planning the permanent water connection.85
- Submit the Southaven building permit application through Energov and pay the new residential construction fees at submission.314
- If acting as a homeowner-builder, attach the certificate of compliance accepting project liability and hire Mississippi-licensed contractors for all trade work; the homeowner may submit only the building permit.9
- Request applicable inspections online against the active Southaven permit.21 A $125 inspection fee applies after a secondary failed inspection or when work is not ready when the inspector arrives.21
What should you check before buying land in Southaven?
Start with Southaven Planning & Development: ask about the district, intended dwelling, floodplain review, driveway access and any proposed subdivision.10 Southaven regulates subdivisions and development through its planning approval process.20 We could not confirm a general minimum dwelling floor area or a complete agricultural exemption for Southaven; ask Planning & Development and the Building Department before relying on either.1013
Mississippi generally requires a groundwater withdrawal permit for wells with surface casing diameters of 6 inches or greater, subject to exclusions; this statewide threshold does not settle every Southaven private-well requirement.22 For land outside Southaven city limits, use the DeSoto County guide for the county’s unincorporated-area building and zoning answers.2324 Keep the city boundary clear when asking for approval: Southaven’s city zoning applies inside city limits.2
Watch-outs
- A homeowner’s ability to submit a Southaven building permit does not authorize homeowner trade work; Mississippi-licensed contractors must perform that work.9
- The MSDH local office in DeSoto County has closed; direct onsite wastewater requests to the Wastewater Call Center at 855-220-0192.17
- We could not confirm private-land RV or tiny-home occupancy in Southaven; ask Planning & Development before buying for either use.10
Sources
- Acquiring A Residential Building Permit (Southaven), quoted and re-checked
- Sec. 13-12(c). Residential districts (Southaven), quoted and re-checked
- Building Department FAQs (Southaven), quoted and re-checked
- On-Site Wastewater - Mississippi State Department of Health (Southaven), quoted and re-checked
- WasteWater FAQs (Southaven), quoted and re-checked
- Sec. 13-12(c). Residential districts (Southaven), quoted and re-checked
- Sec. 13-12(c). Residential districts (Southaven), quoted and re-checked
- WasteWater FAQs (Southaven), quoted and re-checked
- southaven.org (Southaven), quoted and re-checked
- Southaven Planning & Development (southaven.org)
- Sec. 13-12(c). Residential districts (Southaven), quoted and re-checked
- Sec. 13-12(c). Residential districts (Southaven), quoted and re-checked
- Southaven Building Department (southaven.org)
- Forms (Southaven), quoted and re-checked
- Inspections and Investigations (Southaven), quoted and re-checked
- On-Site Wastewater - Mississippi State Department of Health (Southaven), quoted and re-checked
- MSDH Wastewater Call Center (desotocountyms.gov)
- WasteWater FAQs (Southaven), quoted and re-checked
- Sec. 11-69. Urban camping and improper use of public places (Southaven), quoted and re-checked
- Planning (Southaven), quoted and re-checked
- Acquiring A Residential Building Permit (Southaven), quoted and re-checked
- Guidelines for Securing the Services of a Water Well Driller (Mississippi statewide rule), quoted and re-checked
- Building Occupancy Checklist (2026 county census)
- Planning & Building (2026 county census)
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.