Copiah County, Mississippi
Town of Wesson is a town in Copiah County, Mississippi. Town of Wesson adopts its own zoning, so inside its limits Town of Wesson’s rules apply, not the county’s. Septic permits inside Town of Wesson come from the state health agency. 12 rules below are quoted from official sources and independently re-checked, most recently on November 6, 2026. Rules for unincorporated land are on the Copiah County page.
Placement of portable buildings on any lot inside Wesson town limits.
“Building, Portable: Any building that is portable in nature, without any wheels, and built on a chassis or frame designed and constructed to be used without a permanent foundation. Building permits are required prior to the placement of such buildings on any lot.”
All land within Wesson town corporate limits.
“NOW, THEREFORE, BE IT ORDAINED BY THE MAYOR AND BOARD OF ALDERMEN OF TOWN OF WESSON, MISSISSIPPI, THAT THIS ORDINANCE SHALL GOVERN THE USE OF ALL LAND WITHIN THE CORPORATE LIMITS OF TOWN OF WESSON, MISSISSIPPI.”
One-, two-, and three-or-more-bedroom dwelling units in Wesson's R-3 High Density Residential District.
minimum floor area, one-bedroom unit: 500 square feet · minimum floor area, two-bedroom unit: 700 square feet · minimum floor area, three-or-more-bedroom unit: 900 square feet
“SECTION 803 - DIMENSIONAL REQUIREMENTS FOR ALL MULTIPLE FAMILY USES [...] 803.03 Minimum Floor Area: (a) One bedroom units: 500 square feet. (b) Two bedroom units: 700 square feet. (c) Three or more bedroom units: 900 square feet.”
Single-family detached residences and duplexes in Wesson's R-2 Moderate Density Residential District.
minimum lot area, single-family detached residence: 5000 square feet · minimum lot area, duplex: 8000 square feet
“703.02 Minimum Lot Area: (a) Single-family detached residences: 5,000 square feet. (b) Duplexes: 8,000 square feet. (c) All conditional uses: Based upon site plan review.”
Single-family manufactured homes in Wesson's R-M Manufactured Home Park Residential District.
“Single-family manufactured homes (double-wide or larger) provided the trailer or towing tung and wheels are permanently removed, and the manufactured home is permanently anchored to foundation piers or a concrete slab, not merely resting upon the foundation. Further, the manufactured home must be completely skirted with brick or masonry materials from the concrete pad or foundation to the bottom of the manufactured home. Plastic, wood, aluminum, or other metal materials for skirting will not be acceptable.”
Lots proposed for building inside Wesson town limits.
“400.08 Conformance with Subdivision Regulations: No building shall be constructed on any lot which does not conform to the provisions of the Subdivision Regulations of the Town of Wesson.”
Access points serving manufactured-home parks inside Wesson town limits.
“SECTION 912 - ACCESS TO PUBLIC STREETS AND HIGHWAYS All access points to public streets or highways shall be approved by the Mayor and Board of Aldermen and/or the Mississippi State Highway Department.”
Applicants for Wesson building permits where site-plan review is required.
“The Zoning Administrator shall act as the coordinator for the site plan review process. He shall advise all applicants for building permits if the proposed use requires the preparation and submission of a site plan and the official approval of that plan prior to the issuance of the permit.”
Town of Wesson does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Individual on-site wastewater systems inside Wesson town limits, as part of the statewide Mississippi program.
“No. By law, you must apply to us and install a septic system from the Permit we issue. A Licensed Installer must install it and the proper paperwork must be submitted to the Division.”
Installation of an individual on-site wastewater disposal system inside Wesson town limits.
“The Permit is required for a water meter and the installation of an on-site wastewater disposal system.”
New individual on-site wastewater disposal systems inside Wesson town limits, except where a stated final-approval exemption applies.
installer notice before construction: >= 24 hours
“The Certified Installer is responsible for contacting the Department 24 hours BEFORE beginning construction to schedule an inspection.”
On-site sanitation inside Wesson town limits where a septic system is used.
“Mississippi does not recognize gray water. Anything that could be considered gray water in other states is classified as wastewater in Mississippi. All wastewater is required to pipe into a central sewer system or a septic system for proper disposal. No “gray water” can be discharged on the ground, ditches, or bodies of water.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Wesson or Copiah County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Wesson publishes no rule on the point, not that none exists. Copiah County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Wesson means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.