Town of Enterprise is a town in Clarke County, Mississippi. Septic permits inside Town of Enterprise come from the state health agency. 9 rules below are quoted from official sources and independently re-checked, most recently on November 8, 2026. Rules for unincorporated land are on the Clarke County page.
New residential construction inside Enterprise town limits.
building permit fee: 25 USD (for each permit)
“A building permit is required for new residential construction. The fee is $25 for each permit.”
Residential construction inside Enterprise town limits.
adopted code: 2006 International Residential Code
“Building Permits: The Town of Enterprise has adopted the 2006 International Residential Code.”
New residential construction permits inside Enterprise town limits.
building permit fee: 25 USD (for each permit)
“A building permit is required for new residential construction. The fee is $25 for each permit.”
New residential construction inside Enterprise town limits.
building permit fee: 25 USD (for each permit)
“A building permit is required for new residential construction. The fee is $25 for each permit.”
Town of Enterprise does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
On-site wastewater systems inside Enterprise town limits when an on-site system is used.
“By law, you must apply to us and install a septic system from the Permit we issue.”
Installation of an on-site wastewater disposal system inside Enterprise town limits.
“The Permit is required for a water meter and the installation of an on-site wastewater disposal system.”
Wastewater disposal inside Enterprise town limits.
“Mississippi does not recognize gray water. Anything that could be considered gray water in other states is classified as wastewater in Mississippi. All wastewater is required to pipe into a central sewer system or a septic system for proper disposal. No “gray water” can be discharged on the ground, ditches, or bodies of water.”
A property inside Enterprise town limits seeking a permanent water-meter connection.
“State law requires you have permanent sewage disposal solution available to receive a permanent water meter. Permanent sewage disposal solutions can be a sewer line or septic system. You must have a sewer option before a water utility can make a connection to your property. If public sewer is not available in your area, you will have to apply to us for the proper paperwork.”
A subdivision inside Enterprise town limits where MSDH on-site-wastewater review applies.
subdivision threshold: >= 10 lots (County ordinances may lower the minimum number of lots.)
“A subdivision is any development of land into ten (10) or more lots. County ordinances may lower the minimum number of lots. If the development will utilize public water, the Bureau of Public Water Supply may require a subdivision review, regardless of lot count.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Enterprise or Clarke County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Enterprise publishes no rule on the point, not that none exists. Clarke County’s page lists the county offices to call.