Claiborne County, Mississippi
Port Gibson is a city in Claiborne County, Mississippi. Septic permits inside Port Gibson come from the state health agency. 7 rules below are quoted from official sources and independently re-checked, most recently on November 6, 2026. Rules for unincorporated land are on the Claiborne County page.
Port Gibson does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
On-site wastewater systems serving property inside Port Gibson city limits when municipal sewer service is unavailable or MSDH accepts the application.
“The board and/or the department shall have the following duties and responsibilities: (a) To exercise general supervision over the design, installation, operation and maintenance of individual on-site wastewater disposal systems, decentralized wastewater treatment systems and cluster systems;”
Installation of an on-site wastewater disposal system inside Port Gibson city limits where an MSDH on-site wastewater system is used.
“The Permit is required for a water meter and the installation of an on-site wastewater disposal system.”
New on-site wastewater systems inside Port Gibson city limits when the applicant selects or must obtain MSDH final approval.
pre-construction notice: >= 24 hours (Certified Installer must contact the Department before beginning construction to schedule an inspection.)
“The Certified Installer is responsible for contacting the Department 24 hours BEFORE beginning construction to schedule an inspection.”
Wastewater disposal for residences inside Port Gibson city limits.
“Mississippi does not recognize gray water. Anything that could be considered gray water in other states is classified as wastewater in Mississippi. All wastewater is required to pipe into a central sewer system or a septic system for proper disposal. No “gray water” can be discharged on the ground, ditches, or bodies of water.”
A Port Gibson property seeking MSDH authorization for an on-site wastewater system and located within one mile of a sewer line.
distance from sewer line: <= 1 mile (MSDH referral to connect; MSDH may proceed only after a Letter of Rejection from the sewer provider.)
“By law, sewer systems have first-right to provide sewer to everyone. As such, MSDH automatically refers applications within one (1) mile of a sewer line to connect. We must receive a Letter of Rejection from the sewer provider before we can proceed with the application.”
MSDH on-site wastewater applications serving property inside Port Gibson city limits.
Notice of Intent plus Final Approval: 197.5 USD (Current fee stated by MSDH.) · Notice of Intent plus Exemption: 100 USD (Current fee stated by MSDH.) · Commercial Development: 412.5 USD (Plus $2.60 per unit.) · Subdivision: 325 USD (Plus $6.50 per lot.)
“Notice of Intent + Final Approval is currently $197.50 Notice of Intent + Exemption is currently $100 Existing Residential Inspection is currently $100 Private Water Well Sample is currently $10 Non-residential Water Meter is currently $0 Commercial Establishment + Final Approval is currently $412.50 Existing Commercial Establishment is currently $315 Commercial Development is currently $412.50 + $2.60/unit. A unit can be an apartment, house, trailer, RV or any other independent quarters for a single family. Subdivision is currently $325 + $6.50/lot Online payment will be subject to a processing fee. All fees are subject to change. Additional costs may be included if online application is not used.”
MSDH new on-site wastewater process for a residence inside Port Gibson city limits where an on-site system is used.
“STEP 1 – Fill out application, submit required documentation and pay fee of selected option (a processing fee will be included) STEP 2 - Soil and Site Evaluation Often referred as a “Perk Test”, this Evaluation will be performed by the local Environmentalist. STEP 3 - Permit/Recommendation This document is issued to you after the Soil and Site Evaluation. It is a listing of Individual On-site Wastewater Disposal System option(s) recommended for your property. Present this document to your water utility to receive a water meter. STEP 4 - Inspection Contact a Certified Installer to install your chosen Individual On-site Wastewater Disposal System from the option(s) recommended. The Certified Installer is responsible for contacting the Department 24 hours BEFORE beginning construction to schedule an inspection. STEP 5 - Final Approval After the inspection, you MUST provide the following to the Department:”
We looked and could not find an official answer yet. Silence is not permission; ask Port Gibson or Claiborne County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Port Gibson publishes no rule on the point, not that none exists. Claiborne County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Port Gibson means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.