Choctaw County, Mississippi
Town of Ackerman is a town in Choctaw County, Mississippi. Septic permits inside Town of Ackerman come from the state health agency. 7 rules below are quoted from official sources and independently re-checked, most recently on November 5, 2026. Rules for unincorporated land are on the Choctaw County page.
Town of Ackerman does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Individual on-site wastewater systems inside Ackerman town limits, where an on-site system is used.
“By law, you must apply to us and install a septic system from the Permit we issue. A Licensed Installer must install it and the proper paperwork must be submitted to the Division.”
Installation of an individual on-site wastewater disposal system inside Ackerman town limits.
“The Permit is required for a water meter and the installation of an on-site wastewater disposal system.”
New individual on-site wastewater systems inside Ackerman town limits.
advance notice before construction: 24 hours
“The Certified Installer is responsible for contacting the Department 24 hours BEFORE beginning construction to schedule an inspection.”
Wastewater disposal from residences inside Ackerman town limits.
“Mississippi does not recognize gray water. Anything that could be considered gray water in other states is classified as wastewater in Mississippi. All wastewater is required to pipe into a central sewer system or a septic system for proper disposal. No “gray water” can be discharged on the ground, ditches, or bodies of water.”
Water wells inside Ackerman town limits.
surface casing diameter: >= 6 inches (Some exclusions apply.)
“State law requires that you obtain a groundwater withdrawal permit for water wells with surface casing diameters 6-inches or greater in diameter. Some exclusions apply to this requirement.”
Permanent water-meter service for homes inside Ackerman town limits.
“State law requires you have permanent sewage disposal solution available to receive a permanent water meter. Permanent sewage disposal solutions can be a sewer line or septic system. You must have a sewer option before a water utility can make a connection to your property.”
MSDH on-site wastewater permits for new systems inside Ackerman town limits.
“STEP 1 – Fill out application, submit required documentation and pay fee of selected option (a processing fee will be included) STEP 2 - Soil and Site Evaluation Often referred as a “Perk Test”, this Evaluation will be performed by the local Environmentalist. STEP 3 - Permit/Recommendation This document is issued to you after the Soil and Site Evaluation.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Ackerman or Choctaw County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Ackerman publishes no rule on the point, not that none exists. Choctaw County’s page lists the county offices to call.