Town of New Houlka is a town in Chickasaw County, Mississippi. Septic permits inside Town of New Houlka come from the state health agency. 7 rules below are quoted from official sources and independently re-checked, most recently on November 7, 2026. Rules for unincorporated land are on the Chickasaw County page.

Answers from the rulebook for Town of New Houlka

Rules another office applies inside Town of New Houlka

Town of New Houlka does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Who permits septicState (with conditions)

    Individual on-site wastewater disposal systems, including systems serving land inside New Houlka town limits.

    • The Mississippi State Department of Health Division of On-site Wastewater administers approvals and enforcement under the statewide on-site-wastewater regulations.
    • Local governments may enforce other license requirements or additional measures for persons installing, repairing, or replacing an individual on-site wastewater disposal system.
    “Only the Division may issue Approvals, Acceptances, Repair Authorizations, or Final Approvals for IOWDS.”
  • Septic permitRequired

    A mobile, modular, or permanently constructed residence, building, or facility inside New Houlka town limits that may require an individual on-site wastewater disposal system.

    • A Notice of Intent must be submitted to the Department before construction or placement.
    • The rule applies where the construction or placement may require an individual on-site wastewater disposal system.
    • The applicant must select an approved system option listed in the Permit/Recommendation form.
    “Permit is required for [...] the installation of an on-site wastewater disposal system.”
  • Septic inspectionLimited

    Individual on-site wastewater disposal systems serving land inside New Houlka town limits.

    • All systems requiring Final Approval must be evaluated for compliance.
    • Existing-system inspections occur upon an applicant request, a new water-service connection, a substantiated complaint, or a medical-exception request.
    • Properties exempt under Miss. Code Ann. § 41-67-6(7) are not subject to existing-system connection-inspection events.
    • A certified installer must schedule an inspection at least 24 hours before constructing an individual on-site wastewater disposal system and may not cover work until authorized after inspection.
    “must be evaluated and, if mechanical, operated”
  • Off-grid sanitationLimited

    Wastewater disposal for residences inside New Houlka town limits.

    • Wastewater must be piped to a central sewer system or septic system for proper disposal.
    • No gray water may be discharged on the ground, ditches, or bodies of water.
    • Use of an on-site system remains subject to the state Notice of Intent, permit, installation, and approval requirements.
    “No “gray water” can be discharged on the ground”
  • Well permitLimited

    A new private water well inside New Houlka town limits when the proposed residence may require a single residential individual on-site wastewater disposal system.

    • This is a state on-site-wastewater Notice of Intent requirement, not evidence of a universal water-well construction permit.
    • The applicant must provide a legal description, plot plan, and fee.
    • The condition applies before construction or placement of a residence that may require a single residential on-site system and a new private well.
    “Prior to construction or placement of any mobile, modular, or permanently constructed residence which may require the installation of a single residential IOWDS and the need for a “new” water meter or drilling of a “new” private water well, the Applicant shall complete the Notice of Intent and provide the following to the Department:”
  • Mandatory utility hookupConditional

    A new or permanent water-service connection for a residence inside New Houlka town limits.

    • The state wastewater rule conditions water-service connection on submission of the Permit/Recommendation, which is an approved sewage treatment and disposal plan.
    • MSDH states that a permanent water meter requires a permanent sewage-disposal solution: a sewer line or septic system.
    • MSDH automatically refers applications within one mile of a sewer line to connect; the applicant needs a letter of rejection from the sewer provider before MSDH proceeds with an on-site application.

    sewer-line referral distance: <= 1 mile (MSDH automatically refers the application to connect; a sewer-provider letter of rejection is required before MSDH proceeds with the on-site application.)

    “Submit the Permit/Recommendation, for a water service connection (water meter) which is an approved plan for a sewage treatment and disposal system.”
  • Subdividing landRegulated (with conditions)

    A proposed subdivision inside New Houlka town limits that uses on-site sewage disposal systems.

    • The state wastewater subdivision rule applies to developments on 10 or more residential lots using on-site sewage disposal systems.
    • The Department's subdivision application must be submitted before commencing the development.
    • The rule does not establish whether New Houlka separately regulates subdivisions or regulates developments served by central sewer.
    • A proposal of 35 or more lots requires a feasibility study; certain subdivisions of more than 10 but fewer than 35 lots may receive a feasibility-study waiver when no sanitary sewer is feasibly available, subject to listed exceptions.

    subdivision threshold: >= 10 lots (Residential development utilizing on-site sewage disposal systems.) · feasibility-study threshold: >= 35 lots (Subject to the state rule's listed exceptions and waiver provisions.)

    “No person shall commence any act which would constitute building a development on 10 or more lots for residential use utilizing on-site sewage disposal systems prior to submitting the Subdivision Application from the Department.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Town of New Houlka or Chickasaw County directly.

  • Building permit — Residential building construction inside New Houlka town limits, apart from state on-site-wastewater approvals.
  • Owner-builder exemption — Owner-built residences inside New Houlka town limits.
  • Building code adopted — Building-code adoption for construction inside New Houlka town limits.
  • Inspections — Residential building inspections inside New Houlka town limits, excluding on-site-wastewater inspections.
  • Certificate of occupancy — Residential occupancy inside New Houlka town limits.
19 more unanswered
  • Local zoning
  • Zoning districts
  • Minimum dwelling size
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Agricultural exemption
  • Shed and accessory-building permit exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees
  • Permit process

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Town of New Houlka publishes no rule on the point, not that none exists. Chickasaw County’s page lists the county offices to call.