Calhoun County, Mississippi
Village of Pittsboro is a village in Calhoun County, Mississippi. Septic permits inside Village of Pittsboro come from the state health agency. 7 rules below are quoted from official sources and independently re-checked, most recently on November 5, 2026. Rules for unincorporated land are on the Calhoun County page.
Village of Pittsboro does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Individual on-site wastewater disposal systems inside Pittsboro village, Mississippi.
“The On-site Wastewater program develops policy and regulations [...] inspecting Individual On-site Wastewater Disposal Systems (IOWDS)”
Installation of an on-site wastewater disposal system inside Pittsboro village.
“installation of an on-site wastewater disposal system.”
Disposal of residential gray water or other wastewater on land inside Pittsboro village.
“Mississippi does not recognize gray water. Anything that could be considered gray water in other states is classified as wastewater in Mississippi. All wastewater is required to pipe into a central sewer system or a septic system for proper disposal. No “gray water” can be discharged on the ground, ditches, or bodies of water.”
Water wells inside Pittsboro village with a surface casing diameter of six inches or greater.
surface casing diameter: >= 6 inches (Some exclusions apply.)
“groundwater withdrawal permit for water wells with surface casing diameters 6-inches or greater in diameter. Some exclusions apply”
A proposed on-site wastewater application for land inside Pittsboro village where a sewer line is within one mile.
sewer-line distance triggering referral: <= 1 mile (MSDH must receive a Letter of Rejection from the sewer provider before proceeding with the on-site wastewater application.)
“within one (1) mile [...] Letter of Rejection”
MSDH on-site wastewater applications for property inside Pittsboro village.
Notice of Intent + Final Approval fee: 197.5 USD (Current fee; online payment processing fee applies.) · Notice of Intent + Exemption fee: 100 USD (Current fee; online payment processing fee applies.) · Subdivision fee: 325 USD (Plus USD 6.50 per lot; fees are subject to change.)
“$197.50 [...] $100 [...] $325 + $6.50/lot”
New individual on-site wastewater disposal systems inside Pittsboro village.
“submit required documentation and pay fee of selected option [...] Soil and Site Evaluation [...] Permit/Recommendation”
We looked and could not find an official answer yet. Silence is not permission; ask Village of Pittsboro or Calhoun County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Village of Pittsboro publishes no rule on the point, not that none exists. Calhoun County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Village of Pittsboro means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.