Bolthole Index

Bolivar County, Mississippi

Building permits, zoning and septic rules in Shaw, Mississippi

We could not confirm whether Shaw, Mississippi requires a residential building permit or which zoning rules apply; start with the Shaw municipal clerk for the local requirements.1 For Shaw property needing an individual onsite wastewater system, Mississippi State Department of Health handles the wastewater process.2 Bolivar County’s zoning answers should not be treated as Shaw’s city rules.3

At a glance

Building permits
Shaw requirement unconfirmed; ask the municipal clerk for the application and issuing office1
Zoning
Shaw districts, setbacks and minimum lot size unconfirmed; request the city ordinance and map1
Septic authority
MSDH for individual onsite wastewater systems where municipal sewer is not the applicable disposal system2
Septic application fee
$197.50 plus a processing fee; not a city building-permit fee4
RV and tiny-home living
Shaw occupancy rules unconfirmed; ask the municipal clerk before buying or placing a unit1
Owner-builder
State licensing exemption for an owner’s own residence does not establish a local building-permit exemption5
Private wells
State groundwater withdrawal permits generally apply at surface casing diameters of 6 inches or greater, with exclusions6

Who to call

Also useful

Shaw Municipal Clerk

Starting contact to request Shaw building-permit requirements, zoning materials, sewer availability and the responsible city officials; a dedicated building or planning office remains unconfirmed.

662-754-3131

[email protected]

P.O. Box 679, 38773-0679

Septic permits

Mississippi State Department of Health Division of On-Site Wastewater

Applications, site and soil evaluations, and technical assistance for individual onsite wastewater systems

1-855-220-0192

[email protected]

570 East Woodrow Wilson Drive, Jackson, MS 39216

Online permits →

Contact details are copied from each office’s official page and were checked against it on October 11, 2026.

Off-grid gear

Going off-grid in Shaw means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Shaw, MS, and who issues it?

We could not confirm Shaw’s residential building-permit requirement, adopted residential code, building-permit fees or certificate-of-occupancy process. Ask the Shaw municipal clerk for the current requirements and the official responsible for your proposed construction, alteration or placement.1 Request an application, inspection schedule and occupancy requirements before committing to a construction contract.

Mississippi’s uniform-building-code framework requires local code adoption unless a municipality opted out before the statutory deadline, but the statewide framework does not establish Shaw’s current enforcement status.7 Mississippi’s exemption for an owner building or improving the owner’s residence concerns builder licensing; the exemption does not remove any locally required building permit or inspection.5

Does Shaw have zoning, and can you live in an RV or tiny home?

We could not confirm Shaw’s zoning ordinance, zoning districts, minimum dwelling size, minimum lot size or setback schedule. Ask the Shaw municipal clerk for the ordinance and zoning map covering the exact parcel, plus a written answer about your intended use.1

We also could not confirm Shaw’s rules for residential RV occupancy, temporary camping, tiny homes or accessory dwellings. Include the unit’s construction type, foundation, wastewater arrangement and proposed occupancy duration in your question to the municipal clerk.1 A manufactured home sited in Mississippi and installed on or after July 1, 2009 must undergo the state installation inspection before occupation, and necessary state and local approvals must be obtained before installation.8

How do septic permits work inside Shaw?

MSDH handles individual onsite wastewater systems inside Shaw where municipal sewer is not the applicable disposal system.2 Ask the municipal clerk whether sewer is available to the parcel and which city connection approvals are needed.1 Mississippi requires connection and abandonment of onsite systems when centralized wastewater treatment becomes available under the state rule.9

For an onsite system, submit the application and site information to MSDH, obtain the site evaluation and system recommendation, and await authorization before construction or installation.10 The MSDH online application lists an invoice of $197.50 plus a processing fee; that amount is for the wastewater application, not Shaw building permits.4 MSDH’s Wastewater Call Center assists with applications at 1-855-220-0192.11

What are the steps to building a home in Shaw?

  1. Ask the Shaw municipal clerk to confirm city limits, identify the applicable zoning materials and provide the building-permit and occupancy requirements for the proposed home.1
  2. Ask the municipal clerk about sewer availability and connection approvals before choosing onsite sanitation.1 Public water service requires prior written Department approval of a compliant sewage treatment and disposal plan under Mississippi law.9
  3. If an onsite wastewater system is appropriate, file the complete MSDH application, supply site information and pay the invoiced fee; wait for Department authorization before wastewater construction or installation.1011
  4. For a manufactured home, obtain necessary approvals before installation and arrange the required state installation inspection before occupation.8

What should you check before buying land in Shaw?

For land outside Shaw’s city limits, consult the Bolivar County guide for the county’s answers; county and municipal zoning authority differ.3 We could not confirm Shaw’s floodplain-development or city-street driveway requirements; ask the municipal clerk to identify the responsible officials for the parcel.1 New or altered driveways connecting to Mississippi state highways require MDOT driveway approval.12

For an existing onsite wastewater system, Mississippi does not require a septic inspection solely because of a real-estate transaction, but MSDH recommends one and a lender, utility or other party may request it.13 For a proposed private well, Mississippi generally requires a groundwater withdrawal permit at surface casing diameters of 6 inches or greater, with exclusions; smaller public-system wells can still be regulated by MSDH.6

Watch-outs

  • We could not confirm Shaw’s RV, tiny-home or off-grid sanitation rules; ask the municipal clerk for a parcel-specific answer before buying a unit or land.1
  • MSDH wastewater authorization must precede onsite-system construction or installation in Shaw.10
  • The state owner-builder licensing exemption does not establish an exemption from Shaw building permits or inspections.5

Sources

  1. Shaw Municipal Clerk (sos.ms.gov)
  2. On-Site Wastewater (Shaw), quoted and re-checked
  3. Bolivar County Administrator, quoted and re-checked
  4. On-Site Wastewater Online Application (Shaw), quoted and re-checked
  5. Mississippi Senate Journal, March 9, 2022 (Mississippi statewide rule), quoted and re-checked
  6. Guidelines for Securing the Services of a Water Well Driller (Mississippi statewide rule), quoted and re-checked
  7. Mississippi Uniform Building Codes (Mississippi statewide rule), quoted and re-checked
  8. MH-5 Uniform Standards Code for Factory-Built Homes Law (Mississippi statewide rule), quoted and re-checked
  9. Mississippi State Department of Health Current Regulations: On-site Wastewater (Mississippi statewide rule), quoted and re-checked
  10. On-Site Wastewater Online Application (Shaw), quoted and re-checked
  11. Mississippi State Department of Health Division of On-Site Wastewater (msdh.ms.gov)
  12. Mississippi Access Management Guide (Mississippi statewide rule), quoted and re-checked
  13. Wastewater FAQs and Answers, quoted and re-checked

Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Shaw

Rules another office applies inside Shaw

Shaw does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Building code adoptedPartial

    Buildings inside Shaw city that fall within the Mississippi Fire Prevention Code's state-administered categories, including public-assembly buildings and buildings at least 75 feet high.

    • Public-assembly buildings are excluded where the county or municipality has adopted a fire-prevention code with standards not less stringent than the Mississippi Fire Prevention Code.
    • Buildings at least 75 feet high are subject to the state code unless the county or municipality has adopted a code with standards not less stringent.
    • The page states that the Office of the State Fire Marshal adopted the 2024 International Fire Code and International Building Code effective July 1, 2024.

    height threshold: >= 75 feet (The state-code rule does not apply where a county or municipality has adopted a fire-prevention code with standards not less stringent.)

    “which are not less than seventy-five (75) feet in height;”
  • InspectionsLimited

    State Fire Marshal inspections inside Shaw for buildings covered by the Mississippi Fire Prevention Code.

    • The State Fire Marshal Code applies to state-owned buildings, public-assembly buildings subject to state enforcement, and buildings at least 75 feet high unless a qualifying local code applies.
    • Local fire departments or other authorized local agencies may conduct inspections without the state inspection fee.

    inspection fee minimum: >= 100 USD (The fee and expenses do not apply to state or political-subdivision buildings, local-agency inspections, or religious assemblies.)

    “fire safety inspections shall be filed with the Office of the State Fire Marshal.”
  • Who permits septicState

    Individual onsite wastewater systems used inside Shaw city where the municipal sewer system is not the applicable disposal system.

    • The official program description distinguishes wastewater disposal outside municipality-approved systems.
    • Bolivar and Sunflower Counties are listed in the MSDH Central Region.
    “The On-site Wastewater program develops policy and regulations”
  • Subdividing landLimited

    Subdivision proposals inside Shaw city that rely on individual onsite wastewater disposal.

    • The official MSDH material describes wastewater-feasibility review, not the complete municipal subdivision-approval process.
    • The review concerns safe and adequate wastewater treatment and disposal.
    “Staff engineers review and authorize Certified Professional Evaluator's designed On-site Wastewater Disposal Systems, Commercial Developments (Subdivisions,”
  • Permit feesVariable (with conditions)

    MSDH onsite-wastewater applications associated with property inside Shaw city.

    • The official online application states that an invoice is emailed after application review.
    • The stated amount is for the onsite-wastewater application and does not establish Shaw's general building-permit fees.

    invoice amount: 197.5 USD (Plus a processing fee.)

    “An Invoice of $197.50 + a processing fee will be emailed within one(1) business day.”
  • Permit processPartial

    The MSDH onsite-wastewater permitting process for property inside Shaw city.

    • The applicant submits a complete application and site information.
    • The Department evaluates the site, recommends an appropriate disposal system, and approves installation after it occurs.
    • An invoice is emailed after application submission and review.
    “Construction or installation shall not begin before authorization by the department.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Shaw or Bolivar County directly.

  • Building permit — Building construction, placement, alteration, or repair inside Shaw city.
  • Owner-builder exemption — An owner building or improving a residence inside Shaw city.
  • Certificate of occupancy — Buildings inside Shaw city.
  • Local zoning — Land inside Shaw city's limits.
  • Zoning districts — Zoning districts inside Shaw city.
17 more unanswered
  • Minimum dwelling size
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Shaw publishes no rule on the point, not that none exists. Bolivar County’s page lists the county offices to call.

← All of Bolivar County: county rules, score and offices