Bolthole Index

Texas County, Missouri

Building permits, zoning and septic rules in Licking, Missouri

Licking, Missouri requires a city building permit before erecting, moving, adding to or structurally altering a building or other structure.1 Licking, in Texas County, has its own zoning map and district rules.2 City sewer-connection rules govern qualifying properties, while the Texas County Health Department is the starting contact for private septic permitting and confirmation of who handles a city address.34

At a glance

Building permits
City-issued permit required for erection, relocation, additions and structural alterations1
Zoning
City zoning districts and an official zoning map apply2
Residential lot size
R-1 residential uses: 7,200 square feet minimum area and 70 feet minimum width5
Sewer and septic
City sewer connection required when qualifying availability conditions apply; private disposal is restricted36
RV placement
Mapped A and AE flood zones have special RV placement requirements7
Street access
A permit is required for a culvert, concrete dip or other crossing over a street gutter or ditch8

Who to call

Building permits

Licking City Hall — Administration

Starting contact for city building-permit applications, zoning maps, sewer questions and referral to the floodplain administrator.

573-674-2521

[email protected]

125 S. Main Licking, MO 65542

Septic permits

Texas County Health Department

Private sewage-system design and construction-permit questions; confirm jurisdiction for a Licking city address.

417-967-4131

950 N. Hwy 63 Houston, MO, 65483

Contact details are copied from each office’s official page and were checked against it on October 11, 2026.

Off-grid gear

Going off-grid in Licking means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Licking, MO?

Yes: Licking requires a city-issued building permit before a building or other structure is erected, moved, added to or structurally altered.1 The application may be made by the owner or lessee, or by the licensed engineer or architect employed for the work.9 Licking’s application and site inspection must show compliance with the zoning ordinance before the city issues the permit.9 The published code states a $5 building-permit fee; ask City Hall to confirm the current charge before applying.10

Who handles building permits and zoning questions in Licking?

Start with Licking City Hall’s Administration Department, whose municipal page lists the City Administrator/Clerk contact and describes coordination across city departments.11 Ask City Hall for the building-permit application, the parcel’s zoning designation and the person responsible for reviewing the proposed site plan.92 Keep city building approval separate from private sewage approval: Texas County Health Department is the county-authorized onsite wastewater agency, but some incorporated addresses may be referred to Missouri DHSS.4 For land outside Licking city limits, use the Texas County guide for the unincorporated-area building-permit answer.12

Does Licking have zoning, and what lot size can you build on?

Licking divides land inside city limits into zoning districts shown on an official map adopted into the city regulations.2 For residential uses in the R-1 district, the minimum lot area is 7,200 square feet and minimum lot width is 70 feet.5 Those dimensions do not establish that a lot can support private sewage disposal: Licking’s subsurface soil-absorption threshold is 20,000 square feet, and sewer availability may require connection instead.63 Ask City Hall to confirm the parcel’s district, permitted use and setbacks before choosing a house footprint.29

How do sewer connections and septic permits work in Licking?

For qualifying occupied or used properties abutting a street, alley or right-of-way containing city sewer, Licking requires connection within 90 days after official notice if the sewer is within 100 feet of the property line.3 Licking restricts private sewage facilities, with exceptions subject to city and state requirements and a 20,000-square-foot minimum lot area for subsurface absorption.6 Before planning septic, ask City Hall about sewer availability and Texas County Health Department about the permitting authority for the address.34 The health department identifies a soils morphology report as the first design step and requires a state-registered installer.13 Do not begin installing or repairing a private system until a construction permit or exemption is confirmed.14

Can you live in an RV or tiny home in Licking?

Licking’s confirmed RV provision addresses placement in mapped A and AE flood zones, rather than establishing permission for residential RV occupancy throughout the city.7 In those flood zones, an RV must stay fewer than 180 consecutive days, be fully licensed and ready for highway use, or meet the chapter’s manufactured-home permitting, elevation and anchoring requirements.7 We could not confirm a general RV-living or temporary-camping permission, or a tiny-home occupancy rule; ask City Hall about the proposed use and zoning district before buying. A tiny home that qualifies as a building or structure still falls under Licking’s building-permit requirement for erection or relocation.1

What are the steps to building a home in Licking?

  1. Ask City Hall to identify the parcel’s zoning district and review the proposed residential use and site layout.29
  2. Resolve wastewater first: check city sewer availability, then confirm private-system jurisdiction with Texas County Health Department if sewer is unavailable.34
  3. Check floodplain status and ask City Hall for the responsible floodplain administrator; Missouri requires a permit for all floodplain development.15
  4. Apply for the city building permit and complete the zoning-compliance site review before covered construction begins.19
  5. Obtain the separate street-crossing permit before constructing a culvert, concrete dip or other crossing over a city street gutter or ditch.8

Watch-outs

  • Licking’s RV flood-zone alternatives do not establish general permission to live in an RV on a city lot.7
  • Licking’s hay-production exemption in the Agricultural/Non-Urban district concerns grass height; it is not a building-permit exemption.161
  • Confirm the septic authority for a Licking address with Texas County Health Department because incorporated areas may be referred to DHSS.4
  • Licking requires a zoning-compliance site inspection before issuing a building permit; ask City Hall about the construction-code edition, later inspections, occupancy approval and private wells, which we could not confirm.9

Sources

  1. Chapter 14, Section 14-1 — Building permit requirements (Licking), quoted and re-checked
  2. Appendix A, Section 3 — Zoning map (Licking), quoted and re-checked
  3. Chapter 90, Section 90-34 — Installation of toilet facilities and connection to public system required (Licking), quoted and re-checked
  4. OWTS Construction Permit Process, quoted and re-checked
  5. Appendix A, Section 6 — Single Family Residential District (R-1) (Licking), quoted and re-checked
  6. Chapter 90, Section 90-71 — Restricted (Licking), quoted and re-checked
  7. Chapter 38, Section 38-64 — Recreational vehicles (Licking), quoted and re-checked
  8. Chapter 74, Section 74-31 — Permit required (Licking), quoted and re-checked
  9. Chapter 14, Section 14-1 — Building permit requirements (Licking), quoted and re-checked
  10. Chapter 14, Section 14-1 — Building permit requirements (Licking), quoted and re-checked
  11. Licking City Hall — Administration (lickingmo.org)
  12. State of Missouri - County Building Codes for Missouri (data.mo.gov) (2026 county census)
  13. Texas County Health Department (texascountyhealth.org)
  14. OWTS Construction Permit Process, quoted and re-checked
  15. Floodplain Forms (Missouri statewide rule), quoted and re-checked
  16. Chapter 94, Section 94-5 — Exemptions from this article (Licking), quoted and re-checked

Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Licking

Licking’s own rules

  • Building permitRequired

    Erection, movement, addition to, or structural alteration of a building or other structure inside Licking city limits

    • A city-issued permit is required before the covered work.
    “No building or other structure shall be erected, moved, added to or structurally altered without a permit therefor issued by the city.”
  • Local zoningPresent

    Land inside Licking city limits

    • The city zoning map is adopted as part of the zoning regulations.
    “The City of Licking is hereby divided into zoning districts as shown on the official Zoning Districts Map, which together with explanatory information thereon is hereby adopted by reference and declared to be a part of these regulations.”
  • Zoning districtsPublished

    Zoning districts inside Licking city limits

    • The official zoning map is adopted by reference and is part of the regulations.
    “The City of Licking is hereby divided into zoning districts as shown on the official Zoning Districts Map, which together with explanatory information thereon is hereby adopted by reference and declared to be a part of these regulations.”
  • Minimum lot sizeSpecified

    Single-family residential uses in the R-1 district

    • The lot must also have a minimum width of 70 feet.

    minimum lot area: >= 7200 square feet · minimum lot width: >= 70 feet

    “The minimum lot area for residential uses shall be 7,200 square feet, and the lot shall have a minimum width of 70 feet.”
  • Off-grid sanitationLimited

    Private or off-grid sewage disposal inside Licking city limits

    • The general prohibition is subject to exceptions elsewhere in the chapter.
    • A private system must comply with city and state environmental-quality recommendations and the 20,000-square-foot subsurface-absorption threshold.
    • Connection to public sewer is required when the code's availability and distance conditions are met.

    minimum lot area for subsurface soil absorption: >= 20000 square feet

    “Except as hereinafter provided, it shall be unlawful to construct or maintain any privy, privy vault, septic tank, cesspool, or other facility intended or used for the disposal of sewage.”
  • Mandatory utility hookupSewer (with conditions)

    Properties used for human occupancy, employment, recreation, or other purposes inside Licking city limits where a city public sanitary or combined sewer is located in the abutting street, alley, or right-of-way

    • Connection is required within 90 days after official notice.
    • The public sewer must be within 100 feet of the property line.
    • When a public sewer later becomes available, connection is required within 60 days and the private system must be cleaned and filled.

    sewer distance threshold: <= 100 feet from property line · connection deadline after official notice: 90 days · connection deadline when sewer becomes available: 60 days

    “The owner of all houses, buildings, or properties used for human occupancy, employment, recreation, or other purposes situated within the city, and abutting on any street, alley, or right-of-way in which there is now located or may in the future be located any public sanitary (or combined) sewer of the city, is hereby required at his expense to install suitable toilet facilities therein, and to connect such facilities directly with the proper public sewer in accordance with the provisions of this article, within 90 days after date of official notice to do so, provided that said public sewer is within 100 feet (30.48 meters) of the property line.”
  • Agricultural exemptionConditional

    Premises in Licking's Agricultural/Non-Urban zoning district used for hay production

    • The exemption applies only to the height-of-grass requirement in the vegetation, weeds, trash and ditches article.
    • Premises not zoned Agricultural/Non-Urban may request an exemption at a regularly scheduled board-of-aldermen meeting.
    “Premises in areas of the city that are zoned agricultural/non-urban district are exempt from this ordinance as to the height of grass when such premises are used for hay production.”
  • Driveway accessRequired

    Construction of a culvert, concrete dip, or other crossing over a gutter or ditch along a street inside Licking city limits

    • A permit must be secured before construction.
    “It is hereby made unlawful for any person, firm, or corporation to construct any culvert, concrete dip, or any crossing whatsoever over any gutter or ditch along any street in this city without first securing a permit.”
  • Building in a floodplainLimited

    Recreational vehicles and manufactured homes placed in mapped A or AE flood zones inside Licking city limits

    • RV placement must satisfy one of the three alternatives in Section 38-64.
    • Manufactured homes must be elevated and anchored to resist flotation, collapse, or lateral movement.
    • The cited requirements apply to mapped numbered and unnumbered A zones and AE zones on the community FIRM.

    RV short-stay alternative: < 180 consecutive days

    “Require that recreational vehicles placed on sites within all numbered and unnumbered A zones and AE zones on the community's FIRM either: (1) Be on the site for fewer than 180 consecutive days; (2) Be fully licensed and ready for highway use*; or (3) Meet the permitting, elevation, and anchoring requirements for manufactured homes of this chapter.”
  • Permit feesPublished

    Building permits issued by Licking city

    • The quoted code provision states a $5.00 fee for permits issued from and after passage of the section; no newer fee schedule was located in the opened materials.

    building permit fee: 5 USD

    “A fee shall be charged for building permits issued from and after the passage of this section in the sum of $5.00.”
  • Permit processPartial

    City building-permit applications inside Licking city limits

    • Application may be made by the owner, lessee, licensed engineer, or architect employed for the work.
    • The application and site inspection must show compliance with the city zoning ordinance before a permit is issued.
    “Application for a permit shall be made by the owner or lessee of the building or structure, or by the licensed engineer or architect employed in connection with the proposed work.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Licking or Texas County directly.

  • Owner-builder exemption — Owner-builder exemption from Licking city building permits
  • Building code adopted — Building-code adoption inside Licking city limits
  • Inspections — Building inspection inside Licking city limits
  • Certificate of occupancy — Certificate of occupancy inside Licking city limits
  • Minimum dwelling size — Residential districts inside Licking city limits
9 more unanswered
  • Lot coverage
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Septic inspection
  • Well permit
  • Subdividing land
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Licking publishes no rule on the point, not that none exists. Texas County’s page lists the county offices to call.

← All of Texas County: county rules, score and offices