Hurley is a city in Stone County, Missouri. Septic permits inside Hurley come from Hurley. 5 rules below are quoted from official sources and independently re-checked, most recently on November 5, 2026. Rules for unincorporated land are on the Stone County page.
Hurley does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
An owner constructing, adding to, altering, repairing, or maintaining the onsite wastewater system serving the owner's permanent residence inside Hurley city limits, Stone County
“Registration is not required for homeowners to install, add to, alter, repair or perform maintenance to the onsite wastewater treatment system that serves his permanent residence, however, he must obtain a construction and/or operating permit.”
Onsite wastewater treatment systems inside Hurley city limits, which are within Stone County
“The Stone County Health Department or its designated representative shall be the authority for administering this Onsite Wastewater Treatment Systems Ordinance, for issuing permits for construction or repairs, and shall investigate alleged violations of this ordinance and Sections 701.025 through 701.059 RSMo.”
Construction, modification, or repair of an onsite wastewater treatment system inside Hurley city limits, Stone County
sanitary sewer/community wastewater-system proximity: < 200 feet (A permit may be denied if connection is allowed or approved by that system's authority.) · permit validity: 1 year (A new permit must be issued if the system is not constructed, modified, or repaired during that year.)
“It shall be unlawful for any person, partnership, company, corporation, or other business entity to construct, modify or repair an onsite wastewater treatment system within Stone County unless that person holds a valid onsite wastewater permit as required by this ordinance issued by the Stone County Health Department.”
Permitted onsite wastewater-system work inside Hurley city limits, Stone County
inspection proportion for registered installers: >= 60 percent (Applies to systems required to have a permit.) · inspection proportion for homeowner non-registered installers: 100 percent (Applies to systems required to have a permit.)
“At least sixty-percent (60%) of onsite wastewater treatment systems constructed, modified or repaired, by registered installers that are required to have a permit, will be inspected by the Stone County Health Department or its designated representative and one-hundred percent (100%) of onsite wastewater treatment systems constructed, modified or repaired by homeowner non-registered installers, that are required to have a permit, will be inspected by the Stone County Health Department or its designated representative.”
The onsite-wastewater permit process for property inside Hurley city limits, Stone County
“All permit applications shall include plans and specifications to demonstrate in writing and graphically that the proposed onsite wastewater treatment system to be constructed, repaired, or modified shall conform to, or be in compliance with, the design standards and requirements included in these regulations.”
We looked and could not find an official answer yet. Silence is not permission; ask Hurley or Stone County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Hurley publishes no rule on the point, not that none exists. Stone County’s page lists the county offices to call.