Miner, Missouri has city zoning and adopted construction codes; ask Miner City Hall to confirm the building permit needed for your project.123 Miner public sewer connections require a written city permit, while septic systems on the Scott County side are regulated by the Scott County Health Department.45 For the Mississippi County portion of Miner, confirm septic jurisdiction with the Mississippi County Health Department before applying.6

At a glance

Building permits
General requirement unconfirmed; ask Miner City Hall about your project and applicable construction codes23
Zoning
City zoning applies inside Miner city limits1
Sewer connection
Written permit from the city inspector; connection inspection required4
Septic systems
Most installations and repairs need a construction permit; Scott County Health Department handles the Scott County portion75
Camping and RV living
Primitive camping requires a permit unless exempt; ask City Hall separately about residential RV occupancy83
Residential lot size
R-2: 7,000 square feet for a detached single-family dwelling; A-1: 2.5 acres for a rural non-farm single-family dwelling910
Floodplain development
City floodplain development permit required for covered construction and manufactured-home placement11

Who to call

Also useful

Miner City Hall

Starting contact to request the city building-permit, zoning, sewer-inspection and floodplain contacts for a proposed project.

573-471-8520

2610 E. Malone Ave. Miner, Mo. 63801

Septic permits

Scott County Health Department, Environmental

Septic construction permits, soil-report review and final inspections for the Scott County portion of Miner; private-water testing.

573-471-4044

[email protected]

102 Groves Estates Court P.O. Box 129 Sikeston, MO 63801

Septic permits

Mississippi County Health Department, Environmental

Contact to confirm septic jurisdiction for a parcel in the Mississippi County portion of Miner.

(573)683-2191

1200 East Marshall, Charleston, MO 63834

Contact details are copied from each office’s official page and were checked against it on October 11, 2026.

Off-grid gear

Going off-grid in Miner means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Miner, Missouri?

Miner has adopted the 2018 International Building Code and International Residential Code, subject to local amendments and provisions for subsequent editions.2 We could not confirm the general building-permit requirement, ordinary construction inspection schedule, certificate-of-occupancy requirement or an owner-builder exemption for Miner; ask City Hall for the requirements for your proposed home, addition or outbuilding.3

The confirmed city approvals are more specific: connecting to Miner public sewer requires a written permit from the inspector, and covered development in the city’s floodplain requires a floodplain development permit.411 Ask for the applicable building-permit application and current code edition before commissioning final plans.3

Who handles building-permit and zoning questions in Miner?

Start with Miner City Hall, whose published telephone number is 573-471-8520.3 Ask City Hall to connect you with the office responsible for building permits, the zoning administrator, the sewer inspector and the city floodplain administrator.3 Request project-specific forms, fees and inspection instructions rather than treating a sewer connection form as a building-permit application.123

Miner’s zoning and construction codes govern the city questions; septic regulation on the Scott County side stays with the Scott County Health Department.125 For property outside city limits, use the Scott County guide for the county contacts and unincorporated-land questions.13

Does Miner have zoning, minimum lot sizes and setbacks?

Miner has its own zoning ordinance, with districts including Agricultural, Single-Family Residential, Multiple-Family Residence, and Manufactured Homes and Parks.14 Ask City Hall to identify the parcel’s zoning district before comparing lot sizes or proposing a different residential use.3

In Miner’s R-2 district, a detached single-family dwelling requires a lot of at least 7,000 square feet; two-family and multifamily structures require 3,000 square feet of lot area per dwelling unit.9 In Miner’s A-1 district, rural non-farm single-family dwellings are permitted on parcels of at least 2.5 acres.10 These are district-specific lot requirements, rather than minimum house floor areas.910 We could not confirm the applicable setbacks, height, lot coverage or minimum dwelling floor area; request the dimensional schedule for your district from City Hall.3

How do sewer connections and septic permits work in Miner?

Miner public sewer connections require a written permit from the inspector, with application on a city-provided form and inspection of the connection under inspector supervision; the owner pays connection costs.412 Ask the city inspector about sewer availability before planning an onsite system.12

Most septic installations and repairs in Miner require a construction permit, and work should wait until the permit is issued or an exemption is confirmed.7 For the Scott County portion, the Scott County Health Department reviews the soil morphology report and application, visits the site, and performs a final inspection after installation.1516 For the Mississippi County portion, ask that county’s Environmental program to confirm whether the county or Missouri DHSS processes the city parcel’s application.6 Missouri’s DHSS-program application fees were temporarily suspended effective August 28, 2026; confirm any local charges with the responsible health department.17

Can you live in an RV or tiny home in Miner?

Miner requires a permit for primitive camping on yards, lots or grounds unless a stated exemption applies; primitive camping means designated campsites without running water and electricity.8 That camping provision does not establish permission to use an RV as a permanent residence.8 Ask City Hall specifically about residential RV occupancy, temporary living during construction and the applicable zoning district.3

We could not confirm a Miner rule specifically authorizing tiny-home occupancy or accessory dwelling units, or a minimum dwelling floor area; ask City Hall to evaluate the proposed dwelling and its location.3 Miner’s adopted residential code and zoning remain relevant to the proposal.21 Include the wastewater plan in that discussion: public sewer connection and onsite sewage construction have separate approval requirements.47

What steps should you take before building a home in Miner?

  1. Ask Miner City Hall to confirm the parcel’s zoning district, permitted use, dimensional requirements and building-permit application for the proposed dwelling.13
  2. Resolve wastewater service: request the city sewer connection form, or confirm septic jurisdiction and obtain the required permit or confirmed exemption before onsite work begins.12756
  3. Ask the city floodplain administrator whether the site needs a floodplain development permit, including for manufactured-home placement.11
  4. If driveway work enters MoDOT right-of-way, obtain the required state driveway permit; that rule is specific to MoDOT right-of-way.18
  5. Request the city’s construction inspection and occupancy instructions, and arrange the sewer connection inspection or Scott County septic final inspection as applicable.31216

For a private well proposal, ask City Hall about municipal restrictions and the Scott County Health Department about water testing; Missouri’s well-construction and installer-permit rules apply separately.31920

Watch-outs

  • Miner’s agricultural district does not establish a city building-permit exemption; the cited Missouri county agricultural land-use exemption excludes incorporated territory.1021
  • A sewer connection permit is separate from a floodplain development permit for covered development in Miner.411
  • Confirm the septic agency for the parcel’s county before applying: Scott County Health Department regulates the Scott County portion, while the Mississippi County portion needs confirmation of the city allocation.56

Sources

  1. Miner Code § 44-60, R-1 Single-Family Residential District (Miner), quoted and re-checked
  2. Miner Code § 8-27, Construction codes adopted by reference (Miner), quoted and re-checked
  3. Miner City Hall (cityofminer.com)
  4. Miner Code § 42-155, Public sewer permits (Miner), quoted and re-checked
  5. Environmental, quoted and re-checked
  6. Mississippi County Health Department, On-Site Sewage Program (Miner), quoted and re-checked
  7. Missouri DHSS, OWTS Construction Permit Process (Miner), quoted and re-checked
  8. Miner Code § 30-27, Primitive camping—Permit required (Miner), quoted and re-checked
  9. Miner Code § 44-61, R-2 Multiple-Family Residence District (Miner), quoted and re-checked
  10. Miner Code § 44-59, A-1 Agricultural Zoning District (Miner), quoted and re-checked
  11. Miner Code § 16-62, Floodplain administration (Miner), quoted and re-checked
  12. Miner Code § 42-155, Public sewer permits (Miner), quoted and re-checked
  13. Scott County Assessor, quoted and re-checked
  14. Miner Code § 44-60, R-1 Single-Family Residential District (Miner), quoted and re-checked
  15. Environmental, quoted and re-checked
  16. Environmental, quoted and re-checked
  17. OWTS Construction Permit Process (Missouri statewide rule), quoted and re-checked
  18. Permits | Missouri Department of Transportation (Missouri statewide rule), quoted and re-checked
  19. Scott County Health Department, Environmental (scottcountyhealth.com)
  20. Water Wells - PUB2945, quoted and re-checked
  21. RSMo Section 64.890 — Building and land use restrictions; exemptions (Missouri statewide rule), quoted and re-checked

Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Miner

Miner’s own rules

  • Building code adoptedAdopted (with conditions)

    Construction inside Miner city limits.

    • The listed codes may be amended by other provisions of Chapter 8 or the Code generally.
    • Subsequent editions or amendments and state amendments or errata become effective 30 days after the board of aldermen receives notice unless disapproved within that period.

    building code edition: 2018 (International Building Code) · residential code edition: 2018 (International Residential Code)

    “International Building Code, 2018 Edition. (2) International Residential Code, 2018 Edition.”
  • Local zoningPresent

    Land inside Miner city limits; Miner has its own Chapter 44 ZONING ordinance with A-1, R-1, R-2 and M-1 districts.

    “The R-1 district is intended and designed to provide for low density residential development.”
  • Zoning districtsPublished

    Zoning districts inside Miner city limits.

    • Opened official sections identify A-1 Agricultural, R-1 Single-Family Residential, R-2 Multiple-Family Residence, and M-1 Manufactured Homes and Parks districts.
    “The A-1 Agricultural District is designed to prevent haphazard development in areas set aside under the comprehensive plan as reserved for future orderly urban development.”
  • Camping on your landLimited

    Primitive camping on any yard, lot, or grounds inside Miner city limits.

    • A permit is required unless an exemption under § 30-28 applies.
    • Primitive camping means designated camping sites without running water and electricity.
    • The cited ordinance was adopted April 18, 2017.
    “No person shall advertise, conduct, carry on or permit any primitive camping upon any yard, lot or grounds within the city without having been issued a permit”
  • Mandatory utility hookupSewer (with conditions)

    Connections to Miner public sewer inside city limits.

    • No unauthorized connection, use, alteration, or disturbance is allowed without a written permit.
    • The owner bears connection costs.
    • A separate independent building sewer is required for every building, subject to the stated rear-building exception.
    • The connection must be inspected under the supervision of the inspector.
    “without first obtaining a written permit from the inspector.”
  • Building in a floodplainRequired

    Proposed construction or other development, including manufactured-home placement, in Miner floodplain areas described by the city code.

    • A separate floodplain development permit is required for each structure or other development.
    • The floodplain administrator must review applications and issue permits for approved applications.
    • Flood-zone construction has additional elevation, anchoring, flood-damage, utility, and drainage requirements.
    “A floodplain development permit shall be required for all proposed construction or other development, including the placement of manufactured homes”
  • Permit processPartial

    Public sewer connection permits inside Miner city limits.

    • The owner or agent must apply on the city’s special form.
    • Plans, specifications, or other information may be required by the inspector.
    • The applicant must notify the inspector when the sewer is ready for inspection and connection.
    • The connection must be made under inspector supervision.
    “the owner or his agent shall make application on a special form furnished by the city.”

Rules another office applies inside Miner

Miner does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Minimum lot sizeSpecified

    Single-family, two-family, and multifamily residential lots in Miner city’s R-2 district.

    • The required area differs by dwelling type.

    single-family detached minimum lot area: >= 7000 square feet · two-family minimum lot area per unit: >= 3000 square feet · multifamily minimum lot area per unit: >= 3000 square feet

    “7,000 square feet for single-family detached units, 3,000 square feet for each unit in a two-family structure”
    One more reviewed finding on this topic
    • Specified — Rural non-farm single-family dwellings in Miner city’s A-1 district.
      “Rural non-farm single-family dwellings are permitted on lots or other parcels of property ownerships of 2½ acres or more.”
  • Who permits septicCounty (with conditions)

    The Mississippi County portion of Miner city for domestic onsite sewage systems.

    • The Mississippi County Health Department page states that the county health department is the regulatory agency for the described process.
    • The state page separately warns that some incorporated areas may defer permitting back to DHSS; confirm the incorporated-city allocation for a specific parcel.
    “returned to the regulatory agency (County Health Dept).”
  • Septic permitRequired

    Most onsite wastewater treatment systems serving land inside Miner city limits.

    • Some single-family residential lots may be exempt.
    • Work should not begin until a permit has been issued or an exemption confirmed.
    • The state process varies by permitting authority.
    • Effective August 28, 2026, application fees were temporarily suspended.
    “A construction permit is required before installing or repairing most onsite wastewater treatment systems (OWTS).”
  • Subdividing landRegulated (with conditions)

    Subdivisions inside Miner city when onsite wastewater treatment is planned.

    • Missouri DNR approval is required for domestic wastewater treatment methods in new residential housing developments meeting the stated criteria.
    • DNR also states that it regulates certain systems by discharge type, flow, and facility type.

    flow threshold: > 3000 gallons per day (DNR jurisdiction for systems exceeding this flow)

    “Approving the method of domestic wastewater treatment in new residential housing developments (such as subdivisions, recreational developments and multiple family housing units)”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Miner or Scott County directly.

  • Building permit — General building permits for construction inside Miner city limits.
  • Owner-builder exemption — Owner-builders constructing inside Miner city limits.
  • Inspections — General construction inspections inside Miner city limits.
  • Certificate of occupancy — Certificates of occupancy for buildings inside Miner city limits.
  • Minimum dwelling size — Residential dwellings inside Miner city limits.
9 more unanswered
  • Setbacks
  • Lot coverage
  • Building height
  • Tiny homes
  • Accessory dwellings
  • Well permit
  • Agricultural exemption
  • Driveway access
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Miner publishes no rule on the point, not that none exists. Scott County’s page lists the county offices to call.

← All of Scott County: county rules, score and offices