Dixon, Missouri requires a city building permit before construction begins inside city limits.1 In Pulaski County, Missouri DHSS regulates onsite wastewater, while Dixon also requires a City Superintendent permit for private sewage disposal when public sewer is unavailable.23 Dixon prohibits RV residential use except temporary visits lasting less than 30 days, and we could not confirm an operative city zoning district schedule.4

At a glance

Building permits
Required before construction inside Dixon city limits1
Zoning
Not confirmed; ask Dixon City Hall for the parcel’s applicable land-use rules5
Septic permits
City Superintendent approval plus Missouri DHSS permitting or confirmed exemption32
RV living
Residential use prohibited; visitors may stay less than 30 days without City utility connections4
Setbacks
At least 25 feet from roadway and 10 feet from side lot or boundary line6
Septic lot size
At least 40,000 square feet for a subsurface soil-absorption system; not a general zoning minimum7

Who to call

Building permits

Dixon City Hall

Receives city building permit applications and directs questions about city land-use requirements and the City Superintendent

573-917-4501

305 S Elm Street Dixon, MO 65459

Building permits

City of Dixon Public Works Department

Publishes building permit application requirements, fees and inspection responsibilities

573-917-4501

305 South Elm Dixon, MO. 65459

Septic permits

Missouri DHSS Onsite Wastewater Treatment Program

OWTS construction permits and general permitting questions for state-administered counties, including Pulaski County

573-751-6095

[email protected]

PO Box 570, Jefferson City, MO 65102-0570

Online permits →

Contact details are copied from each office’s official page and were checked against it on October 12, 2026.

Off-grid gear

Going off-grid in Dixon means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Dixon, MO?

Dixon requires a building permit before construction of any type inside city limits; submit the application to Dixon City Hall before starting work.1 Work performed before obtaining the city building permit may be deemed unsatisfactory and ordered demolished.1 Dixon’s permit application requires scaled drawings for all buildings and states that performance bonds are required, with the bond amount based on projected cost.8 Ask City Hall which drawings, bond and inspections apply to your proposed project before ordering materials.

Who issues building permits in Dixon, and how do you apply?

Dixon City Hall receives the city building permit application; the City’s Public Works Department publishes the application and its construction requirements.58 Contractors working inside Dixon city limits must have a current business license on file.8 Dixon’s building permit applicant must schedule necessary inspections and have a representative present at scheduled inspections.9 Failure to meet those inspection requirements may result in a stop-work order and rescheduling fees.9 Ask City Hall for the inspection sequence and current building permit charges for your particular work.

Does Dixon have zoning, and what setbacks apply?

We could not confirm an operative Dixon zoning district schedule; ask Dixon City Hall which land-use restrictions apply to the parcel and proposed use. Dixon’s general building permit application nevertheless states that structures must be at least 25 feet from the roadway and at least 10 feet from any side lot or boundary line.6 Dixon also has a separate wastewater siting rule: a subsurface soil-absorption system cannot receive a permit on a lot smaller than 40,000 square feet.7 That wastewater threshold is not a general zoning minimum lot size.7

How do septic permits work inside Dixon?

For private sewage disposal where public sewer is unavailable, Dixon requires a written permit signed by the City Superintendent before construction and a city permit and inspection fee with the application.3 Missouri DHSS is the onsite wastewater regulatory authority for Pulaski County, so city approval and state wastewater requirements both need attention inside Dixon.2 Missouri generally requires an onsite wastewater construction permit, although some single-family lots may qualify for an exemption confirmed by the permitting authority.10 A state exemption should not be treated as a waiver of Dixon’s separate city septic permit.3 Notify the City Superintendent before covering underground work and when ready for final inspection; Dixon’s code specifies inspection within 72 hours after notice.11

Can you live in an RV or tiny home in Dixon?

Dixon prohibits using an RV or travel trailer as a residence on a city lot or tract, except temporary occupancy by visitors for less than 30 days.4 During that temporary visitor occupancy, Dixon prohibits connection to City water, sewer or electrical systems.4 The visitor exception does not establish permission to live in an RV while building a home.4 We could not confirm Dixon’s tiny-home, accessory-dwelling or minimum dwelling-size rules; ask City Hall about the exact design and occupancy you intend before buying a small structure. Dixon’s construction permit requirement still applies to construction inside city limits.1

Building a home in Dixon: what are the steps?

  1. Ask Dixon City Hall to confirm the parcel’s city-limit status, applicable land-use restrictions and the proposed building location; use the city application’s roadway and boundary setbacks when preparing plans.6
  2. Submit scaled building drawings with the Dixon building permit application and obtain the city building permit before construction begins.81
  3. Ask the City Superintendent whether public sewer is available; if private sewage disposal is proposed, obtain the city septic permit and contact Missouri DHSS about state permitting or a confirmed exemption before wastewater work starts.310
  4. Schedule building inspections with a representative present, and notify the Superintendent before underground septic work is covered.911

What should you check before buying land in Dixon?

For land outside Dixon city limits, use the Pulaski County guide for the county-side building permit answer; Dixon’s city construction requirement applies inside city limits.1 Before buying a Dixon lot for septic, check its area against the city’s 40,000-square-foot minimum for subsurface soil absorption.7 For a driveway constructed or modified within MoDOT right-of-way, obtain a MoDOT right-of-way permit.12 Missouri requires some type of permit for all floodplain development, but we could not confirm Dixon’s local floodplain application process; ask City Hall which community floodplain administrator handles the parcel.13 We could not confirm Dixon’s private-well rule; ask City Hall about water service and whether your proposed water source is allowed.

Watch-outs

  • Dixon’s temporary RV visitor exception prohibits City water, sewer and electrical connections.4
  • Missouri DHSS temporarily suspended onsite sewage construction, modification and repair application fees effective August 28, 2026; Dixon’s separate city septic permit and inspection fee still needs confirmation with the City Superintendent.143
  • We could not confirm a Dixon homeowner exemption from building permits or inspections; ask City Hall before treating owner-performed work as exempt.5

Sources

  1. Building Permit - City of Dixon (Dixon), quoted and re-checked
  2. Chapter 705 Public and Private Sewers (Dixon), quoted and re-checked
  3. Chapter 705 Public and Private Sewers (Dixon), quoted and re-checked
  4. ecode360.com (Dixon), quoted and re-checked
  5. Dixon City Hall (dixonmo.gov)
  6. City of Dixon General Build Permit Application (Dixon), quoted and re-checked
  7. Chapter 705 Public and Private Sewers (Dixon), quoted and re-checked
  8. City of Dixon Public Works Department (img1.wsimg.com)
  9. City of Dixon General Build Permit Application (Dixon), quoted and re-checked
  10. OWTS Construction Permit Process (Missouri statewide rule), quoted and re-checked
  11. Chapter 705 Public and Private Sewers (Dixon), quoted and re-checked
  12. Permits | Missouri Department of Transportation (Missouri statewide rule), quoted and re-checked
  13. Floodplain Forms (Missouri statewide rule), quoted and re-checked
  14. OWTS Construction Permit Process, quoted and re-checked

Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Dixon

Dixon’s own rules

  • Building permitRequired

    Construction of any type inside Dixon city limits

    • Construction cannot begin before the permit is obtained.
    • The City permit application states that work performed before acquiring a permit may be deemed unsatisfactory and ordered demolished.
    “This form should be completed and submitted to the City Hall to obtain a building permit.”
  • InspectionsRequired

    Permitted construction inside Dixon city limits

    • The permit applicant is responsible for scheduling necessary inspections.
    • A representative must be present at scheduled inspections.
    • Failure to meet inspection requirements may result in a stop-work order and rescheduling fees.
    “responsible for assuring that inspections are scheduled as necessary”
  • Minimum lot sizeSpecified

    Lots inside Dixon city limits seeking a private sewage disposal system using subsurface soil absorption facilities

    • This is a wastewater-system siting minimum, not a general zoning minimum lot size.
    • No permit may be issued for a subsurface soil-absorption system on a lot smaller than 40,000 square feet.

    minimum lot area: >= 40000 square feet (private sewage disposal system employing subsurface soil absorption facilities)

    “No permit shall be issued for any private sewage disposal system employing subsurface soil absorption facilities where the area of the lot is less than forty thousand (40,000) square feet. No septic tank or cesspool shall be permitted to discharge to any natural outlet.”
  • SetbacksSpecified

    Structures subject to the City of Dixon general building permit application

    • The application states that all structures must be at least 25 feet from the roadway and at least 10 feet from any side lot or boundary line.

    roadway setback: >= 25 feet · side lot or boundary setback: >= 10 feet

    “not be less than twenty-five (25) feet from the roadway”
  • Living in an RVTemporary only (with conditions)

    Recreational vehicles and travel trailers used as residences on lots or tracts inside Dixon city limits

    • Residential use of an RV or travel trailer is unlawful.
    • The exception is temporary occupancy by visitors for less than 30 days.
    • During temporary occupancy, connection to City water, sewer, or electrical systems is prohibited.

    maximum temporary occupancy: < 30 days (visitors temporarily occupying an RV or travel trailer)

    “occupied temporarily by a person or person(s) visiting the City for a period of less than thirty (30) days”
  • Who permits septicMixed (with conditions)

    Onsite wastewater systems inside Dixon city limits

    • Dixon's sewer code requires a city permit signed by the Superintendent for private sewage disposal systems.
    • The Pulaski County Health Center states that Missouri DHSS is the regulatory authority for the OWTS program in Pulaski County.
    • Dixon's code requires compliance with Missouri Department of Public Health recommendations and allows additional Health Officer requirements.
    “Currently, MO Department of Health & Senior Services is the regulatory authority for the OWTS program within Pulaski County.”
  • Septic permitRequired

    Private sewage disposal systems inside Dixon city limits when public sewer is unavailable

    • A written permit signed by the City Superintendent is required before construction begins.
    • A permit and inspection fee set by the Board of Aldermen is due with the application.
    • Missouri DHSS rules may include single-family-lot exemptions; the applicable permitting authority must confirm any exemption.
    “A construction permit is required before installing or repairing most onsite wastewater treatment systems (OWTS). Some single family residential lots may be exempt from permitting.”
  • Septic inspectionRequired

    Private sewage disposal systems inside Dixon city limits

    • The Superintendent may inspect at any stage.
    • The applicant must notify the Superintendent before underground portions are covered and when ready for final inspection.
    • Inspection is to be made within 72 hours after notice.

    inspection deadline: 72 hours (after receipt of notice by the Superintendent)

    “He shall be allowed to inspect the work at any stage of construction and, in any event, the applicant for the permit shall notify the Superintendent when the work is ready for final inspection, and before any underground portions are covered. The inspection shall be made within seventy-two (72) hours of the receipt of notice by the Superintendent.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Dixon or Pulaski County directly.

  • Owner-builder exemption — Owner-builders performing construction inside Dixon city limits
  • Building code adopted — Building construction inside Dixon city limits
  • Certificate of occupancy — Buildings and dwellings inside Dixon city limits
  • Local zoning — Land inside Dixon city limits
  • Zoning districts — Land inside Dixon city limits
12 more unanswered
  • Minimum dwelling size
  • Lot coverage
  • Building height
  • Camping on your land
  • Tiny homes
  • Accessory dwellings
  • Well permit
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Dixon publishes no rule on the point, not that none exists. Pulaski County’s page lists the county offices to call.

← All of Pulaski County: county rules, score and offices