Gideon is a city in New Madrid County, Missouri. 6 rules below are quoted from official sources and independently re-checked, most recently on November 5, 2026. Rules for unincorporated land are on the New Madrid County page.

Answers from the rulebook for Gideon

Rules another office applies inside Gideon

Gideon does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Owner-builder exemptionConditional

    Owner installation of an onsite wastewater treatment system statewide, including inside Gideon city limits where an OWTS is allowed.

    • Homeowners may install their own system only in some instances.
    • The owner must check with the local permitting authority.
    • A construction permit may be required.
    “property owners from installing, modifying or repairing their own on-site sewage disposal system”
  • Septic permitRequired

    Installation or repair of onsite wastewater systems statewide, including any qualifying system inside Gideon city limits.

    • Some single-family residential lots may be exempt.
    • The proper permitting agency must be determined for the work location.
    • A local ordinance may impose more restrictive requirements.
    • Residential properties less than three acres require a permit under the DHSS FAQ; the stated exemption does not apply in some counties.

    residential-property-area: < 3 acres (Construction permit required to install or repair an onsite system; exemption does not apply in some counties.)

    “A construction permit is required to install or repair an onsite system”
  • Septic inspectionLimited

    Inspections or evaluations of existing onsite wastewater systems in connection with real-estate transfer statewide, including inside Gideon city limits.

    • The stated noninspection practice concerns real-estate transfers.
    • A licensed inspector may be used to assess system condition.
    • Local standards can be more stringent than state regulation.
    “For the most part, local public health agencies no longer inspect existing systems related to real estate transfer.”
  • Off-grid sanitationLimited

    Off-grid onsite wastewater disposal statewide, including systems serving land inside Gideon city limits.

    • Wastewater may not be discharged into a road ditch or onto the ground.
    • The system may not pose a threat to public health or the environment.
    • Local permitting and system requirements remain unresolved for Gideon.
    “discharge into a road ditch or onto the ground? No.”
  • Permit feesVariable (with conditions)

    Onsite wastewater construction, modification, and repair permit fees statewide, including qualifying work inside Gideon city limits.

    • The stated fee suspension is effective August 28, 2026.
    • The former statutory $90 permit fee was removed.
    • Fees are on hold until new standards take effect.
    • The city-specific permitting authority remains unresolved.

    former statutory OWTS permit fee: 90 USD (Removed by changes to RSMo 701.046; fees temporarily suspended effective August 28, 2026.)

    “the application fees associated with on-site sewage disposal system construction, modifications, and repairs will be temporarily suspended.”
  • Permit processPartial

    Onsite wastewater construction-permit process statewide, including qualifying work inside Gideon city limits.

    • The process requires determining the agency with permitting authority where work is performed.
    • The application process varies by permitting authority.
    • Work must not begin until a permit is issued or the appropriate authority confirms an exemption.
    “The application process varies by permitting authority.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Gideon or New Madrid County directly.

  • Building permit — Residential building work inside Gideon city limits.
  • Building code adopted — Buildings inside Gideon city limits.
  • Inspections — Residential building work inside Gideon city limits.
  • Certificate of occupancy — Residential occupancy inside Gideon city limits.
  • Local zoning — Land inside Gideon city limits.
19 more unanswered
  • Zoning districts
  • Minimum dwelling size
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Gideon publishes no rule on the point, not that none exists. New Madrid County’s page lists the county offices to call.

← All of New Madrid County: county rules, score and offices