Zoning, building permits and septic rules in Concordia, Missouri

Concordia is a city in Lafayette County, Missouri. Concordia adopts its own zoning, so inside its limits Concordia’s rules apply, not the county’s. 7 rules below are quoted from official sources and independently re-checked, most recently on October 23, 2026. Rules for unincorporated land are on the Lafayette County page.

Answers from the rulebook for Concordia

Concordia’s own rules

  • Building permitRequired

    New construction, additions and structural alterations of buildings inside Concordia city limits.

    • Permit is issued by the building official after plan review, zoning compliance and payment of fees.
    • Building without a permit is a violation; failure to obtain a permit may result in a double permit fee and removal of construction.
    • General contractors and subcontractors must hold a current city business license before work on a building project; electricians, plumbers and HVAC technicians must hold city trade licenses.
    “no building or structure shall be erected, added to or structurally altered until a permit has been issued by the building official.”
  • InspectionsRequired

    Permitted building work inside Concordia city limits, inspected by the city building inspector.

    • Required inspections include footings, foundation walls, basement floor, rough-in carpentry, electrical, plumbing and mechanical rough-ins, insulation, and a final inspection before occupancy.
    • Inspection requests must be called in with the permit number and site address; requests received by 3:00 p.m. are assigned for the next day.
    • Reinspection fee of $100.00 per reinspection after the first reinspection.

    reinspection fee: 100 USD (per reinspection after the first (1st) reinspection)

    “the following inspections will be made by the building inspector.”
  • Certificate of occupancyRequired

    Buildings inside Concordia city limits before occupancy.

    • Occupancy requires a final inspection and certificate of occupancy; final inspection occurs after life-safety items are completed and before the building is occupied.
    “no occupancy will be allowed without a final inspection and certificate of occupancy.”
  • Local zoningPresent (with conditions)

    Land inside Concordia city limits: the city's own zoning code is in its adopted code of ordinances (Title IV, Chapter 405 Zoning Regulations) and the building official checks zoning before issuing permits.

    • Building permits are issued only when the setbacks and use comply with the city's zoning ordinance; a permit may issue otherwise only upon a decision by the board of zoning adjustment.
    • Chapter 405 was not opened; its district rules and numeric limits are not verified here.
    “chapter 405 zoning regulations (section 405.010 – section 405.1020)”
  • Subdividing landRegulated (with conditions)

    Division of land into lots inside Concordia city limits.

    • Chapter 410 Subdivision Regulations (section 410.010 to 410.400) governs subdivisions; its requirements were not read.
    “chapter 410 subdivision regulations (section 410.010 – section 410.400)”
  • Permit feesVariable (with conditions)

    Building permit fees for new residential construction inside Concordia city limits.

    • Fee is set on a cost-per-square-foot basis from BOCA rates adjusted semi-annually, plus a city administrative modifier of .005.
    • Remodel, rehabilitation and accessory building fees, and plumbing, electrical and HVAC fees, are set in chapter 150, table B of title I (not read).
    • Water and sewer tap fees are set by separate ordinances (not read); all permit fees, tap fees and trade fees must be paid before the building permit is issued.

    city administrative modifier, new residential: 0.005 multiplier (applied to BOCA cost per square foot)

    “cost per square foot and type of construction modifier will be established semi-annually by boca.”
  • Permit processPublished (with conditions)

    Applying for a building permit inside Concordia city limits.

    • Applications use the city's building permit packet and must include drawings; the building official reviews them.
    • Single-family and duplex plan review normally takes three days; commercial review takes two to three weeks.
    • Permit issues only after plan review passes, zoning setbacks and use comply, and fees are received by the city clerk.
    • Contractors must be listed on the application; general contractor, electrician, plumber, mechanical contractor, surveyor, excavator and foundation contractor are mandatory listings.

    single-family/duplex plan review time: 3 days (normal review time)

    “review of applications for single-family and duplex construction normally takes three (3) days.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Concordia or Lafayette County directly.

  • Owner-builder exemption — Owner-built construction inside Concordia city limits.
  • Zoning districts — Zoning district map and district list for land inside Concordia city limits.
  • Minimum dwelling size — Minimum floor area for a single-family dwelling inside Concordia city limits (main single-family residential district).
  • Minimum lot size — Minimum lot area for the main single-family residential district inside Concordia city limits.
  • Setbacks — Front, side and rear setbacks in the main single-family residential district inside Concordia city limits.
17 more unanswered
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Concordia publishes no rule on the point, not that none exists. Lafayette County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Concordia means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

← All of Lafayette County: county rules, score and offices