Jasper County, Missouri
Town of Fidelity is a town in Jasper County, Missouri. Septic permits inside Town of Fidelity come from Jasper County. 6 rules below are quoted from official sources and independently re-checked, most recently on November 5, 2026. Rules for unincorporated land are on the Jasper County page.
Town of Fidelity does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Residential or commercial construction inside Fidelity town limits, unless Fidelity is a political jurisdiction that issues building permits meeting the stated state and county minimum requirements.
building permit fee: 50 USD
“Any person wishing to establish a residence or commercial facility to include any commercial or private use of any above or below ground structure on property located within Jasper County shall apply to the County for a Building Permit except for property within political jurisdictions which issue building permits within the minimum requirements of all State and County requirements for the issuing of building permits.”
Lots proposed for onsite wastewater systems inside Fidelity town limits where the Jasper County ordinance applies; this is a septic-system standard, not a Fidelity zoning-district standard.
minimum lot size per onsite wastewater system: >= 0.92 acres (lots platted and recorded or approved by DNR after May 6, 1999)
“Install an onsite wastewater system on a lot that is smaller than ninety-two hundredths (.92) of an acre. Applies to lots platted and recorded or approved by the Department of Natural Resources after May 6, 1999.”
Onsite wastewater systems inside Fidelity town limits where Fidelity does not have an equivalent local code exempting the system from the Jasper County ordinance.
“A written authorization issued by the Jasper County Health Department which authorizes the permittee to construct, install, modify or operate a wastewater facility as set forth in this ordinance.”
Construction, modification, repair, or operation of an onsite sewage-treatment system inside Fidelity town limits where the Jasper County ordinance applies.
new system permit fee: 150 USD · repair permit fee: 50 USD
“Construct, modify, repair or operate any sewage treatment system without an On-site Sewage Treatment System Permit issued by Jasper County.”
Living, working, or assembling inside Fidelity town limits where the Jasper County wastewater ordinance applies.
duration: >= 6 hours (building occupancy or public gathering)
“Live, work or assemble in any building or assemble at any public gathering six (6) or more hours in duration where sanitary disposal of all human wastes and domestic sewage is not provided by methods or device approved by the department. It shall be the responsibility of the property owner to comply with this section.”
County onsite-wastewater permit process inside Fidelity town limits where the Jasper County ordinance applies.
typical approval time: 3 to 5 days (after permits are turned into the county office)
“Once the soil profile is obtained a wastewater permit should be filled out with a sketch plan of the entire septic system.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Fidelity or Jasper County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Fidelity publishes no rule on the point, not that none exists. Jasper County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Fidelity means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.