Union, Missouri requires city building permits for new structures and structural work, and the city administers its own zoning.12 In Franklin County, Union’s city building office is the starting point for construction inside city limits; we could not confirm which office issues septic permits for a Union address, so ask the city and Franklin County Building Department before planning private sewage disposal.13
At a glance
- Building permits
- City building permits required for new structures and structural work1
- Zoning
- Union has its own zoning code2
- Residential lot size
- R-1: 12,000 square feet; R-2: 7,500 square feet45
- Building permit fees
- Residential project cost multiplied by 0.0035, plus a $25 administrative fee6
- Floodplain work
- Additional city floodplain permit; $100 special permit fee7
- Septic permits
- City-address authority unconfirmed; ask the city and county building offices13
Who to call
Building permits
City of Union Building & Engineering Department
City building permits, plan review and inspections; starting point for city zoning and floodplain questions
10 E. Locust Street - Union, MO 63084
Septic permits
Franklin County Building Department
County on-site sewage program contact; confirm jurisdiction for a Union city address before applying
Contact details are copied from each office’s official page and were checked against it on October 12, 2026.
Off-grid gear
Going off-grid in Union means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Union, MO?
Union requires a city building permit for work creating a new structure or affecting an existing building’s structure or structural supports, including projects such as decks, sheds, garages and swimming pools.1 Union adopts the International Building Code, 2021 Edition, with local changes.8 Report the proposed project to Union’s Building & Engineering Department before work begins: the city’s residential guidance says construction cannot commence until a building permit has been acquired.1 We could not confirm a city owner-builder exemption; ask the building office about your proposed work rather than assuming doing the labor yourself removes the building-permit requirement.1
Who issues building permits in Union, and what do they cost?
Union’s Building & Engineering Department handles city construction applications and inspections; use the city office for a project inside Union city limits.1 Union’s residential building-permit calculation uses total project cost multiplied by 0.0035, and the residential administrative fee is $25 and non-refundable.6 Water and sewer fees are separate from building fees, although the city adds them to the building permit payment for new construction needing hookups.1 Union requires 24 hours’ notice for building inspections, so arrange inspections with the building office as construction progresses.1
Does Union have zoning, lot-size rules and setbacks?
Union administers its own zoning code, so establish the parcel’s district before deciding what home will fit.2 For single-family dwellings in Union’s R-1 district, minimum lot area is 12,000 square feet and minimum width at the established building line is 90 feet.4 In Union’s R-2 district, the corresponding minimums are 7,500 square feet and 65 feet.5 Union’s R-2 front yard must be at least 25 feet, including along every street on a lot with multiple frontage; the side yard must be at least 10% of lot width and no less than 8 feet.9 Ask the city to check your plot plan against the parcel’s actual district before purchasing a house design.1
How do septic permits work inside Union?
We could not confirm the septic-permit authority for land inside Union; ask Union’s Building & Engineering Department and Franklin County Building Department to identify the responsible office for the exact address.13 Missouri requires a construction permit before installing or repairing most onsite wastewater systems, although some single-family residential lots may be exempt; work should wait until a septic permit is issued or an exemption is confirmed.10 Union’s building guidance treats water and sewer hookups as separate charges from the building permit.1 Resolve sewer availability and whether private sewage disposal is acceptable with the city before committing to a septic design.1
Can you live in an RV or tiny home in Union?
We could not confirm residential RV occupancy, temporary camping, tiny-home occupancy or a minimum dwelling floor area inside Union; ask the city building office about the proposed use and the parcel’s zoning before buying a unit or moving onto the land.1 Union has a zoning code, and city building permits are issued only when other regulations and zoning restrictions are satisfied.21 Union’s residential district lot-area rules describe the lot, rather than establishing a tiny home’s minimum interior floor area.45 Request an answer for your specific dwelling and occupancy plan.
Building a home in Union: what should you do first?
Start with Union’s Building & Engineering Department and resolve the parcel’s zoning and proposed use before submitting the construction application; city building-permit issuance depends on compliance with zoning and other regulations.1 Next, prepare a plot plan showing lot dimensions and proposed development distances to property lines, plus 2 sets of detailed drawings.1 Submit the building-permit application with those plans and estimated construction cost, then obtain the building permit before starting construction.1 Arrange required inspections with advance notice and ask about the final and occupancy inspection.1 For floodplain work in Union, obtain the additional city floodplain permit, whose special permit fee is $100.7 For land outside Union city limits, use the Franklin County guide: county zoning applies to unincorporated land.11
Watch-outs
- Union floodplain work requires a special city floodplain permit in addition to any building, right-of-way or other required permit.7
- We could not confirm a Union owner-builder or agricultural building exemption; ask the city building office before treating either as exempt.1
- We could not confirm Union’s sewer-connection requirement or septic jurisdiction for a city address; settle both with the city and county building offices before buying land for private sewage disposal.13
Sources
- City of Union Building & Engineering Department (unionmissouri.gov)
- Table of Contents - City of Union, MO (Union), quoted and re-checked
- Franklin County Building Department (franklinmo.gov)
- City of Union, MO Single-Family Dwelling Districts (Union), quoted and re-checked
- Article V: "R-2" Single-Family Dwelling District (Union), quoted and re-checked
- Article III: Fees - City of Union, MO (Union), quoted and re-checked
- Article III: Fees - City of Union, MO (Union), quoted and re-checked
- Article I: Adoption of Building Codes - City of Union, MO (Union), quoted and re-checked
- Article V: "R-2" Single-Family Dwelling District (Union), quoted and re-checked
- OWTS Construction Permit Process (Missouri statewide rule), quoted and re-checked
- Planning & Zoning Department, quoted and re-checked
Written October 12, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.