Wright County, Minnesota
Waverly is a city in Wright County, Minnesota. Waverly adopts its own zoning, so inside its limits Waverly’s rules apply, not the county’s. 14 rules below are quoted from official sources and independently re-checked, most recently on November 5, 2026. Rules for unincorporated land are on the Wright County page.
Building projects on city-limit parcels identified by PID numbers starting with 116.
“In the case of building projects, our building inspector will approve the project, assign the fees and then inspect the project after it is completed.”
Buildings and structures erected inside Waverly city limits.
“No building or structure hereafter erected shall be occupied or used in whole or in part until a certificate of occupancy is issued”
Land inside Waverly city limits.
“These new ordinances are in effect as of 10/14/2025.”
Land inside Waverly city limits.
“The following district classifications are hereby established within the jurisdiction of this chapter:”
Manufactured homes inside Waverly city limits.
“Use Type Manufactured Homes | P | P | P | P | | | | |”
Agricultural fences in Waverly's Agricultural and Rural Residential Districts.
“except agricultural fences in the Agricultural and Rural Residential Districts shall not require a building permit.”
Plats and subdivisions inside Waverly city limits.
“P and Z is responsible for making recommendations to the City Council involving plat approvals”
Building-permit applicants inside Waverly city limits.
“Each applicant shall pay the required fees as established by the City Council's resolution at the time of application.”
Building and site-permit applications inside Waverly city limits.
“Building Permit Applications must be made to the Building Official on forms furnished by the Zoning Administrator's office.”
Waverly does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Single-family homes in the R-1 Legacy Residential District inside Waverly city limits.
minimum lot area: 10000 square feet (single-family homes) · minimum lot width: 50 feet (at the public right-of-way line) · minimum lot depth: 150 feet
“153.5.3 LOT REQUIREMENTS. Minimum Area | 10,000 square feet for single family homes 5,000 square feet for two-family homes”
Single-family homes in the R-1 Legacy Residential District inside Waverly city limits.
side yard setback: 10 feet · rear yard setback: 30 feet
“153.5.3 LOT REQUIREMENTS. Side Yard Setback | 10 feet 153.5.3 LOT REQUIREMENTS. Rear Yard Setback | 30 feet”
Residential buildings in the R-1 Legacy Residential District inside Waverly city limits.
maximum height: 35 feet (residential buildings)
“153.5.3 LOT REQUIREMENTS. Maximum Height: | 35 feet for residential buildings”
New recreational-vehicle parks or campgrounds in any Waverly floodplain district.
“New recreational vehicle parks or campgrounds and expansions to existing recreational vehicle parks or campgrounds are prohibited in any floodplain district.”
Development in Waverly floodplain districts.
“Permit Required. A permit must be obtained from the Zoning Administrator to verify compliance with all applicable standards outlined in this ordinance”
We looked and could not find an official answer yet. Silence is not permission; ask Waverly or Wright County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Waverly publishes no rule on the point, not that none exists. Wright County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Waverly means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.