Zoning, building permits and septic rules in Pine Springs, Minnesota

Pine Springs is a city in Washington County, Minnesota. Pine Springs adopts its own zoning, so inside its limits Pine Springs’s rules apply, not the county’s. Septic permits inside Pine Springs come from Washington County (Washington County Public Health and Environment - Septic (SSTS) · 651-430-6655). 14 rules below are quoted from official sources and independently re-checked, most recently on November 5, 2026. Rules for unincorporated land are on the Washington County page.

Answers from the rulebook for Pine Springs

Pine Springs’s own rules

  • Building permitRequired

    Erection, construction, enlargement, alteration, repair, movement, improvement, removal, conversion, or demolition of buildings or structures inside Pine Springs city limits.

    • Mechanical, plumbing, or electrical permits may additionally be required.
    • Work in an application may not begin until fee payment, approval, and permit issuance.
    “The City of Pine Springs requires building permits. Building permits and accompanying inspections are required in order to erect, construct, enlarge, alter, repair, move, improve, remove, convert or demolish any building, structure, or portion thereof.”
  • Building code adoptedAdopted (with conditions)

    Buildings and structures to which the State Building Code is applicable inside Pine Springs city limits.

    “The State Building Code, as adopted by the City of Pine Springs, governs the construction, reconstruction, alteration, and repair of buildings and other structures to which the code is applicable.”
  • InspectionsRequired

    Permitted building work inside Pine Springs city limits.

    • Construction may not proceed beyond indicated inspection stages without prior written Building Inspector approval.
    • Final inspection occurs when construction is complete and before occupancy.
    “Construction work must not proceed beyond the stages indicated for each inspection without prior written approval from the Building Inspector.”
  • Local zoningPresent (with conditions)

    Land inside Pine Springs city limits.

    • City Code page identifies Ordinance 17 as establishing zoning regulations.
    “Zoning Districts and District Regulations [...] Zoning Code · Zoning Code - Land Use, Building, and Permit Regulations [...] ORD.17 · Establishes Zoning Regulations”
  • Zoning districtsPublished (with conditions)

    Land inside Pine Springs city limits.

    • Detailed district schedule requires review of the City-hosted zoning-code PDF.
    “Zoning Districts and District Regulations [...] Zoning Code · Zoning Code - Land Use, Building, and Permit Regulations”
  • SetbacksSpecified

    The vast majority of building cases inside Pine Springs city limits.

    • List is not inclusive.
    • No structures may be built on utility, pipeline, or roadway easements.
    • Additional zoning, SSTS, and pipeline rules apply.

    street setback: 40 feet · internal lot-line setback: 20 feet · rear setback: 50 feet

    “For the vast majority of cases, the setback requirement is: [...] 40 feet from the street [...] 20 feet from an internal lot line [...] 50 feet from the back of the lot”
  • Building heightSpecified

    The vast majority of structures inside Pine Springs city limits.

    • The City states the general setback list is not inclusive and refers to additional zoning and other regulations.

    maximum structure height: <= 35 feet

    “For the vast majority of cases, the setback requirement is: [...] 35 feet maximum height for any structure”
  • Subdividing landRegulated (with conditions)

    Platting and subdivision inside Pine Springs city limits.

    “ORD.18 · Establishes Platting and Subdivision Regulations”
  • Driveway accessRequired

    New driveways or changes in driveway location inside Pine Springs city limits.

    • A County access permit is also required if the driveway is on a County road.
    “A permit is required whenever a new driveway or a change in driveway location is proposed. A driveway access permit application can be found here. If located on a County road, then a County access permit is required.”
  • Permit feesPublished (with conditions)

    City permit applications inside Pine Springs city limits.

    • The page directs users to the current fee schedule under City Code.
    “To view the current fee schedule, go to the main menu “City Documents”, ”City Code” page and view the schedule there under the General Provisions section.”
  • Permit processPublished (with conditions)

    Building permit applications inside Pine Springs city limits.

    • Completed packet is submitted to the City building-official website.
    • Review may require a plan-review fee or City Council or Planning Commission review.
    • Approved work must commence within 180 days unless a 60-day extension is approved and be completed within one year unless a one-year extension is approved.
    “Submit your completed application packet (application form, plans, other required documents) to the City building official website as directed above.”

Rules another office applies inside Pine Springs

Pine Springs does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Who permits septicCounty (with conditions)

    On-site septic systems inside Pine Springs city limits.

    • Washington County implements the SSTS ordinance in Pine Springs.
    “Washington County is responsible for implementing the ordinance in the City of Pine Springs, including requirements for compliance inspections of existing systems, permitting and inspection of new and replacement systems, site review, maintenance requirements, and operating permits for Type IV Advanced Sewage Treatment Systems.”
  • Septic permitRequired

    Septic-system installation or maintenance inside Pine Springs city limits.

    • Permits must be initiated with and processed through Washington County and Pine Springs.
    “The City requires permits for: [...] septic system installation/maintenance [...] Septic permits must be initiated with and processed through Washington County and the City of Pine Springs.”
  • Septic inspectionRequired

    On-site septic systems inside Pine Springs city limits.

    • Systems must be pumped and inspected by professionals at least once every three years.
    • County implementation includes inspections of new and replacement systems and compliance inspections of existing systems.

    inspection interval: per 3 years

    “To this end, the City is partnered with the Washington County Health Department to require that all on-site septic systems are pumped and inspected by professionals at least once every three years.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Pine Springs or Washington County directly.

  • Owner-builder exemption — Owner-built residential construction inside Pine Springs city limits.
  • Certificate of occupancy — Occupancy of buildings inside Pine Springs city limits.
  • Minimum dwelling size — Dwellings inside Pine Springs city limits.
  • Minimum lot size — Lots inside Pine Springs city limits.
  • Lot coverage — Lots inside Pine Springs city limits.
11 more unanswered
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Pine Springs publishes no rule on the point, not that none exists. Washington County’s page lists the county offices to call.