Washington County, Minnesota
Dellwood is a city in Washington County, Minnesota. 8 rules below are quoted from official sources and independently re-checked, most recently on November 4, 2026. Rules for unincorporated land are on the Washington County page.
Buildings and structures within Dellwood city limits to which the state building code applies.
“The Minnesota State Building Code, as adopted by the Commissioner of Labor and Industry pursuant to Minnesota Statutes Chapter 326B, including all amendments, rules and regulations established, adopted and published from time to time by the Commissioner of Labor and Industry, through the Building Codes and Standards Division is hereby adopted by reference with the exception of the optional chapters, unless specifically adopted by this Ordinance.”
A building or structure, or a portion thereof, before use, occupancy, or a change in occupancy classification inside Dellwood city limits.
“No building or structure may be used or occupied, and no change in the existing occupancy classification of a building or structure or portion of a building or structure may be made until the building official has issued a certificate of occupancy for it as provided in the State Building Code Chapter 1305.1000.”
Structures inside Dellwood city limits.
front lot line setback: 40 feet · rear lot line setback: 40 feet · side lot line setback: 30 feet
“Structures | 40 feet from front Lot line 40 feet from rear Lot line 30 feet from side Lot line”
Construction of a private wastewater disposal system inside Dellwood city limits.
“Prior to commencement of construction of a private wastewater disposal system, the owner shall first obtain a written permit signed by the city. The application for the permit shall be made on a form furnished by the city, which the applicant shall supplement by any plans, specifications and other information as are deemed necessary to the city.”
Permitted private wastewater disposal-system installations inside Dellwood city limits.
final-inspection response time: <= 72 hours (After receipt of notice from the applicant.)
“A permit for a private wastewater disposal system shall not become effective until the installation is completed to the satisfaction of the city or its authorized representative. The city or its representative shall be allowed to inspect the work at any stage of construction, and in any event, the applicant for the permit shall notify the city when work is ready for final inspection, and before any underground portions are covered. The inspection shall be made within 72 hours of the receipt of notice.”
A sewer connection where public sewer is not available inside Dellwood city limits.
“The sewer shall be connected to a private wastewater disposal system complying with the provisions of this Ordinance and Minn. Rules Ch. 7080 through 7083 Individual Sewage Treatment Systems, as they may be amended from time to time.”
City permits and land-use applications inside Dellwood city limits.
building permits: On Valuation · septic permit: 800 USD · zoning permit: 75 USD (Including pool permit in § 153.04.)
“Building Permits | On Valuation [...] Septic Permit | $800.00 [...] Zoning Permit (including Pool Permit in Section 153.04) | $75.00”
Applications submitted to the City of Dellwood.
“Completed applications may be submitted in person at City Hall, or emailed to cityhall@dellwood.us. To remit payment for any fees associated with the application, you may mail a check to City Hall or pay for it in person.”
We looked and could not find an official answer yet. Silence is not permission; ask Dellwood or Washington County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Dellwood publishes no rule on the point, not that none exists. Washington County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Dellwood means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.