Todd County, Minnesota

Zoning, building permits and septic rules in Grey Eagle, Minnesota

Grey Eagle is a city in Todd County, Minnesota. Grey Eagle adopts its own zoning, so inside its limits Grey Eagle’s rules apply, not the county’s. Septic permits inside Grey Eagle come from Grey Eagle. 13 rules below are quoted from official sources and independently re-checked, most recently on November 5, 2026. Rules for unincorporated land are on the Todd County page.

Answers from the rulebook for Grey Eagle

Grey Eagle’s own rules

  • Building permitRequired

    Buildings and structures inside Grey Eagle city limits.

    • A permit is required before the enumerated building work; the City FAQ states permits are not required for replacement siding or shingles unless size changes because of added structures or awnings.
    “Building permits are required for anything new being added to the exterior of your property.”
  • InspectionsLimited

    Buildings inside Grey Eagle city limits where the City has reason to believe state or local laws or ordinances have been or are being violated.

    • Inspections are during reasonable daylight hours.
    • Except for an emergency, the owner, operator, manager, representative or local agent and affected occupant receive at least five business days' written notice before an inspection.
    “The City, through its adopted agents or employees, shall administer and enforce the provisions of this Chapter and are authorized to cause inspections on a scheduled basis for any building when reason exists to believe that a violation of State or local laws and ordinances have been or are being committed.”
  • Local zoningPresent (with conditions)

    Land inside Grey Eagle city limits, Todd County, Minnesota.

    • The City publishes Chapter 13, titled Planning and Zoning; the available chapter contains subdivision and manufactured-home regulations.
    “Chapter 13 - Planning and Zoning Chapter 14 - Housing and Building Code”
  • Minimum dwelling sizeSpecified

    Manufactured homes inside Grey Eagle city limits.

    • Applies to manufactured homes; garages, entryways, and other attachments are excluded.

    ground-floor space: >= 850 square feet (Exclusive of garages, entryways, and other attachments to the home.)

    “The manufactured home shall have ground floor space of not less than 850 square feet, exclusive of garages, entryways, and other attachments to the home;”
  • SetbacksSpecified

    Buildings and structures subject to a City building permit inside Grey Eagle city limits.

    • If there is no pavement, the front distance is measured from the roadway edge as determined by the City.

    rear setback: >= 5 feet · side setback: >= 5 feet · front setback: >= 25 feet (Measured from pavement edge; if no pavement, from roadway edge as City determines.)

    “(A) Five feet from the rear property line; (B) Five feet from any side property line; and (C) Twenty-five feet from the edge of the pavement on the front of the property.”
  • Manufactured homesLimited

    Manufactured homes inside Grey Eagle city limits.

    • Homes must conform with state law and City standards, including a minimum 850 square feet of ground-floor space, one-family design, a minimum 70-foot lot width, and minimum 14-foot width.
    • New manufactured homes must be inspected by a building inspector and meet any state building code for manufactured homes.
    • A manufactured home more than 10 years old may not be moved into the City unless Council-approved.

    manufactured-home ground-floor space: >= 850 square feet (Excludes garages, entryways, and other attachments to the home.) · lot width: >= 70 feet · manufactured-home width: >= 14 feet (Measured at its narrowest point from the face of exterior walls.)

    “Only manufactured homes designed, built, and constructed in conformance with state law and this Ordinance are permitted and are subject to the additional following standards:”
  • Who permits septicLocal (with conditions)

    Individual treatment systems and public-sewer connections inside Grey Eagle city limits.

    • Where public sanitary sewer is unavailable, the private wastewater-disposal system must comply with rules and regulations of Minnesota or another government agency.
    “No person shall install an individual treatment system, connect to the public sewer system, or make a repair or alteration to the public sewer system without obtaining a permit from the City.”
  • Septic permitRequired

    Installation of an individual treatment system, public-sewer connection, or repair or alteration to the public sewer system inside Grey Eagle city limits.

    • The application must provide the Administrator with a correct legal description, proposed-system or connection plans, and the name of the person or firm doing the work.
    “No person shall install an individual treatment system, connect to the public sewer system, or make a repair or alteration to the public sewer system without obtaining a permit from the City.”
  • Off-grid sanitationLimited

    Sanitation for buildings inside Grey Eagle city limits where public sanitary sewer is not available.

    • Private wastewater disposal is allowed only where public sanitary sewer is unavailable and must comply with state or other-government rules.
    • It is otherwise unlawful to construct or maintain a privy, privy vault, septic tank, cesspool, or other sewage-disposal facility, except as provided.
    “Where a public sanitary sewer is not available, the building sewer shall be connected to a private wastewater disposal system complying with the rules and regulations of the State of Minnesota or other government agency.”
  • Mandatory utility hookupWater and sewer (with conditions)

    Improved property and new buildings inside Grey Eagle city limits served by City water or adjacent to public sewer.

    • Any improved property must have a separate water service connection; existing unconnected improved property must connect before a sale or transfer, or within 180 days if weather or soil conditions do not permit connection beforehand.
    • A property must connect to public sewer within 90 days after sewer becomes operational only if it abuts a street, alley, or utility easement along which sewer mains have been constructed.
    • Future buildings on property adjacent to public sewer must connect immediately; where sewer is unavailable, the building sewer must connect to a private wastewater-disposal system complying with state or other-government rules.

    water connection after sale or transfer where weather or soil conditions prevent prior connection: <= 180 days · sewer connection after public sewer operational: <= 90 days (Property abuts a street, alley, or utility easement along which sewer mains have been constructed.)

    “Any improved property not presently connected to the water system must be connected upon sale or transfer of any legal interest in the property. The connection must be made prior to the sale or transfer, unless weather or soil conditions do not permit, and in such case must be made within 180 days of the date of sale or transfer.”
  • Subdividing landRegulated (with conditions)

    Subdivision of real property inside Grey Eagle city limits.

    • The applicant submits four preliminary-plat copies prepared by a registered land surveyor.
    • The Council reviews the plat and holds a public hearing; after approval, the final plat must be executed, supplied to the Administrator, and filed with the County Recorder.
    • Required easements are at least 10 feet wide; water or sewer easements are at least 20 feet wide.

    general utility easement width: >= 10 feet · water or sewer easement width: >= 20 feet

    “No real property within the City shall be subdivided until a plat has been approved by the Council and filed with the office of the County Recorder.”
  • Driveway accessRequired

    Paving or cementing a gravel driveway on property inside Grey Eagle city limits.

    • The City FAQ lists paving or cementing a gravel driveway among exterior additions requiring a building permit.
    “This would include the following: storage shed, fence, paving/cementing a gravel driveway, deck, patio, etc.”
  • Permit feesVariable (with conditions)

    Work governed by Grey Eagle City Code Chapter 14.

    • Fees are assessed according to a fee schedule adopted by City resolution; the schedule and dollar amounts were not located in the opened materials.
    “Permit fees shall be assessed for work governed by this Code in accordance with the fee schedule adopted by the City pursuant to resolution.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Grey Eagle or Todd County directly.

  • Owner-builder exemption — Owner-built residential construction inside Grey Eagle city limits.
  • Building code adopted — Building-code adoption for construction inside Grey Eagle city limits.
  • Certificate of occupancy — New or altered buildings inside Grey Eagle city limits.
  • Zoning districts — Zoning districts inside Grey Eagle city limits.
  • Minimum lot size — Residential lots inside Grey Eagle city limits.
11 more unanswered
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Accessory dwellings
  • Septic inspection
  • Well permit
  • Agricultural exemption
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Grey Eagle publishes no rule on the point, not that none exists. Todd County’s page lists the county offices to call.