Todd County, Minnesota
Clarissa is a city in Todd County, Minnesota. Clarissa adopts its own zoning, so inside its limits Clarissa’s rules apply, not the county’s. Septic permits inside Clarissa come from Clarissa. 15 rules below are quoted from official sources and independently re-checked, most recently on November 4, 2026. Rules for unincorporated land are on the Todd County page.
Erecting, constructing, altering, rebuilding, or moving a building, dwelling, or structure in or into Clarissa city.
“It shall be unlawful for any person, group of persons or corporation to erect, construct, alter, rebuild or move any building, dwelling or structure in or into the city without first having received a permit therefore from the City Council.”
Land inside Clarissa city limits.
“City of Clarissa Zoning Ordinance Click this link to download a file of the current City of Clarissa Zoning Ordinance.”
Zoning information published by Clarissa city for land inside city limits.
“The Flood Plain Zoning District shall be considered an overlay zoning district to all existing land use regulations of the community.”
Recreational vehicles, tent trailers, manufactured homes, or other mobile homes parked in a Clarissa city park.
maximum park duration without City Council permission: <= 14 days per year (Permission from the City Council is required for a longer period.)
“No person shall camp in the park or park any recreational vehicle, tent trailer, manufactured home or other mobile home for longer than 14 days per year without permission of the City Council.”
Camping in a Clarissa city park.
maximum park camping duration without City Council permission: <= 14 days per year (Permission from the City Council is required for a longer period.)
“No person shall camp in the park or park any recreational vehicle, tent trailer, manufactured home or other mobile home for longer than 14 days per year without permission of the City Council.”
New or replacement manufactured homes inside Clarissa's Flood Plain District.
“New manufactured homes, replacement manufactured homes and certain travel trailers and travel vehicles are subject to the general provisions of this chapter and specifically §§ 152.25 through 152.27 and 152.30.”
Private wastewater disposal systems inside Clarissa city where a public sewer is not available under § 51.018.
“Prior to commence of construction of a private wastewater disposal system, the owner shall first obtain a written permit signed by the city.”
Construction of a private wastewater disposal system inside Clarissa city where a public sewer is not available under § 51.018.
“Prior to commence of construction of a private wastewater disposal system, the owner shall first obtain a written permit signed by the city.”
Permitted private wastewater disposal systems inside Clarissa city.
inspection response time: <= 24 hours (After receipt of the applicant's notice that work is ready for final inspection.)
“The city or its representative shall be allowed to inspect the work at any stage of construction, and in any event, the applicant for the permit shall notify the city when work is ready for final inspection, and before any underground portions are covered. The inspection shall be made within 24 hours of the receipt of notice.”
Private wastewater disposal inside Clarissa city when public sewer is not available under § 51.018.
“Where a public sewer is not available under the provisions of § 51.018, the building sewer shall be connected to a private wastewater disposal system complying with the provisions of this subchapter.”
Properties inside Clarissa city that discharge wastewater and are adjacent to a street, alley, or right-of-way containing a public city sanitary sewer.
public-sewer distance: <= 200 feet (Measured from the structure generating wastewater.) · connection deadline after sewer operation: <= 365 days (For qualifying existing properties.)
“service connection to the public sewer in accordance with provisions of this code within 365 days of the date the public sewer is operational; provided, the public sewer is within 200 feet of the structure generating the wastewater.”
Subdivision and manufactured-home-park development in Clarissa's Flood Plain District.
“No land shall be subdivided and no manufactured home park shall be developed or expanded where the site is determined to be unsuitable by the City Council for reason of flooding, inadequate drainage, water supply or sewage treatment facilities.”
Construction, additions, alterations, use changes, excavation, or obstruction placement within Clarissa's Flood Plain District.
“A permit issued by the City Administrator shall be secured prior to the construction, addition or alteration of any building or structure; prior to the use or change of use of a building, structure or land; prior to the change or extension of a nonconforming use; and prior to excavation or the placement of an obstruction within the flood plain.”
Land-use permits issued by Clarissa City Council under § 150.01.
“The fee shall be as established from time to time by resolution of the City Council.”
Land-use permits for erection, construction, alteration, rebuilding, or moving structures inside Clarissa city.
“The City Council may extend the time for completion for up to an additional six months upon written request of the permittee establishing that circumstances beyond the permittee’s control prevented completion of the work for which the permit was or should have been issued.”
We looked and could not find an official answer yet. Silence is not permission; ask Clarissa or Todd County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Clarissa publishes no rule on the point, not that none exists. Todd County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Clarissa means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.