St. Louis County, Minnesota
Tower is a city in St. Louis County, Minnesota. Tower adopts its own zoning, so inside its limits Tower’s rules apply, not the county’s. 12 rules below are quoted from official sources and independently re-checked, most recently on November 5, 2026. Rules for unincorporated land are on the St. Louis County page.
Erection, reconstruction, movement, or structural alteration increasing a structure's exterior dimensions, height, or floor area inside Tower city limits.
work-start deadline: <= 6 months (After issuance; otherwise the land-use permit becomes void.) · completion deadline: <= 1 year (After issuance; otherwise further work requires a new permit.)
“No building structure shall be erected, reconstructed, moved, or structurally altered to increase the exterior dimensions, height or floor area of a structure without a land use permit that is requested of and obtained from the Zoning Administrator or other authorized official.”
Land inside the City of Tower, Minnesota.
“An ordinance establishing comprehensive zoning regulations fore the City of Tower”
Official zoning districts inside Tower city limits.
“For the purposes of this ordinance the City of Tower is divided into zoning districts as shown on the official zoning map which is hereby incorporated by reference and declared a part of this ordinance.”
Use of travel trailers or motor homes by transient or permanent guests for lodging or sleeping in any residential area inside Tower city limits.
stored unoccupied recreational trailer or motor-home maximum length: <= 24 feet (May be stored in a building or open space in the property owner's rear yard.)
“No person shall maintain, install, erect, or permit, in any residential area, the parking of travel trailers or motor homes for the use of transient or permanent guests for lodging or sleeping.”
Private septic and well systems inside Tower city limits where municipal sanitary and water utilities are unavailable.
“If not available, the Zoning Administrator shall require that private wells and septic systems shall conform to the requirements of the St. Louis County code for septic and well construction.”
Properties in a Tower zoning district where municipal sanitary and water utilities are available.
“In any district where sanitary and water utilities are available, these facilities shall be used.”
Subdivision plats and land development inside Tower city limits.
“The following regulations shall be known and may be cited and referred as the Subdivision regulations of the City of Tower.”
Construction or removal of driveways inside Tower city limits.
“Where the proposed driveway is to be constructed so that it opens onto any street designated as either a State of Minnesota, Saint Louis County or U.S. Trunk Highway, all additional specifications of the appropriate highway departments will apply, and the required permits shall be obtained from the appropriate departments.”
Tower land-use permit applications.
“Land use permits shall contain the following information where applicable:”
Tower does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
One-family dwellings in Tower's R-1 Residential District.
front-yard setback: >= 30 feet (One-family use in R-1.) · rear-yard setback: >= 30 feet (One-family use in R-1.) · minimum side-yard setback: >= 10 feet (One-family use in R-1.) · total side-yard setback: >= 20 feet (One-family use in R-1.)
“One Family 20,000 20,000 30’ 30’ 10’ 20’”
Lots in Tower's R-1 Residential District.
maximum lot coverage: <= 35 percent (Includes main structure and auxiliary buildings.)
“Lot coverage shall not exceed thirty five (35) per cent. Such coverage includes the main structure and auxiliary buildings.”
Residential buildings in Tower's R-1 Residential District.
maximum residential building height: <= 36 feet (Or 2.5 stories; churches, schools, and PUDs may be up to 48 feet.) · maximum height for stated exception: <= 48 feet (Churches, schools, or PUDs.)
“No residential building erected or altered shall exceed thirty six (36) feet or two and one half (2 ½) stories excepting churches, schools, or PUDS which may be erected to a maximum height of forty eight (48) feet.”
We looked and could not find an official answer yet. Silence is not permission; ask Tower or St. Louis County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Tower publishes no rule on the point, not that none exists. St. Louis County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Tower means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.