St. Louis County, Minnesota
Rice Lake is a city in St. Louis County, Minnesota. Rice Lake adopts its own zoning, so inside its limits Rice Lake’s rules apply, not the county’s. Septic permits inside Rice Lake come from St. Louis County (St. Louis County Onsite Wastewater Division · 218-471-7103). 12 rules below are quoted from official sources and independently re-checked, most recently on November 5, 2026. Rules for unincorporated land are on the St. Louis County page.
Land inside Rice Lake city limits.
“The Planning & Zoning Department is responsible for the review of zoning applications and the implementation of land use plans and policies of the City Council through administration of ordinances.”
Land inside Rice Lake city limits, according to the official zoning map and Ordinance #22.
“The City of Rice Lake is divided into the following base zoning districts as regulated in this article, Article 3 and on the Zoning Map.”
Manufactured homes inside Rice Lake city limits.
manufactured-home minimum floor area: >= 800 square feet
“Manufactured homes shall contain a minimum of 800 square feet of floor area.”
Land-use and building permits in shoreland areas and on parcels under 2.5 acres outside shoreland inside Rice Lake city limits.
outside-shoreland parcel size: < 2.5 acres (Sanitary check-off also applies in all shoreland areas.)
“All land use and building permits issued within the shoreland area and parcels of less than 2.5 acres outside the shoreland area shall have the sewage system reviewed to determine if the system is failing or if the proposed land use permit would adversely impact the existing sewage system or the expansion area for a sewage system.”
Premises intended for human occupancy or use that are not required to connect to reasonably available public sewage inside Rice Lake city limits.
“Any other premises intended for human occupancy or use must be provided with an approved method of on-site sewage treatment and dispersal according to the standards of St. Louis County and the State of Minnesota.”
Structures requiring sewage facilities inside Rice Lake city limits.
“Structures that require sewage facilities and are located on a lot serviced by public sewage facilities or to which public sewage facilities are reasonably available shall be required to connect to such facilities subject to the approval of the local unit of government operating the sewage collection/treatment and dispersal system.”
Zoning and subdivision applications inside Rice Lake city limits.
“Citizen/Developer Handouts Development Process Guide Zoning/Subdivision Application Cover Sheet (use with all applications below) CUP or IUP Application Rezone Application Variance Application Site Plan Template”
Rice Lake does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Rural 1 (R1) district inside Rice Lake city limits.
minimum lot area: >= 4.5 acres · minimum lot width/frontage: >= 300 feet
“City of Rice Lake hereby establishes the following set of dimensional standards that will be used in all City zoning districts unless a different standard is provided elsewhere in this ordinance. [...] Rural 1 4.5 300' 10% 50' 25' 50' 50'”
Rural 1 (R1) district inside Rice Lake city limits.
principal-structure side-yard setback: >= 50 feet · accessory-structure side-yard setback: >= 25 feet · principal-structure rear-yard setback: >= 50 feet · accessory-structure rear-yard setback: >= 50 feet
“Minimum Side Yard Setback Minimum Rear Yard Setback Prin. Acc. Prin. Acc. Rural 1 4.5 300' 10% 50' 25' 50' 50'”
Rural 1 (R1) district inside Rice Lake city limits.
maximum lot coverage: <= 10 percent
“Maximum Lot Coverage [...] Rural 1 4.5 300' 10% 50' 25' 50' 50'”
On-site septic matters for building on vacant land inside Rice Lake city limits.
“The Onsite Wastewater Division is responsible for the administration and coordination of onsite wastewater treatment systems throughout St. Louis County.”
Driveway access to a St. Louis County road from land inside Rice Lake city limits.
“The Driveway permit allows for the installation of new driveways or the revision of existing driveways that connect onto county roads.”
We looked and could not find an official answer yet. Silence is not permission; ask Rice Lake or St. Louis County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Rice Lake publishes no rule on the point, not that none exists. St. Louis County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Rice Lake means bringing your own water and power. The kit we’d start with: