Sherburne County, Minnesota
Becker is a city in Sherburne County, Minnesota. Septic permits inside Becker come from Becker. 14 rules below are quoted from official sources and independently re-checked, most recently on November 4, 2026. Rules for unincorporated land are on the Sherburne County page.
Erecting, constructing, enlarging, altering, repairing, moving, improving, removing, converting, or demolishing a building, structure, or covered mechanical component inside Becker city limits.
“without first obtaining a separate building permit from the city”
New, altered, or nonconforming uses in Becker's regulated floodplain.
“until a certificate of zoning compliance shall have been issued by the Zoning Administrator”
A recreational vehicle on private property containing a permanent dwelling in SFD, SFV, AGO, MXD, or MXC single-family-residential-zoned property.
guest-or-visitor-occupancy: <= 30 days per calendar year (RV on private property containing a permanent dwelling)
“may be occupied by a guest or visitor for a period not to exceed thirty (30) days, per calendar year.”
Manufactured homes inside Becker city limits.
“manufactured homes are permitted only in manufactured home park districts”
On-site septic-system construction within Becker's regulated floodplain.
“The Zoning Administrator or other official designated by the Governing Body shall administer and enforce this Ordinance.”
Construction of an on-site septic system within Becker's regulated floodplain.
“prior to the construction of a dam, fence, or on-site septic system;”
Principal buildings in the SFD Single-Family Detached District within 100 feet of a sanitary-sewer/water main.
connection-distance: <= 100 feet (Distance to sanitary sewer / water main)
“Properties within 100 feet of sanitary sewer / water main must connect”
Subdivisions and preliminary plats within Becker city limits.
preliminary-plat decision deadline: <= 120 days (Absent a decision or filed extension, request is approved)
“Before any plat shall have validity, it shall have been approved by the Planning Commission and City Council”
Development, fill, excavation, structures, land-use changes, and other listed activity within Becker's floodplain.
“prior to the placement of fill, excavation of materials, or the storage of materials or equipment within the floodplain;”
City miscellaneous, license, land-use, and zoning fees.
“Land use and zoning fees are included in this schedule”
Building and administrative permits inside Becker city limits.
“Building and administrative permits are now online!”
Becker does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Principal buildings in Becker's SFD Single-Family Detached District.
minimum lot area with public sewer and water: >= 10890 square feet (Maximum is 43,560 square feet (1 acre)) · minimum lot area without public sewer and water: >= 2.5 acres (Properties not within 100 feet of sanitary sewer / water main)
“A Lot Area (minimum/maximum) 10,890 – 43,560 sq. ft. (1 acre)”
Principal buildings in Becker's SFD Single-Family Detached District with public sewer and water.
front-yard setback: >= 30 feet (Corner lots have two front yards) · side-yard setback: >= 10 feet (Street-side corner setback is 30 feet) · rear-yard setback: >= 40 feet
“Front Yard Setback (minimum) 30 ft (corner lots have 2 front yards)”
Driveways and parking pads in SFD, SFV, and residential MXD/MXC districts.
driveway setback: >= 4 feet (Side and rear property lines)
“must be setback a minimum of four (4) feet from side and rear property lines.”
We looked and could not find an official answer yet. Silence is not permission; ask Becker or Sherburne County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Becker publishes no rule on the point, not that none exists. Sherburne County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Becker means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.