Zoning, building permits and septic rules in Sacred Heart, Minnesota

Sacred Heart is a city in Renville County, Minnesota. Sacred Heart adopts its own zoning, so inside its limits Sacred Heart’s rules apply, not the county’s. Septic permits inside Sacred Heart come from Sacred Heart. 10 rules below are quoted from official sources and independently re-checked, most recently on November 5, 2026. Rules for unincorporated land are on the Renville County page.

Answers from the rulebook for Sacred Heart

Sacred Heart’s own rules

  • Building code adoptedAdopted (with conditions)

    Building-code enforcement within Sacred Heart city limits.

    • The city code identifies the state building code as applicable throughout Minnesota and confirms it as the city's building code.
    “Such code is hereby confirmed as the building code of the City of Sacred Heart and incorporated in this ordinance as completely as if set out in full.”
  • Local zoningPresent (with conditions)

    Land inside Sacred Heart city corporate limits.

    • The ordinance jurisdiction is all land within the city's corporate limits.
    “The jurisdiction of this Ordinance shall include all lands within the corporate limits of the City of Sacred Heart, Minnesota.”
  • Living in an RVTemporary only (with conditions)

    Travel and motor homes and coaches used as temporary dwellings on lots or parcels inside Sacred Heart city.

    • Use as a temporary dwelling is limited to no more than four weeks.

    maximum temporary-dwelling period: <= 4 weeks (Travel and motor homes and coaches.)

    “It shall be unlawful for any person to erect or occupy a temporary dwelling on any lot or parcel of land in the city except that travel and motor homes and coaches can be used for such purposes for a period of not over four (4) weeks.”
  • Camping on your landLimited

    Camping or overnight stays in Sacred Heart city parks or recreational areas.

    • Camping or staying overnight is allowed only in areas designated for camping or overnight stays in vehicles or trailers.
    “It shall be unlawful for any person in a park or recreational area to camp or stay overnight except in areas designated for camping or in areas designated for staying overnight in vehicles or trailers.”
  • Who permits septicLocal (with conditions)

    Private wastewater-disposal systems inside Sacred Heart city where public sewer is unavailable.

    • The private-system requirements also incorporate Minnesota Rules Chapter 7080 and applicable local ordinances.
    • Additional requirements may be imposed by MPCA, the Minnesota Department of Health, or other responsible agencies.
    “Before construction of a private wastewater disposal system, the owner(s) shall obtain a written permit signed by the authorized representative. The permit shall not become effective until the installation is completed to the representative's satisfaction.”
  • Septic permitRequired

    Construction of a private wastewater-disposal system inside Sacred Heart city when public sewer is unavailable.

    • A written permit signed by the authorized representative is required before construction.
    • The system must comply with Minnesota Rules Chapter 7080 and applicable local ordinances.
    “Before construction of a private wastewater disposal system, the owner(s) shall obtain a written permit signed by the authorized representative. The permit shall not become effective until the installation is completed to the representative's satisfaction.”
  • Septic inspectionRequired

    Installation of private wastewater-disposal systems inside Sacred Heart city.

    • The applicant must notify the representative when ready for final inspection and before underground portions are covered.
    • The inspection is to be made within 72 hours of notice.

    inspection response period: <= 72 hours (After receipt of notice that the system is ready for final inspection.)

    “The applicant for the permit shall give notification when ready for the system's final inspection, and before any underground portions are covered. The inspection shall be made within 72 hours of receipt of the notice.”
  • Off-grid sanitationLimited

    Private wastewater disposal inside Sacred Heart city where public sewer is unavailable.

    • A private system is allowed only where public sewer is unavailable under Article II.
    • Construction requires a written permit and final inspection.
    • The system must comply with Minnesota Rules Chapter 7080 and applicable local ordinances.
    “Where a public sewer is not available under the provisions of Article II, the building sewer shall be connected to a private wastewater disposal system complying with the provisions of this Article.”
  • Mandatory utility hookupConditional

    Properties inside Sacred Heart city served by, or within 500 feet of, the sanitary sewer collection system.

    • Within 30 days after official notification, properties within 500 feet of the sanitary sewer collection system must install a suitable service connection at the owner's expense.
    • City sanitary sewer and water facilities must be used wherever available or capable of feasible, economical extension in the city's best interests.

    sanitary sewer proximity: <= 500 feet (Measured to a sanitary sewer collection system after official notification.) · connection deadline: <= 30 days (After official notification.)

    “Within 30 days of receiving official notification, the owners of all properties within 500 feet of a sanitary sewer collection system shall install a suitable service connection, at their own expense, in accordance with the provisions of this ordinance.”
  • Permit processPublished (with conditions)

    Land-use permit applications inside Sacred Heart city.

    • Applications must be duplicate forms furnished by the Zoning Administrator and include the City Council-set fee.
    • The Zoning Administrator examines the application and needed site plan, then issues or denies the permit.
    • An unstarted permit becomes void after 90 days; a permit not substantially completed within two years expires and is canceled.

    start-work deadline: <= 90 days (From land-use permit issuance.) · substantial-completion deadline: <= 2 years (From land-use permit issuance.)

    “All applications for land use permits shall be accompanied by the fee as set by the City Council and shall be made in duplicate on forms furnished by the Zoning Administrator.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Sacred Heart or Renville County directly.

  • Owner-builder exemption — Owner-built dwellings inside Sacred Heart city.
  • Inspections — Building construction inside Sacred Heart city.
  • Certificate of occupancy — Occupancy of buildings inside Sacred Heart city.
  • Minimum dwelling size — Principal dwellings inside Sacred Heart city.
  • Lot coverage — Lots inside Sacred Heart city.
9 more unanswered
  • Tiny homes
  • Accessory dwellings
  • Well permit
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Sacred Heart publishes no rule on the point, not that none exists. Renville County’s page lists the county offices to call.