Redwood County, Minnesota
Lamberton is a city in Redwood County, Minnesota. Lamberton adopts its own zoning, so inside its limits Lamberton’s rules apply, not the county’s. 15 rules below are quoted from official sources and independently re-checked, most recently on November 5, 2026. Rules for unincorporated land are on the Redwood County page.
A building or structure erected or moved, or construction started on an existing structure, inside Lamberton city limits.
“No building or structure shall hereafter be erected or moved or construction on an existing structure shall be started until a lawful building permit has been issued by the Zoning Administrator.”
Buildings and land uses inside Lamberton city limits for zoning-ordinance compliance.
“Conduct inspections of buildings and use of land to determine compliance with this Ordinance.”
Land inside Lamberton city limits.
“An ordinance regulating the use of land in the City of Lamberton, Minnesota.”
Zoning districts inside Lamberton city limits.
“Certain districts are hereby created which shall be shown upon the zoning map which is incorporated herein and made a part hereof.”
All dwellings in the R-1 Single Family Residential District inside Lamberton city limits.
minimum floor area: >= 500 square feet
“All dwellings in the R-1 Residential District shall have no less than 500 square feet of floor area.”
Single-family detached residences and other principal uses in the R-1 Single Family Residential District inside Lamberton city limits.
lot area: >= 12600 square feet (Existing lot or contiguous portions of lots of record: 6,000 square feet minimum for a single-family residence.)
“Lot Area: 12,600 square feet; except for a single-family residence to be located on an existing lot or contiguous portions of lots of record, in which a minimum of 6,000 square feet shall be required.”
One-family attached, two-family, and multi-family residences in the R-1 Single Family Residential District inside Lamberton city limits.
front yard: >= 30 feet (Measured from public right-of-way.) · rear yard: >= 30 feet (Measured from public right-of-way or lot line.)
“Front Yard: 30 feet from the public right-of-way. Side Yard: 10% of the lot width, up to a maximum of 15 feet. Rear Yard: 30 feet from the public right-of-way or lot line.”
Lots in the Agricultural (A) District inside Lamberton city limits.
maximum ground coverage: <= 30 percent of zoning lot (All structures combined.)
“The sum total of the ground area covered by all structures shall not exceed 30 percent of the zoning lot on which the structures are located.”
“The total area of all impervious surfaces shall not exceed thirty (30) percent of the lot area.”
Buildings in the Agricultural (A) District inside Lamberton city limits.
maximum height: <= 30 feet (Silos excluded; two and one-half stories maximum.)
“Two and one-half (2 1/2) stories or thirty (30) feet, excluding silos.”
“Two and one-half (2½) stories or thirty (30) feet, maximum height.”
Subdivisions inside Lamberton incorporated limits.
“all subdivisions shall be platted, and shall fully comply with the regulations hereinafter set forth in this Ordinance.”
Mobile-home lots in a mobile-home park inside Lamberton city limits.
“Each park shall abut upon a public street and each mobile home lot shall have direct access to a private road, unless lots are 20,000 square feet or more.”
City permits, certificates, and petitions inside Lamberton city limits.
“The City Council shall determine the fee and collection procedure for all permits, certificates, and petitions. No permit, certificate or petition shall be recognized or issued unless such fee or fees have been paid in full.”
Conditional-use-permit applications under Lamberton's zoning ordinance.
“Applications for Conditional Use Permits shall be made to the Zoning Administrator together with required fees. The application shall be accompanied by a site plan showing such information as is necessary to show compliance with this Ordinance.”
We looked and could not find an official answer yet. Silence is not permission; ask Lamberton or Redwood County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Lamberton publishes no rule on the point, not that none exists. Redwood County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Lamberton means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.